98-11485. Duke Energy New Smyrna Beach Power Company, Ltd., L.L.P., et al. Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 83 (Thursday, April 30, 1998)]
    [Notices]
    [Pages 23773-23776]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-11485]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG98-65-000, et al.]
    
    
    Duke Energy New Smyrna Beach Power Company, Ltd., L.L.P., et al. 
    Electric Rate and Corporate Regulation Filings
    
    April 24, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Duke Energy New Smyrna Beach Power Company, Ltd., L.L.P.
    
    [Docket No. EG98-65-000]
    
        On April 22, 1998, Duke Energy New Smyrna Beach Power Company Ltd, 
    L.L.P. (``Duke New Smyrna''), 422 South Church Street, Legal PB05E, 
    Charlotte, N.C. 28202-1904, filed with the Federal Energy Regulatory 
    Commission an application for determination of exempt wholesale 
    generator status pursuant to Part 365 of the Commission's regulations.
        Duke New Smyrna is a wholly owned, indirect affiliate of Duke 
    Energy Corporation. Duke New Smyrna is developing a power plant 
    consisting of two combustion turbines and one steam turbine with an 
    overall combined capacity of approximately 500 MW. Duke Energy New 
    Smyrna intends to sell capacity and energy from the Facility at 
    wholesale at rates to be negotiated with purchasers. On April 21, 1998, 
    Duke New Smyrna filed an application pursuant to Section 205 of the 
    Federal Power Act for acceptance of its market-based rate schedule.
        Comment date: May 15, 1998, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    2. Massachusetts Department of Telecommunications and Energy
    
    [Docket No. EL98-42-000]
    
        Take notice that on April 14, 1998, the Massachusetts Department of 
    Telecommunications and Energy tendered for filing a Petition for 
    Declaratory Order in the above-referenced docket.
        Comment date: May 21, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    3. Denver City Energy Associates, L.P.
    
    [Docket No. ER97-4084-002]
    
        Take notice that on April 21, 1998, Denver City Energy Associates, 
    L.P. (DCE) tendered for filing a revised Code of Conduct in compliance 
    with the letter order issued March 23, 1998 in Docket No ER97-4084-001.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. New York State Electric & Gas Corporation
    
    [Docket No. ER98-2047-000]
    
        Take notice that on April 10, 1998, New York State Electric & Gas 
    Corporation tendered for filing a Notice of Withdrawal in the above 
    referenced docket.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    5. Rochester Gas and Electric Company
    
    [Docket No. ER98-2561-000]
    
        Take notice that on April 16, 1998, Rochester Gas and Electric 
    Company tendered for filing its quarterly report of transactions for 
    the period January 1, 1998 to March 31, 1998.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Commonwealth Electric Company Cambridge Electric Light Company
    
    [Docket No. ER98-2563-000]
    
        Take notice that on April 16, 1998, Commonwealth Electric Company 
    (Commonwealth) and Cambridge Electric Light Company (Cambridge), 
    collectively referred to as the ``Companies,'' tendered for filing with 
    the Federal Energy Regulatory Commission their quarterly reports under 
    Commonwealth's Market-Based Power Sales Tariff (FERC Electric Tariff 
    Original Volume No. 7) and Cambridge's Market-Based Power Sales Tariff 
    (FERC Electric Tariff Original Volume No. 9) for the period of January 
    1, 1998 to March 31, 1998.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. PJM Interconnection, L.L.C.
    
    [Docket No. ER98-2574-000]
    
        Take notice that on April 17, 1998, PJM Interconnection, L.L.C. 
    (PJM) tendered for filing signature pages (in some instances executed 
    and in other instances unexecuted) of Load Serving entities required to 
    the parties to the Reliability Assurance Agreement among Load Serving 
    Entities in the PJM Control Area (RAA).
        PJM requests a waiver of the Commission's notice requirements to 
    permit an effective date of January 1, 1998 for the addition of the 
    parties to the RAA, consistent with the effective date of the RAA.
        PJM states that it served a copy of its filing on all parties to 
    the RAA, including each of the parties for which a signature page is 
    being tendered with this filing, and each of the state regulatory 
    commissions within the PJM Control Area.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. PJM Interconnection, L.L.C.
    
