99-10747. Environmental Impact Statement: Pitkin, Eagle and Garfield Counties, Colorado  

  • [Federal Register Volume 64, Number 82 (Thursday, April 29, 1999)]
    [Notices]
    [Page 23149]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-10747]
    
    
    
    [[Page 23149]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Federal Highway Administration
    Federal Transit Administration
    
    
    Environmental Impact Statement: Pitkin, Eagle and Garfield 
    Counties, Colorado
    
    AGENCY: Federal Highway Administration (FHWA) and Federal Transit 
    Administration (FTA), DOT.
    
    ACTION: Revised notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The FHWA and FTA are jointly issuing this revised notice to 
    advise the public that the project limits have been extended from the 
    Pitkin County Airport to the City of Aspen, a distance of 3.7 miles; 
    and from Glenwood Springs to West Glenwood, a distance of 2 miles. 
    These extensions are in response to comments received at the public 
    scoping meetings held in February 1998 and subsequent public meetings.
    
    FOR FURTHER INFORMATION CONTACT: Eva LaDow, FHWA Colorado Division, 555 
    Zang Street, Room 250; Lakewood, Colorado 80228. Telephone (303) 969-
    6730 Extension 341. Dave Beckhouse, FTA Region VIII, 216 16th Street, 
    Suite 650; Denver, Colorado 80202, Telephone (303) 844-3242. Joe 
    Tempel, Colorado Department of Transportation, 4201 East Arkansas; 
    Denver, Colorado 80222, Telephone (303) 757-9771.
    
    SUPPLEMENTARY INFORMATION: The FHWA and FTA in cooperation with the 
    Federal Railroad Administration (FRA), the Colorado Department of 
    Transportation (CDOT) and the Roaring Fork Railroad Holding Authority 
    (RFRHA) will prepare an environmental impact statement (EIS) and 
    Section 4(f) evaluation on a proposal to make major transportation 
    improvements in the Roaring Fork Valley from West Glenwood Springs to 
    the City of Aspen, a distance of approximately 44.2 miles. The purpose 
    of these improvements is to accommodate current and projected travel 
    demands through the corridor. The proposed improvements will be 
    identified in a Corridor Investment Study which will be combined with 
    the EIS. The alternatives to be considered in detail in the EIS/4(f) 
    evaluation include the following:
        (1) The No Build Alternative--This alternative will include 
    transportation improvements that are ``committed'' or currently 
    approved transportation projects.
        (2) An Improved Bus/Transportation System Management (TSM) 
    Alternative--This alternative will include an optimal bus alternative 
    on the existing SH 82 alignment and improvements beyond the No Build 
    Alternative that enhance the utility of the existing and committed 
    transportation improvements. A valley wide trail is also included from 
    Glenwood Springs to Aspen.
        (3) The Build Alternative--This alternative consists of rail 
    improvements in the corridor, a feeder bus service to the rail stations 
    and TSM improvements. A valley wide trail is also included from 
    Glenwood Springs to Aspen.
        Comments or questions concerning this proposed action and the CIS/
    EIS/4(f) evaluation should be directed to the Colorado Department of 
    Transportation at the address provided above.
    
        Issued on April 9, 1999.
    Ronald A. Speral,
    Environmental/ROW Program Manager, Colorado Division, Federal Highway 
    Administration, Lakewood, Colorado.
    Louis F. Mraz, Jr.,
    Regional Administrator, Federal Transit Administration, Region VIII, 
    Denver, Colorado.
    [FR Doc. 99-10747 Filed 4-28-99; 8:45 am]
    BILLING CODE 4910-22-M AND 4910-57-M
    
    
    

Document Information

Published:
04/29/1999
Department:
Federal Transit Administration
Entry Type:
Notice
Action:
Revised notice of intent.
Document Number:
99-10747
Pages:
23149-23149 (1 pages)
PDF File:
99-10747.pdf