2022-09142. Proposed Agency Information Collection Activities; Comment Request  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration (FRA), Department of Transportation (DOT).

    ACTION:

    Notice of information collection; request for comment.

    SUMMARY:

    Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA will seek approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.

    DATES:

    Interested persons are invited to submit comments on or before June 27, 2022.

    ADDRESSES:

    Written comments and recommendations for the proposed ICR should be submitted on regulations.gov to the docket, Docket No. FRA-2022-0002. All comments received will be posted without change to the docket, including any personal information provided. Please refer to the assigned OMB control number in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent notice and include them in its information collection submission to OMB for approval.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Hodan Wells, Information Collection Clearance Officer, at email: Hodan.Wells@dot.gov or telephone: (202) 493-0440, or Ms. Stephanie Anderson, Attorney Adviser, at email: Stephanie.Anderson@dot.gov or telephone: (202) 493-0445.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The PRA, 44 U.S.C. 3501-3520, and its implementing regulations, 5 CFR part 1320, require Federal agencies to provide 60-days' notice to the public to allow comment on information collection activities before seeking OMB approval of the activities. See 44 U.S.C. 3506, 3507; 5 CFR 1320.8-1320.12. Specifically, FRA invites interested parties to comment on the following ICR regarding: (1) Whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (2) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (3) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (4) ways for FRA to minimize the burden of information collection activities on the public, including the use of automated collection techniques or other forms of information technology. See 44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1).

    FRA believes that soliciting public comment may reduce the administrative and paperwork burdens associated with the collection of information that Federal statutes and regulations mandate. In summary, FRA reasons that comments received will advance three objectives: (1) Reduce reporting burdens; (2) organize information collection requirements in a “user-friendly” format to improve the use of such information; and (3) accurately assess the resources expended to retrieve and produce information requested. See 44 U.S.C. 3501.

    The summary below describes the ICR that FRA will submit for OMB clearance as the PRA requires:

    Title: Positive Train Control (PTC) and Other Signal Systems.

    OMB Control Number: 2130-0553.

    Abstract: On November 15, 2021, President Joseph R. Biden signed into law the Infrastructure Investment and Start Printed Page 25347 Jobs Act (IIJA).[1] Section 22414 of the Passenger Rail Expansion and Rail Safety Act of 2021, part of the IIJA, impacts FRA's existing Form FRA F 6180.152, the Biannual Report of PTC System Performance, which is one part of the existing information collection request under OMB Control No. 2130-0553. Section 22414 of the IIJA establishes the same reporting requirement as FRA's existing regulations, using the same FRA form number (Form FRA F 6180.152) and content requirements. 49 U.S.C. 20157(m); 49 CFR 236.1029(h). However, the statutory reporting cadence is quarterly, not biannual as FRA's regulations currently require.

    During a recent rulemaking, FRA collected public comment on this reporting requirement. See 85 FR 82400 (Dec. 18, 2020) (Notice of Proposed Rulemaking); 86 FR 40154 (July 27, 2021) (Final Rule) (amending 49 CFR 236.1029(h) and creating Form FRA F 6180.152). During the comment period, FRA received seven sets of generally supportive comments from the following entities and individuals: The American Public Transportation Association; the Association of American Railroads and the American Short Line and Regional Railroad Association (jointly filed); the National Railroad Passenger Corporation (Amtrak); New Jersey Transit; and two individuals.

    Feedback from the public and industry has already been incorporated into the existing Form FRA F 6180.152 that OMB approved in October 2021. See 49 CFR 236.1029(h). The substance of the form remains unchanged in light of the statutory requirements IIJA imposes, as the content required by FRA's existing regulations and Section 22414 of the IIJA are identical in substance. To implement Section 22414 of the IIJA, as codified at 49 U.S.C. 20157(m), the existing OMB-approved Form FRA F 6180.152 would need to be modified only to refer to the new quarterly reporting frequency.