    [Docket No. ER98-2578-000]
    
        Take notice that on April 17, 1998, PJM Interconnection, L.L.C. 
    (PJM), tendered for filing two executed service agreements with 
    Cargill-Alliant, L.L.C. for point-to-point service under the PJM Open 
    Access Transmission Tariff.
        Copies of this filing were served upon Cargill-Alliant, L.L.C.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    [[Page 23774]]
    
    9. Project Owner, Powerhouse Systems, Inc.
    
    [Docket No. ER98-2611-000]
    
        Take notice that on April 20, 1998, Powerhouse Systems, Inc. filed 
    a conditional tariff filing in compliance with the Commission's order 
    of February 11, 1998, in Connecticut Valley Electric, Inc. v. 
    Wheelabrator Claremont Company, L.P., et al., Docket No. EL94-10-000, 
    et al.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. Wisconsin Electric Power Company
    
    [Docket No. ER98-2616-000]
    
        Take notice that on April 21, 1998, Wisconsin Electric Power 
    Company (Wisconsin Electric) tendered for filing an electric service 
    agreement under its Market Rate Sales Tariff (FERC Electric Tariff, 
    Original Volume No. 8) with Merchant Energy Group of the Americas, Inc. 
    (MEGA). Wisconsin Electric respectfully requests an effective date of 
    May 15, 1998, to allow for economic transactions.
        Copies of the filing have been served on MEGA, the Michigan Public 
    Service Commission, and the Public Service Commission of Wisconsin.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. Wisconsin Electric Power Company
    
    [Docket No. ER98-2617-000]
    
        Take notice that on April 21, 1998, Wisconsin Electric Power 
    Company (Wisconsin Electric) tendered for filing an electric service 
    agreement under its Market Rate Sales Tariff (FERC Electric Tariff, 
    Original Volume No. 8) with Northern/AES Energy, LLC (Northern). 
    Wisconsin Electric respectfully requests an effective date of April 24, 
    1998 to allow for economic transactions.
        Copies of the filing have been served on Northern, the Michigan 
    Public Service Commission, and the Public Service Commission of 
    Wisconsin.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. Nautilus Energy Company, LLC
    
    [Docket No. ER98-2618-000]
    
        Take notice that on April 21, 1998, Nautilus Energy Company, LLC 
    (Nautilus) petitioned the Commission for acceptance of Nautilus Rate 
    Schedule FERC No. 1; the granting of certain blanket approvals, 
    including the authority to sell electricity at market-based rates; and 
    the waiver of certain Commission regulations.
        Nautilus intends to engage in wholesale electric power and energy 
    purchases and sales as a marketer. Nautilus is not in the business of 
    generating or transmitting electric power.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    13. Otter Lane Hydro LLC
    
    [Docket No. ER98-2619-000]
    
        Take notice that on April 21, 1998, Otter Lane Hydro LLC filed a 
    conditional tariff filing in compliance with the Commission's order of 
    February 11, 1998, in Connecticut Valley Electric Company Inc. v. 
    Wheelabrator Claremont Company, L.P., et al., Docket No. EL94-10-000, 
    et al., 82 FERC 61,116 (1998).
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    14. Ohio Power Company
    
    [Docket No. ER98-2620-000]
    
        Take notice that on April 21, 1998, Ohio Power Company (OPC) 
    tendered for filing a Letter Agreement dated February 26, 1998, between 
    OPC, Buckeye Power, Inc. (Buckeye) and Hancock-Wood Electric 
    Cooperative, Inc. (HWEC). HWEC is an Ohio electricity cooperative and a 
    member of Buckeye Power, Inc.
        HWEC has requested OPC provide a delivery point, pursuant to 
    provisions of the Power Delivery Agreement between OPC, Buckeye, The 
    Cincinnati Gas & Electric Company, The Dayton Power and Light Company, 
    Monongahela Power Company, Columbus Southern Power Company and Toledo 
    Edition Company, dated January 1, 1968. OPC requests an effective date 
    of August 7, 1998, for the tendered agreements.
        OPC states that copies of its filing were served upon Hancock-Wood 
    Electric Cooperative, Inc., Buckeye Power, Inc. and the Public 
    Utilities Commission of Ohio.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    15. Rochester Gas and Electric Corporation
    
    [Docket No. ER98-2621-000]
    
