DEPARTMENT OF ENERGY
Notice of Intent To Prepare a Supplemental Environmental Impact
Statement, for the Defense Waste Processing Facility, at the Savannah
River Site, Aiken, SC
AGENCY: Department of Energy.
ACTION: Notice of Intent to Prepare a Supplemental Environmental Impact
Statement.
-----------------------------------------------------------------------
SUMMARY: The Department of Energy (DOE) announces its intent to prepare
a Supplemental Environmental Impact Statement (EIS) and to conduct a
public scoping process pursuant to the National Environmental Policy
Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), to examine the
environmental impacts of the modifications made to the Defense Waste
Processing Facility and associated high-level waste facilities at the
Savannah River Site. The Supplemental EIS will supplement the Final
Environmental Impact Statement (EIS) that DOE issued in 1982 (DOE/EIS-
0082), and will evaluate whether and how to proceed with the Defense
Waste Processing Facility in light of the changes in processes and
facilities that have occurred since the 1982 EIS was issued. That EIS,
its Record of Decision, and a subsequent Environmental Assessment,
Waste Form Selection for Savannah River Plant High-Level Waste (DOE/EA-
0179), supported the preferred alternative for the construction and
operation of the Defense Waste Processing Facility. The specific
process and facility modifications that have been introduced or are
being implemented in the Defense Waste Processing Facility system since
the Record of Decision are discussed in the Supplementary Information
section of this Notice of Intent. Background information on the
Savannah River Site and issues proposed to be considered in this
Supplemental EIS are presented in the Supplementary Information below
as well.
DOE also is announcing today its intent to prepare an Environmental
Impact Statement for Waste Management at the Savannah River Site. (See
the notice in this issue of the Federal Register.)
DOE invites individuals, organizations, and agencies to comment on
issues to be considered, alternatives to be analyzed, and environmental
impacts to be addressed in the Supplemental EIS. Written and oral
comments will be given equal weight. Written comments should be
directed to Stephen R. Wright at the address below. Oral comments may
be presented by voice mail at the telephone number below. Interested
parties are invited to present comments at three public scoping
meetings to be held at the dates and places indicated below. Additional
notice will be given in appropriate media. At the scoping meetings and
at informal information sessions held one month earlier, DOE also will
provide the public with an opportunity to engage in informal
discussions with DOE representatives regarding the Defense Waste
Processing Facility. The scoping process and procedures are described
in the Supplementary Information below.
DATES: The public scoping period for the Supplemental EIS begins with
the publication of this notice and continues until May 31, 1994.
Written comments submitted by mail should be postmarked by that date to
ensure consideration. DOE will consider comments mailed after that date
to the extent practicable.
DOE will host a series of informal information sessions to provide
the public with additional information on the Defense Waste Processing
Facility and the proposed actions and alternatives discussed in this
Notice of Intent. These sessions are intended to promote conversation
with DOE representatives available to answer questions. These informal
sessions are scheduled at the following times and locations:
April 12, 1994; 1-4 and 6-9 p.m.; North Augusta Community
Center, 495 Brookside Avenue, North Augusta, South Carolina.
April 19, 1994; 1-4 and 6-9 p.m.; DeSoto Hilton Hotel, 15
Liberty Street, Savannah, Georgia.
April 21, 1994; 1-4 and 6-9 p.m.; Holiday Inn Coliseum at
University of South Carolina, 630 Assembly Street, Columbia, South
Carolina.
Information sessions on two related EISs--the Interim Waste
Management of Nuclear Materials at the Savannah River Site EIS (Notice
of Intent published March 17, 1994; 59 FR 12588), and the Savannah
River Site Waste Management EIS--will be held at the same dates and
locations.
DOE will then conduct public scoping meetings to assist in defining
the appropriate scope of the Defense Waste Processing Facility
Supplemental EIS and identifying significant environmental issues to be
addressed. DOE representatives will be available at the meetings to
discuss, in informal conversations, the Defense Waste Processing
Facility. These meetings are scheduled at the following times and
locations:
May 12, 1994; 1-4 and 6-9 p.m.; Coastal Georgia Center for
Continuing Education, 305 Martin Luther King Boulevard (Battlefield
Park), Savannah, Georgia.
May 17, 1994; 1-4 and 6-9 p.m.; North Augusta Community Center,
495 Brookside Avenue, North Augusta, South Carolina.
May 19, 1994; 1-4 and 6-9 p.m.; Holiday Inn Coliseum at the
University of South Carolina, 630 Assembly Street, Columbia, South
Carolina.