    Accordingly, FRA is hereby proposing to modify Form FRA F 6180.152 to align with the statutory quarterly framework under 49 U.S.C. 20157(m). The modified form would refer to the following quarterly reporting deadlines under 49 U.S.C. 20157(m)(3): April 30 (covering the period from January 1 to March 31), July 31 (covering the period from April 1 to June 30), October 31 (covering the period from July 1 to September 30), and January 31 (covering the period from October 1 to December 31 of the prior calendar year). See 49 U.S.C. 20157(m)(3). To be clear, in the interim, before OMB approves these statutory modifications to Form FRA F 6180.152, host railroads would continue to comply with the following biannual reporting deadlines for Form FRA F 6180.152 under FRA's existing regulations, 49 CFR 236.1029(h)(3): July 31 (covering the period from January 1 to June 30), and January 31 (covering the period from July 1 to December 31 of the prior calendar year). Railroads would transition to the quarterly frequency once OMB approves the modified Form FRA F 6180.152.

    The only other modification FRA proposes to make to Form FRA F 6180.152 is to lock the formatting of instructions and headings in the form so users cannot manipulate those components of the form. FRA is placing the proposed, modified Form FRA F 6180.152 in Docket No. FRA-2022-0002 for review and interested persons are invited to submit comments on or before June 27, 2022.

    For a detailed discussion regarding the reporting metrics in the proposed Quarterly Report of PTC System Performance (Form FRA F 6180.152), please see FRA's Final Rule outlining the comments received and corresponding content requirements under 49 CFR 236.1029(h). See 86 FR 40154, 40157-59, 40163-68 (July 27, 2021); see also 49 U.S.C. 20157(m). FRA may not alter the existing reporting requirements in Form FRA F 6180.152 as they are now statutorily mandated. As a reminder, modified Form FRA F 6180.152 would be identical in substance to existing, OMB-approved Form FRA F 6180.152 (Biannual Report of PTC System Performance) that the public commented on during the 2020-2021 PTC rulemaking. See 85 FR 82400 (Dec. 18, 2020) (Notice of Proposed Rulemaking); 86 FR 40154 (July 27, 2021) (Final Rule). The only material changes to Form FRA F 6180.152 FRA is proposing are those necessary to shift from the biannual framework under FRA's regulations, 49 CFR 236.1029(h), to the new quarterly framework under 49 U.S.C. 20157(m)(3).

    Under the currently approved biannual framework, FRA estimated that each performance report (Form FRA F 6180.152), covering a six-month period, would take 48 hours to prepare. See 86 FR at 40169-71. Under the new statutory quarterly framework, FRA estimates that, on average, each report, covering a shorter period (three months), would take 32 hours to prepare. This estimate is based on the fact that under the quarterly framework, the reporting period would be half as long and, correspondingly, it would take approximately half as long ( i.e., 24 hours) to compile the performance-related data for that period, plus an additional 8 hours to account for any additional administrative burdens in completing the form. Railroads will collect, analyze, and report 365 days' worth of data about their PTC systems' performance under either reporting framework (biannual or quarterly), and FRA estimates that shifting the frequency from biannual (under the existing regulation) to quarterly (under the recent legislation) would result in an increase of 73 reports per year and a burden increase of 1,168 hours total.

    In addition, FRA notes that the Statutory Notification of PTC System Failures (Form FRA F 6180.177) expired by law on December 31, 2021, so FRA proposes to remove that form from this information collection request. See 49 U.S.C. 20157(j). That adjustment would result in a decrease of 144 reports per year and a burden decrease of 144 hours. In summary, FRA proposes two changes to the PRA table— i.e., revising one line item (Form FRA F 6180.152) due to a program change and removing one line item (Form FRA F 6180.177) as it is no longer required by law and the burden associated with this requirement has been completed.

    Type of Request: Revision to a currently approved collection.

    Affected Public: Businesses.

    Form(s): FRA F 6180.152.

    Respondent Universe: 742 railroads.

    Frequency of Submission: On occasion.

    Reporting Burden:

    CFR section/subject 2Respondent universeTotal annual responsesAverage time per responseTotal annual burden hoursTotal annual dollar cost equivalent 3
    235.6(c)—Expedited application for approval of certain changes described in this section42 railroads10 expedited applications5 hours50$3,850
    —Copy of expedited application to labor union42 railroads10 copies30 minutes5385
    Start Printed Page 25348
    —Railroad letter rescinding its request for expedited application of certain signal system changes42 railroads1 letter6 hours6462
    —Revised application for certain signal system changes42 railroads1 application5 hours0.5385
    —Copy of railroad revised application to labor union42 railroads1 copy30 minutes0.539
    236.1—Railroad-maintained signal plans at all interlockings, automatic signal locations, and controlled points, and updates to ensure accuracy700 railroads25 plan changes15 minutes6.25481
    236.15—Designation of automatic block, traffic control, train stop, train control, cab signal, and PTC territory in timetable instructions700 railroads10 timetable instructions30 minutes5385
    236.18—Software management control plan—New railroads2 railroads2 plans160 hours32024,640
    236.23(e)—The names, indications, and aspects of roadway and cab signals shall be defined in the carrier's Operating Rule Book or Special Instructions. Modifications shall be filed with FRA within 30 days after such modifications become effective700 railroads2 modifications1 hour2154
    236.587(d)—Certification and departure test results742 railroads4,562,500 train departures5 seconds6,336.81487,934
    236.905(a)—Railroad Safety Program Plan (RSPP)—New railroads2 railroads2 RSPPs40 hours806,160
    236.913(a)—Filing and approval of a joint Product Safety Plan (PSP)742 railroads1 joint plan2,000 hours2,000240,000
    (c)(1)—Informational filing/petition for special approval742 railroads0.5 filings/approval petitions50 hours251,925
    (c)(2)—Response to FRA's request for further data after informational filing742 railroads0.25 data calls/documents5 hours1.2596
    (d)(1)(ii)—Response to FRA's request for further information within 15 days after receipt of the Notice of Product Development (NOPD)742 railroads0.25 data calls/documents1 hour0.2519
    (d)(1)(iii)—Technical consultation by FRA with the railroad on the design and planned development of the product742 railroads0.25 technical consultations5 hours1.2596
    (d)(1)(v)—Railroad petition to FRA for final approval of NOPD742 railroads0.25 petitions1 hour0.2519
    (d)(2)(ii)—Response to FRA's request for additional information associated with a petition for approval of PSP or PSP amendment742 railroads1 request50 hours503,850
    (e)—Comments to FRA on railroad informational filing or special approval petition742 railroads0.5 comments/letters10 hours5385
    (h)(3)(i)—Railroad amendment to PSP742 railroads2 amendments20 hours403,080
    (j)—Railroad field testing/information filing document742 railroads1 field test document100 hours1007,700
    236.917(a)—Railroad retention of records: results of tests and inspections specified in the PSP13 railroads with PSP13 PSP safety results160 hours2,080160,160
    (b)—Railroad report that frequency of safety-relevant hazards exceeds threshold set forth in PSP13 railroads1 report40 hours403,080
    (b)(3)—Railroad final report to FRA on the results of the analysis and countermeasures taken to reduce the frequency of safety-relevant hazards13 railroads1 report10 hours10770
    236.919(a)—Railroad Operations and Maintenance Manual (OMM)13 railroads1 OMM update40 hours403,080
    (b)—Plans for proper maintenance, repair, inspection, and testing of safety-critical products13 railroads1 plan update40 hours403,080
    (c)—Documented hardware, software, and firmware revisions in OMM13 railroads1 revision40 hours403,080
    236.921 and 923(a)—Railroad Training and Qualification Program13 railroads1 program40 hours403,080
    236.923(b)—Training records retained in a designated location and available to FRA upon request13 railroads350 records10 minutes58.334,491
    236.1001(b)—A railroad's additional or more stringent rules than prescribed under 49 CFR part 236, subpart I38 railroads1 rule or instruction40 hours404,800
    236.1005(b)(4)(i)-(ii)—A railroad's submission of estimated traffic projections for the next 5 years, to support a request, in a PTC Implementation Plan (PTCIP) or a request for amendment (RFA), not to implement a PTC system based on reductions in rail trafficThe burden is accounted for under 49 CFR 236.1009(a) and 236.1021.
    (b)(4)(iii)—A railroad's request for a de minimis exception, in a PTCIP or an RFA, based on a minimal quantity of poisonous-by-inhalation materials traffic7 Class I railroads1 exception request40 hours403,080
    (b)(5)—A railroad's request to remove a line from its PTCIP based on the sale of the line to another railroad and any related request for FRA review from the acquiring railroadThe burden is accounted for under 49 CFR 236.1009(a) and 236.1021.
    Start Printed Page 25349
    (g)(1)(i)—A railroad's request to temporarily reroute trains not equipped with a PTC system onto PTC-equipped tracks and vice versa during certain emergencies38 railroads45 rerouting extension requests8 hours36027,720
    (g)(1)(ii)—A railroad's written or telephonic notice of the conditions necessitating emergency rerouting and other required information under 236.1005(i)38 railroads45 written or telephonic notices2 hours906,930
    (g)(2)—A railroad's temporary rerouting request due to planned maintenance not exceeding 30 days38 railroads720 requests8 hours5,760443,520