        Take notice that on April 21, 1998, Rochester Gas and Electric 
    Corporation (RG&E) filed a Service Agreement between RG&E and NEV East, 
    LLC (Customer). This Service Agreement specifies that the Customer has 
    agreed to the rates, terms and conditions of the RG&E open access 
    transmission tariff filed on July 9, 1996 in Docket No. OA96-141-000.
        RG&E requests waiver of the Commission's sixty (60) day notice 
    requirements and an effective date of April 1, 1998 for the NEV East, 
    LLC Service Agreement. RG&E has served copies of the filing on the New 
    York State Public Service Commission and on the Customer.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. Duke Energy New Smyrna Beach Power Company Ltd., L.L.P.
    
    [Docket No. ER98-2624-000]
    
        Take notice that on April 21, 1998, Duke Energy New Smyrna Beach 
    Power Company Ltd., L.L.P. (Duke New Smyrna) tendered for filing 
    pursuant to Rule 205, 18 CFR Sec. 385.205, an application for an order 
    accepting its rates for filing, determining rates to be just and 
    reasonable, and granting certain waivers and preapprovals.
        Duke New Smyrna is developing an approximately 500 MW generation 
    facility in New Smyrna Beach, Florida. Duke New Smyrna proposes to sell 
    the facility's energy and capacity at market-based rates in the 
    peninsular Florida market. Duke New Smyrna also seeks authority to 
    sell, assign, or transfer transmission rights that it may acquire in 
    the course of its power marketing activities.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Idaho Power Company
    
    [Docket No. ER98-2625-000]
    
        Take notice that on April 21, 1998, Idaho Power Company (IPC) 
    tendered for filing Service Agreements under Idaho Power Company FERC 
    Electric Tariff No. 6, Market Rate Power Sales Tariff, between Idaho 
    Power Company and Tucson Electric Power.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. West Texas Utilities Company
    
    [Docket No. ER98-2627-000]
    
        Take notice that on April 21, 1998, West Texas Utilities Company 
    (WTU) submitted for filing Facilities Schedule A-4 to the 
    Interconnection and Power Interchange Agreement between WTU and Brazos 
    Electric Power Cooperative, Inc. (Brazos), dated December 12, 1996. 
    Facilities Schedule A-4 provides for an interconnection point between 
    WTU and Brazos to permit WTU to serve the City of Hearne, Texas 
    (Hearne).
        WTU requests an effective date of April 16, 1998. Accordingly, WTU 
    requests waiver of the Commission's
    
    [[Page 23775]]
    
    notice requirements. A copy of this filing has been served on Brazos, 
    Hearne, and the Public Utility Commission of Texas.
        A copy of the filing has been provided to the Minnesota Public 
    Utilities Commission and the Minnesota Department of Public Service.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    19. Minnesota Power & Light Company
    
    [Docket No. ER98-2628-000]
    
        Take notice that on April 21, 1998, Minnesota Power & Light Company 
    (Minnesota Power) submitted for filing a transmission service agreement 
    with its merchant operations arm, MPEX, for the provision of firm 
    point-to-point transmission service for MPEX. Minnesota Power requests 
    Commission approval on or before May 28, 1998.
        A copy of the filing has been provided to the Minnesota Public 
    Utilities Commission and the Minnesota Department of Public Service.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. Minnesota Power & Light Company
    
    [Docket No. ER98-2629-000]
    
        Take notice that on April 21, 1998, Minnesota Power & Light Company 
    (Minnesota Power) submitted for filing a service agreement under 
    Minnesota Power's Wholesale Coordination Service tariff WCS-1 by which 
    Minnesota Power's merchant operations arm, MPEX, will deliver power and 
    energy on behalf of Minnkota Power Cooperative, Inc. (Minnkota) using 
    transmission service obtained by MPEX under Minnesota Power's open 
    access transmission tariff. Minnesota Power requests Commission 
    approval on or before May 28, 1998.
        A copy of the filing has been provided to the Minnesota Public 
    Utilities Commission and the Minnesota Department of Public Service.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Niagara Mohawk Power Corporation
    
    [Docket No. ER98-2641-000]
    