Scoping meetings on the Interim Management of Nuclear Materials at
the Savannah River Site EIS and the Savannah River Site Waste
Management EIS will be held at the same dates and locations. DOE will
publish additional notices of the information sessions and scoping
meetings in the local media in advance of the scheduled dates.
ADDRESSES: Comments on the scope of the Defense Waste Processing
Facility Supplemental EIS, requests to speak at the public scoping
meetings, and requests for copies of the EIS Implementation Plan or
draft Supplemental EIS (when available) should be directed to: Mr.
Stephen R. Wright, U.S. Department of Energy, Savannah River Operations
Office, P.O. Box 5031, Aiken, SC 29804-5031; (803) 725-3957 or (800)
242-8269. Envelopes should be marked: ``Savannah River Site Defense
Waste Processing Facility Supplemental EIS.''
FOR FURTHER INFORMATION CONTACT: Questions regarding the Supplemental
EIS should be addressed to: Karen Poore, High Level Waste Division,
U.S. Department of Energy, Savannah River Operations Office, P.O. Box
A, Aiken, SC 29802; (803) 725-2827.
Questions regarding the DOE NEPA process should be addressed to:
Carol M. Borgstrom, Director, Office of NEPA Oversight (EH-25), U.S.
Department of Energy, 1000 Independence Avenue, SW., Washington, DC
20855; (202) 586-4600 or leave a message at (800) 472-2765.
SUPPLEMENTARY INFORMATION:
Background
The Savannah River Site occupies approximately 300 square miles
adjacent to the Savannah River, primarily in Aiken and Barnwell
Counties in South Carolina. The Site is approximately 25 miles
southeast of Augusta, Georgia, and 20 miles south of Aiken, South
Carolina. Since its establishment, the mission of the Savannah River
Site has been to produce nuclear materials that support the defense,
research, and medical programs of the United States.
At present, the Savannah River Site is in transition to other
missions, which include increased emphasis on waste management,
environmental restoration, and decontamination and decommissioning.
With these mission changes in mind, DOE is examining its integrated
waste management program and the suitability of existing and planned
facilities. The Defense Waste Processing Facility is one of the vital
components of the waste management program at Savannah River Site.
In 1982 DOE published an EIS and a Record of Decision documenting
its decision to construct and operate the Defense Waste Processing
Facility, which would immobilize liquid high-level radioactive waste in
glass (vitrification). The vitrified waste would then be encapsulated
in stainless steel canisters and stored onsite until a geologic
repository is available for final disposal. DOE then modified the
Defense Waste Processing Facility to improve facility efficiency and
safety. A Supplement Analysis was prepared to determine whether
modifications as of 1990, primarily the introduction of the In-Tank
Precipitation process and manufacture and disposal of saltstone,
required the preparation of a supplement to the Defense Waste
Processing Facility EIS. On the basis of the Supplement Analysis, DOE
concluded in 1991 that a Supplemental EIS was not needed.
Further modifications to the Defense Waste Processing Facility
system have now been proposed and are in various stages of
implementation, including process safety enhancement and a Late Wash
Facility. In view of the accumulated changes and the near-term
(estimated 1996) initial operation of the facility, DOE believes that a
focused EIS-level review of the environmental impacts of the facility
as now envisioned would be timely and appropriate.
The specific process and facility modifications that are being
implemented in the Defense Waste Processing Facility system since the
Record of Decision include:
In-Tank Precipitation--The original Defense Waste Processing
Facility design used ion exchange to separate soluble radionuclides
from salt solution. Research and development efforts indicated that an
in-tank precipitation process would remove more than 99.9 percent of
the radioactivity in salt solution. DOE has incorporated the In-Tank
Precipitation process as a replacement for ion exchange as a Defense
Waste Processing Facility modification.
Saltstone Manufacturing and Disposal--The process of salt solution
disposal originally involved dewatering decontaminated salt solution,
mixing it with concrete to form ``saltcrete,'' and burying it in an
engineered trench. The present design would blend decontaminated salt
solution from the in-tank precipitation process with a waste
concentrate stream from the F- and H-Area Effluent Treatment Facility,
mix it with cement-flyash grout to form ``saltstone,'' and dispose of
it in reinforced concrete vaults.
Late-Wash Facility--This new facility would give precipitate slurry
from the In-Tank Precipitation process a final wash to reduce the
concentration of nitrite and radiolysis products. The result would be
the ability to process precipitate in the Defense Waste Processing
Facility vitrification process.