    (h)(1)—A response to any request for additional information from FRA, prior to commencing rerouting due to planned maintenance38 railroads10 requests2 hours201,540
    (h)(2)—A railroad's request to temporarily reroute trains due to planned maintenance exceeding 30 days38 railroads160 requests8 hours1,28098,560
    236.1006(b)(4)(iii)(B)—A progress report due by December 31, 2020, and by December 31, 2022, from any Class II or III railroad utilizing a temporary exception under this section262 railroads5 reports16 hours806,160
    (b)(5)(vii)—A railroad's request to utilize different yard movement procedures, as part of a freight yard movements exceptionThe burden is accounted for under 49 CFR 236.1015 and 236.1021.
    236.1007(b)(1)—For any high-speed service over 90 miles per hour (mph), a railroad's PTC Safety Plan (PTCSP) must additionally establish that the PTC system was designed and will be operated to meet the fail-safe operation criteria in appendix CThe burden is accounted for under 49 CFR 236.1015 and 236.1021.
    (c)—An HSR-125 document accompanying a host railroad's PTCSP, for operations over 125 mph38 railroads1 HSR-125 document3,200 hours3,200384,000
    (c)(1)—A railroad's request for approval to use foreign service data, prior to submission of a PTCSP38 railroads0.33 requests8,000 hours2,640203,280
    (d)—A railroad's request in a PTCSP that FRA excuse compliance with one or more of this section's requirements38 railroads1 request1,000 hours1,000120,000
    236.1009(a)(2)—A PTCIP if a railroad becomes a host railroad of a main line requiring the implementation of a PTC system, including the information under 49 U.S.C. 20157(a)(2) and 49 CFR 236.1011264 railroads1 PTCIP535 hours53564,200
    (a)(3)—Any new PTCIPs jointly filed by a host railroad and a tenant railroad264 railroads1 joint PTCIP267 hours26732,040
    (b)(1)—A host railroad's submission, individually or jointly with a tenant railroad or PTC system supplier, of an unmodified Type Approval264 railroads1 document8 hours8616
    (b)(2)—A host railroad's submission of a PTC Development Plan (PTCDP) with the information required under 49 CFR 236.1013, requesting a Type Approval for a PTC system that either does not have a Type Approval or has a Type Approval that requires one or more variances264 railroads1 PTCDP2,000 hours2,000154,000
    (d)—A host railroad's submission of a PTCSPThe burdens are accounted for under 49 CFR 236.1015.
    (e)(3)—Any request for full or partial confidentiality of a PTCIP, Notice of Product Intent (NPI), PTCDP, or PTCSP38 railroads10 confidentiality requests8 hours806,160
    (h)—Any responses or documents submitted in connection with FRA's use of its authority to monitor, test, and inspect processes, procedures, facilities, documents, records, design and testing materials, artifacts, training materials and programs, and any other information used in the design, development, manufacture, test, implementation, and operation of the PTC system, including interviews with railroad personnel38 railroads36 interviews and documents4 hours14411,088
    (j)(2)(iii)—Any additional information provided in response to FRA's consultations or inquiries about a PTCDP or PTCSP38 railroads1 set of additional information400 hours40030,800
    236.1011(a)-(b)—PTCIP content requirementsThe burdens are accounted for under 49 CFR 236.1009(a) and (e) and 236.1021.
    (e)—Any public comment on PTCIPs, NPIs, PTCDPs, and PTCSPs38 railroads2 public comments8 hours161,232
    236.1013—PTCDP and NPI content requirementsThe burdens are accounted for under 49 CFR 236.1009(b), (c), and (e) and 236.1021.
    236.1015—Any new host railroad's PTCSP meeting all content requirements under 49 CFR 236.1015264 railroads1 PTCSP8,000 hours8,000616,000
    Start Printed Page 25350
    (g)—A PTCSP for a PTC system replacing an existing certified PTC system38 railroads0.33 PTCSPs3,200 hours1,05681,312
    (h)—A quantitative risk assessment, if FRA requires one to be submitted38 railroads0.33 assessments800 hours26420,328
    236.1017(a)—An independent third-party assessment, if FRA requires one to be conducted and submitted38 railroads0.33 assessments1,600 hours52863,360
    (b)—A railroad's written request to confirm whether a specific entity qualifies as an independent third party38 railroads0.33 written requests8 hours2.64203
    —Further information provided to FRA upon request38 railroads0.33 sets of additional information20 hours6.6508
    (d)—A request not to provide certain documents otherwise required under Appendix F for an independent, third-party assessment38 railroads0.33 requests20 hours6.6508
    (e)—A request for FRA to accept information certified by a foreign regulatory entity for purposes of 49 CFR 236.1017 and/or 236.1009(i)38 railroads0.33 requests32 hours10.56813
    236.1019(b)—A request for a passenger terminal main line track exception (MTEA)38 railroads1 MTEA160 hours16012,320
    (c)(1)—A request for a limited operations exception (based on restricted speed, temporal separation, or a risk mitigation plan)38 railroads1 request and/or plan160 hours16012,320
    (c)(2)—A request for a limited operations exception for a non-Class I, freight railroad's track10 railroads1 request160 hours16012,320
    (c)(3)—A request for a limited operations exception for a Class I railroad's track7 railroads1 request160 hours16012,320
    (d)—A railroad's collision hazard analysis in support of an MTEA, if FRA requires one to be conducted and submitted38 railroads0.33 collision hazard analysis50 hours16.51,271