        Take notice that on April 21, 1998, Niagara Mohawk Power 
    Corporation (NMPC) tendered for filing an executed Transmission Service 
    Agreement between NMPC and Aquila Power Corporation. The Transmission 
    Service Agreement specifies that Aquila Power Corporation has signed on 
    to and has agreed to the terms and conditions of NMPC's Open Access 
    Transmission Tariff as filed in Docket No. OA96-194-000. The Tariff, 
    filed with FERC on July 9, 1996, will allow NMPC and Aquila Power 
    Corporation to enter into separately scheduled transactions under which 
    NMPC will provide transmission service for Aquila Power Corporation as 
    the parties may mutually agree.
        NMPC requests an effective date of April 9, 1998. NMPC has 
    requested waiver of the notice requirements for good cause shown.
        NMPC has served copies of the filing upon the New York State Public 
    Service Commission and Aquila Power Corporation.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. Niagara Mohawk Power Corporation
    
    [Docket No. ER98-2642-000]
    
        Take notice that on April 21, 1998, Niagara Mohawk Power 
    Corporation (NMPC) tendered for filing an executed Transmission Service 
    Agreement between NMPC and Aquila Power Corporation. The Transmission 
    Service Agreement specifies that Aquila Power Corporation has signed on 
    to and has agreed to the terms and conditions of NMPC's Open Access 
    Transmission Tariff as filed in Docket No. OA96-194-000. The Tariff, 
    filed on July 9, 1996, will allow NMPC and Aquila Power Corporation to 
    enter into separately scheduled transactions under which NMPC will 
    provide transmission service for Aquila Power Corporation as the 
    parties may mutually agree.
        NMPC requests an effective date of April 9, 1998. NMPC has 
    requested waiver of the notice requirements for good cause shown.
        NMPC has served copies of the filing upon the New York State Public 
    Service Commission and Aquila Power Corporation.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. AES Redondo Beach, L.L.C.
    
    [Docket No. ER98-2646-000]
    
        On April 21, 1998, AES Redondo Beach, L.L.C. (AES Redondo Beach), a 
    subsidiary of The AES Corporation, unilaterally tendered for filing 
    pursuant to Section 205 of the Federal Power Act, 16 U.S.C. Sec. 824d, 
    and Rule 205, 18 CFR 285.205, an unexecuted Participating Generator 
    Agreement (Agreement) with the California Independent System Operator 
    Corporation (ISO).
        AES Redondo Beach states that the tendered Agreement is materially 
    identical to the Participating Generator Agreements that the Commission 
    accepted for filing, suspended for a nominal period, and set for 
    hearing on March 30, 1998, in Docket No. ER98-1910-000, et al. It 
    requests that the Commission accept the Agreement for filing, grant 
    waiver of notice so that the Agreement may take effect on the date that 
    AES Redondo Beach acquires a generating facility, and set the Agreement 
    for hearing. AES Redondo Beach states that a copy of its filing has 
    been served on the ISO.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    24. AES Alamitos, L.L.C.
    
    [Docket No. ER98-2647-000]
    
        On April 21, 1998, AES Alamitos, L.L.C. (AES Alamitos), a 
    subsidiary of The AES Corporation, tendered for filing pursuant to 
    Section 205 of the Federal Power Act, 16 U.S.C. Sec. 824d, and Rule 
    205, 18 CFR 285.205, an unexecuted Meter Service Agreement (Agreement) 
    with the California Independent System Operator Corporation (ISO).
        AES Alamitos states that the tendered Agreement is materially 
    identical to the Meter Service Agreements that the Commission accepted 
    for filing, suspended for a nominal period, and set for hearing on 
    March 30, 1998, in Docket No. ER98-1842-000, et al. It requests that 
    the Commission accept the Agreement for filing, to be effective on the 
    date that AES Alamitos acquires a generating facility, and set the 
    Agreement for hearing. AES Alamitos states that a copy of its filing 
    has been served on the ISO.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    25. AES Huntington Beach, L.L.C.
    
