2016-09893. Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Taconite Iron Ore Processing (Renewal)  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Notice.

    SUMMARY:

    The Environmental Protection Agency has submitted an information collection request (ICR), “NESHAP for Taconite Iron Ore Processing (40 CFR part 63, subpart RRRRR) (Renewal)” (EPA ICR No. 2050.06, OMB Control No. 2060-0538), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of the ICR, which is currently approved through April 30, 2016. Public comments were previously requested via the Federal Register (80 FR 32116) on June 5, 2015 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

    DATES:

    Additional comments may be submitted on or before May 31, 2016.

    ADDRESSES:

    Submit your comments, referencing Docket ID Number EPA-HQ-OECA-2012-0693, to: (1) EPA online using www.regulations.gov (our preferred method), or by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW., Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA.

    EPA's policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone number: (202) 564-2970; email address: yellin.patrick@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone number for the Docket Center is 202-566-1744. For additional information about EPA's public docket, visit: http://www.epa.gov/​dockets.

    Abstract: Owners and operators of affected facilities are required to comply with reporting and record keeping requirements for the general provisions of 40 CFR part 63, subpart A, as well as for the specific requirements at 40 CFR part 63, subpart RRRRR. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with the standards.

    Form Numbers: None.

    Respondents/affected entities: Taconite iron ore processing plants.

    Respondent's obligation to respond: Mandatory (40 CFR part 63, subpart RRRRR).

    Estimated number of respondents: 4 (total).

    Frequency of response: Initially and semiannually.

    Total estimated burden: 276 hours (per year). Burden is defined at 5 CFR 1320.3(b).

    Total estimated cost: $326,000 (per year), which includes $298,000 in either annualized capital/startup or operation & maintenance costs.

    Changes in the Estimates: There is an adjustment decrease in the respondent labor hours and the number of responses as currently identified in the OMB Inventory of Approved Burdens. The decrease is due to a decline in the number of respondents. The previous ICR estimated eight facilities; however, recent industry information indicates that only half of these facilities are now in operation.

    There is, however, an adjustment increase in the respondent O&M costs. There is not an actual increase in cost; Start Printed Page 25397rather, the increases occurred because this ICR accounts for contractor costs associated with Method 5 PM tests as an O&M cost, while the previous ICR accounted for this cost as a labor cost.

    Start Signature

    Courtney Kerwin,

    Acting-Director, Collection Strategies Division.

    End Signature End Supplemental Information

    [FR Doc. 2016-09893 Filed 4-27-16; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Published:
04/28/2016
Department:
Environmental Protection Agency
Entry Type:
Notice
Action:
Notice.
Document Number:
2016-09893
Dates:
Additional comments may be submitted on or before May 31, 2016.
Pages:
25396-25397 (2 pages)
Docket Numbers:
EPA-HQ-OECA-2012-0693, FRL-9945-36-OEI
PDF File:
2016-09893.pdf
Supporting Documents:
» Supporting Statement
» Supporting Statement