    (e)—Any temporal separation procedures utilized under the 49 CFR 236.1019(c)(1)(ii) exceptionThe burdens are accounted for under 49 CFR 236.1019(c)(1).
    236.1021(a)-(d)—Any RFA to a railroad's PTCIP or PTCDP38 railroads10 RFAs160 hours1,600123,200
    (e)—Any public comments, if an RFA includes a request for approval of a discontinuance or material modification of a signal or train control system and a Federal Register notice is published5 interested parties10 RFA public comments16 hours16012,320
    (l)—Any jointly filed RFA to a PTCDP or PTCSPThe burdens are accounted for under 49 CFR 236.1021(a)-(d) and (m).
    (m)—Any RFA to a railroad's PTCSP38 railroads15 RFAs80 hours1,20092,400
    236.1023(a)—A railroad's PTC Product Vendor List, which must be continually updated38 railroads2 updated lists8 hours161,232
    (b)(1)—All contractual arrangements between a railroad and its hardware and software suppliers or vendors for certain immediate notificationsThe burdens are accounted for under 49 CFR 236.1015 and 236.1021.
    (b)(2)-(3)—A vendor's or supplier's notification, upon receipt of a report of any safety-critical failure of its product, to any railroads using the product10 vendors or suppliers10 notifications8 hours806,160
    (c)(1)-(2)—A railroad's process and procedures for taking action upon being notified of a safety-critical failure or a safety-critical upgrade, patch, revision, repair, replacement, or modification, and a railroad's configuration/revision control measures, set forth in its PTCSPThe burdens are accounted for under 49 CFR 236.1015 and 236.1021.
    (d)—A railroad's submission, to the applicable vendor or supplier, of the railroad's procedures for action upon notification of a safety-critical failure, upgrade, patch, or revision to the PTC system and actions to be taken until it is adjusted, repaired, or replaced38 railroads2.5 notifications16 hours403,080
    (e)—A railroad's database of all safety-relevant hazards, which must be maintained after the PTC system is placed in service38 railroads38 database updates16 hours60846,816
    (e)(1)—A railroad's notification to the vendor or supplier and FRA if the frequency of a safety-relevant hazard exceeds the threshold set forth in the PTCDP and PTCSP, and about the failure, malfunction, or defective condition that decreased or eliminated the safety functionality38 railroads8 notifications8 hours644,928
    (e)(2)—Continual updates about any and all subsequent failures38 railroads1 update8 hours8616
    Start Printed Page 25351
    (f)—Any notifications that must be submitted to FRA under 49 CFR 236.1023The burdens are accounted for under 49 CFR 236.1023(e), (g), and (h).
    (g)—A railroad's and vendor's or supplier's report, upon FRA request, about an investigation of an accident or service difficulty due to a manufacturing or design defect and their corrective actions38 railroads0.5 reports40 hours201,540
    (h)—A PTC system vendor's or supplier's reports of any safety-relevant failures, defective conditions, previously unidentified hazards, recommended mitigation actions, and any affected railroads10 vendors or suppliers20 reports8 hours16012,320
    (k)—A report of a failure of a PTC system resulting in a more favorable aspect than intended or other condition hazardous to the movement of a train, including the reports required under part 233The burdens are accounted for under 49 CFR 236.1023(e), (g), and (h) and 49 CFR part 233.
    236.1029(b)(4)—A report of an en route failure, other failure, or cut out to a designated railroad officer of the host railroad150 host and tenant railroads1,000 reports30 minutes50038,500
    Form FRA F 6180.152—49 U.S.C. 20157(m) and 49 CFR 236.1029(h)—Quarterly Report of PTC System Performance (*Revised requirement and updated form*)38 railroads146 reports32 hours4,672359,744
    236.1033—Communications and security requirementsThe burdens are accounted for under 49 CFR 236.1009 and 236.1015.
    236.1035(a)-(b)—A railroad's request for authorization to field test an uncertified PTC system and any responses to FRA's testing conditions38 railroads10 requests40 hours40030,800
    236.1037(a)(1)-(2)—Records retentionThe burdens are accounted for under 49 CFR 236.1009 and 236.1015.
    (a)(3)-(4)—Records retentionThe burdens are accounted for under 49 CFR 236.1039 and 236.1043(b).
    (b)—Results of inspections and tests specified in a railroad's PTCSP and PTCDP38 railroads800 records1 hour80061,600
    (c)—A contractor's records related to the testing, maintenance, or operation of a PTC system maintained at a designated office20 contractors1,600 records10 minutes266.6720,534
    (d)(3)—A railroad's final report of the results of the analysis and countermeasures taken to reduce the frequency of safety-related hazards below the threshold set forth in the PTCSP38 railroads8 final reports160 hours1,28098,560
    236.1039(a)-(c), (e)—A railroad's PTC OMM, which must be maintained and available to FRA upon request38 railroads2 OMM updates10 hours201,540
    (d)—A railroad's identification of a PTC system's safety-critical components, including spare equipment38 railroads1 identified new component1 hour177
    236.1041(a)-(b) and 236.1043(a)—A railroad's PTC Training and Qualification Program ( i.e., a written plan)38 railroads2 programs10 hours201,540
    236.1043(b)—Training records retained in a designated location and available to FRA upon request150 host and tenant railroads150 PTC training record databases1 hour15011,550
    TotalN/A4,567,826 responsesN/A51,9934,329,155