    [Docket No. ER98-2648-000]
    
        On April 21, 1998, AES Huntington Beach, L.L.C. (AES Huntington 
    Beach), a subsidiary of The AES Corporation, tendered for filing 
    pursuant to Section 205 of the Federal Power Act, 16 U.S.C. Sec. 824d, 
    and Rule 205, 18 CFR 285.205, an unexecuted Meter Service Agreement 
    (Agreement) with the California Independent System Operator Corporation 
    (ISO).
        AES Huntington Beach states that the tendered Agreement is 
    materially identical to the Meter Service Agreements that the 
    Commission accepted for filing, suspended for a nominal period, and set 
    for hearing on March 30, 1998, in Docket No. ER98-1842-000, et al. It 
    requests that the
    
    [[Page 23776]]
    
    Commission accept the Agreement for filing, to be effective on the date 
    that AES Huntington Beach acquires a generating facility, and set the 
    Agreement for hearing. AES Huntington Beach states that a copy of its 
    filing has been served on the ISO.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    26. AES Huntington Beach, L.L.C.
    
    [Docket No. ER98-2649-000]
    
        Take notice that on April 21, 1998, AES Huntington Beach, L.L.C. 
    (AES Huntington Beach), a limited liability subsidiary of The AES 
    Corporation, unilaterally tendered for filing pursuant to Section 205 
    of the Federal Power Act, 16 U.S.C. Sec. 824d, and Rule 205, 18 CFR 
    285.205, an unexecuted Participating Generator Agreement (Agreement) 
    with the California Independent System Operator Corporation (ISO).
        AES Huntington Beach states that the tendered Agreement is 
    materially identical to the Participating Agreements that the 
    Commission accepted for filing, suspended for a nominal period, and set 
    for hearing on March 30, 1998, in Docket No. ER98-1910-000, et al. It 
    requests that the Commission accept the Agreement for filing, grant 
    waiver of notice so that the Agreement may take effect on the date that 
    AES Huntington Beach acquires a generating facility, and set the 
    Agreement for hearing. AES Huntington Beach states that a copy of its 
    filing has been served on the ISO.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    27. AES Redondo Beach, L.L.C.
    
    [Docket No. ER98-2650-000]
    
        On April 21, 1998, AES Redondo Beach, L.L.C. (AES Redondo Beach), a 
    subsidiary of The AES Corporation, tendered for filing pursuant to 
    Section 205 of the Federal Power Act, 16 U.S.C. Sec. 824d, and Rule 
    205, 18 CFR 285.205, an unexecuted Meter Service Agreement (Agreement) 
    with the California Independent System Operator Corporation (ISO).
        AES Redondo Beach states that the tendered Agreement is materially 
    identical to the Meter Service Agreements that the Commission accepted 
    for filing, suspended for a nominal period, and set for hearing on 
    March 30, 1998, in Docket No. ER98-1842-000, et al. It requests that 
    the Commission accept the Agreement for filing, to be effective on the 
    date that AES Redondo Beach acquires a generating facility, and set the 
    Agreement for hearing. AES Redondo Beach states that a copy of its 
    filing has been served on the ISO.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    28. AES Alamitos, L.L.C.
    
    [Docket No. ER98-2651-000]
    
        Take notice that on April 21, 1998, AES Alamitos, L.L.C. (AES 
    Alamitos), a limited liability subsidiary of The AES Corporation, 
    unilaterally tendered for filing pursuant to Section 205 of the Federal 
    Power Act, 16 U.S.C. Sec. 824d, and Rule 205, 18 CFR 285.205, an 
    unexecuted Participating Generator Agreement (Agreement) with the 
    California Independent System Operator Corporation (ISO).
        AES Alamitos states that the tendered Agreement is materially 
    identical to the Participating Generator Agreements that the Commission 
    accepted for filing, suspended for a nominal period, and set for 
    hearing on March 30, 1998, in Docket Nos. ER98-1910-000, ER98-1912-000, 
    ER98-1930, ER98-1931-000, ER98-1933-000, ER98-1935-000, and ER98-2115-
    000. It requests that the Commission accept the Agreement for filing, 
    grant waiver of notice so that the Agreement may take effect on the 
    date that AES Alamitos acquires a generating facility, and set the 
    Agreement for hearing. AES Alamitos states that a copy of its filing 
    has been served on the ISO.
        Comment date: May 11, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-11485 Filed 4-29-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
04/30/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-11485
Dates:
May 15, 1998, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
23773-23776 (4 pages)
Docket Numbers:
Docket No. EG98-65-000, et al.
PDF File:
98-11485.pdf