[Federal Register Volume 63, Number 64 (Friday, April 3, 1998)]
[Notices]
[Pages 16501-16502]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-8842]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5490-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared March 16, 1998 Through March
20, 1998 pursuant to the Environmental Review Process (ERP), under
Section 309 of the Clean Air Act and Section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
564-7167. An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 11, 1997 (62
FR 16154).
Draft EISs
ERP No. D-AFS-G65067-LA Rating EC2, isatchie National Forest Revision
Land and Resource Management Plan, Implementation, Claiborne, Grant,
Natchitoches, Rapides, Vernon, Webster and Winn Parishes, LA.
Summary: EPA has requested additional information in the areas of
Environmental Justice, ecosystem management, NEPA compliance assurances
for future military use activities affecting national forest lands and
cumulative impact assessment summaries for the alternatives considered.
ERP No. D-AFS-L65299-AK Rating EO2, Cascade Point Access Road,
Construction, Maintenance and Operation, Road Easement within National
Forest System land in the vicinity of Echo Cove, EPA Permit, COE
Section 10 and 404 Permits, Juneau, AK.
Summary: EPA expressed environmental objections based on a Purpose
and Need statement that restricted the range of alternatives, and an
inadequate analysis of direct, indirect, and cumulative environmental
impacts to Berners Bay. EPA recommends that more information including
an assessment of impacts about reasonably foreseeable development at
Cascade Point be included.
ERP No. D-COE-E32077-GA Rating EC2, Brunswick Harbor Deepening Federal
Navigation Project, Improvements, Brunswick, Glynn County, GA.
Summary: EPA expressed environmental concerns over the potential
for unacceptable water quality impacts resulting from the extensive
navigation deepening as well as how the necessary mitigation for
project impacts will be designed and implemented.
ERP No. D-DOE-J22005-CO Rating EC2, Rocky Flats Environmental
Technology Site Management of Certain Plutonium Residues and Srub Alloy
Stored, Golden, CO.
Summary: EPA expressed environmental concerns with the alternatives
analysis and recommends developing an on-site storage alternative in
addition to the WIPP alternative.
ERP No. D-USN-K11087-CA Rating EC2, Long Beach Complex Disposal and
Reuse, Implementation, COE Section 10 and 404 Permits, NPDES
[[Page 16502]]
Permit, in the City of Long Beach and Los Angeles County, CA.
Summary: EPA expressed environmental concerns that the proposed
reuse plan could adversely effect sensitive species, air and water
quality. EPA asked that additional information be included in the final
EIS on several issues including various aspects of proposed dredging,
hazardous materials, land use compatibility and environmental justice.
ERP No. D2-DOE-A00163-SC Rating EC2, Accelerator for Production of
Tritium at the Savannah River Site (DOE/EIS-0270D), Site Specific,
Construction and Operation, Aiken and Barnwell Counties, SC.
Summary: EPA had environmental concerns about the proposed project
and requested more information to fully assess the impacts. In
particular, wetlands, groundwater and surface water impact mitigation
warrant further discussion.
Final EISs
ERP No. F-AFS-K82006-CA, Humboldt Nursery Pest Management Plan,
Implementation, Six Rivers National Forest McKinleyville, Humboldt
County, CA.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-DOA-K36119-HI, Waimea-Paauilo Watershed Project, To Alleviate
the Agricultural Water Shortage, Watershed Protection and Flood
Prevention, COE Section 404 Permit. Hawaii County, HI.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-DOE-K08052-00, Navajo Transmission Project (NTP),
Construction, Operation and Maintenance, Right-of-Way Grants, EPA
NPDES, COE, FAA, FWS and FHW Permits Issuance, NV, NM and AZ.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-FRC-L05216-WA, Cushman Hydroelectric Project (FERC No. 460),
Relicensing, North Fork Skokomish River, Mason County, WA.
Summary: EPA objected to issuance of the proposed license, and
noted that without the adoption of the terms, conditions, prescriptions
and recommendations submitted by the Departments of the Interiors and
Commerce, EPA believes the license would result in unsatisfactory
environmental and public welfare impacts in the Skokomish River basin,
including impacts on the treaty-protected rights of the Skokomish
Indian Tribe. EPA recommended that the FERC work with all stakeholders
in this process to define reasonable alternatives that better reflect
the multiple objective associated with the proposed license, and to
provide an accurate assessment of those alternatives in a supplemental
EIS.
ERP No. F-NPS-K61212-CA, San Francisco Maritime National Historical
Park, General Management Plan, Implementation, San Francisco County,
CA.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
Dated: March 31, 1998.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 98-8842 Filed 4-2-98; 8:45 am]
BILLING CODE 6560-50-P