    Total Estimated Annual Responses: 4,567,826.

    Total Estimated Annual Burden: 51,993 hours.

    Total Estimated Annual Burden Hour Dollar Cost Equivalent: $4,329,155.

    FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information that does not display a currently valid OMB control number.

    Authority: 44 U.S.C. 3501-3520; 49 U.S.C. 20157.

    Start Signature

    Brett A. Jortland,

    Deputy Chief Counsel.

    End Signature End Supplemental Information

    Footnotes

    1.  Infrastructure Investment and Jobs Act, Public Law 117-58, 135 Stat. 429 (Nov. 15, 2021). The IIJA was funded in relevant part by the Consolidated Appropriations Act of 2022, which was signed into law on March 15, 2022.

    Back to Citation

    2.  The current inventory exhibits a total burden of 50,969 hours and 4,567,897 responses, while the total burden in this notice is 51,993 hours and 4,567,826 responses. The change in burden is due both to a program change (an increase) and one adjustment (a decrease) as described above in the abstract section.

    3.  The dollar equivalent cost is derived from the 2019 STB Full Year Wage A&B data series using the appropriate employee group hourly wage rate that includes a 75-percent overhead charge. For Executives, Officials, and Staff Assistants, this cost amounts to $120 per hour. For Professional/Administrative staff, this cost amounts to $77 per hour.

    Back to Citation

    [FR Doc. 2022-09142 Filed 4-27-22; 8:45 am]

    BILLING CODE 4910-06-P