Nitric Acid Introduction--This process would add nitric rather than
formic acid to the sludge in the Sludge Receipt and Adjustment Tank to
bring nitrate concentrations to the desired levels.
Hydrogen Modifications--These modifications to the ventilation
system would provide additional dilution air to components in the
vitrification facility to mitigate the potential formation of hydrogen
gas in flammable concentrations.
Ammonia Mitigation Modification--The installation of ammonia-
reducing scrubbers at several locations in the process vessel
ventilation system would mitigate a potential safety hazard from the
accumulation of solid ammonium nitrate.
Benzene Treatment--The proposed treatment option for benzene
generated at the Defense Waste Processing Facility is the Consolidated
Incineration Facility. Environmental Protection Agency regulations name
incineration as the current Best Demonstrated and Available Technology
for benzene. The Supplemental EIS will evaluate alternatives to this
treatment option for benzene from the Defense Waste Processing
Facility.
Related EISs
The Savannah River Waste Management EIS, also announced in this
issue of the Federal Register, will address treatment, storage, and
disposal alternatives for a variety of wastes, whereas the Defense
Waste Processing Facility Supplemental EIS will evaluate the cumulative
impacts of specific modifications to the Defense Waste Processing
Facility system. The Waste Management EIS will include waste facilities
associated with Defense Waste Processing Facility, such as the
treatment of waste water discharges in the F- and H-Area Effluent
Treatment Facility, F- and H-Area Tank Farm, and the construction and
operation of a high-level radioactive waste evaporator in the H-Area
Tank Farm. The Waste Management EIS also will evaluate alternatives to
the Consolidated Incineration Facility technology for mixed waste
(includes radioactive constituents in addition to hazardous
constituents such as benzene). The documents will be prepared in close
coordination.
DOE proposes to perform the Defense Waste Processing Facility
review in a supplement to the 1982 EIS for the Defense Waste Processing
Facility. Although the analysis could be included in the Savannah River
Site Waste Management EIS, DOE believes public review and DOE's
decision making process would be facilitated by preparing a separate
document, because the Defense Waste Processing Facility is a very
specialized operation with limited connections to the activities to be
covered in the Waste Management EIS. Where there are interconnections,
duplicate discussions within both documents may be required or the
documents will cross reference one another.
Activities at the Defense Waste Processing Facility have proceeded
on the basis of the 1982 EIS and Record of Decision. Construction of
the Defense Waste Processing Facility is almost complete, testing of
the system with chemicals has begun, and processing runs of simulated
(non-radioactive) material will begin in the next few months. DOE
committed in an agreement with the Environmental Protection Agency and
the State of South Carolina to adhere to a schedule that provides for
testing with radionuclides to begin in December, 1995. In order to
support that schedule and to manage efficiently the high level
radioactive waste contained in the tank farms, in-tank precipitation
must begin in late 1994 or early 1995. A supplemental EIS focussing on
the changes to the Defense Waste Processing Facility can be completed
in time to meet this schedule, while the Waste Management EIS is
expected to take several more months to prepare. Delay of start-up for
the Defense Waste Processing Facility would cost approximately
$21,000,000 per month.
The Supplemental EIS will examine all reasonably foreseeable
impacts of operating the Defense Waste Processing Facility, including
alternative methods of managing the waste streams from the facility.
DOE believes that this will provide sufficient information to decide
whether to proceed with operation of the facility in advance of
completion of the Waste Management EIS.
Preliminary Description of Defense Waste Processing Facility
Supplemental EIS Alternatives
(1) The Proposed Action Alternative
Since completion of the 1982 EIS and as a result of the Defense
Waste Processing Facility modifications, new information about the
Defense Waste Processing Facility process has become available to which
the public has not yet had full access. The proposed action of this
Supplemental EIS is to continue construction and begin operation of
Defense Waste Processing Facility as currently designed. DOE would
continue the Defense Waste Processing Facility process and facility
modifications that are currently underway, would complete startup
testing activities, and would operate the facility upon completion of
startup testing. Analysis of the proposed action will allow DOE to
determine whether the decisions reached as a result of the 1982 EIS
remain valid in light of process and facility modifications over the
last 12 years.
(2) The Alternative Actions
DOE will examine whether there are other reasonable system
alternatives for the Defense Waste Processing Facility (in the context
of its current state of construction) such as mitigation measures,
pollution prevention efforts, and facility design or process
modifications that could reduce the risk of operation. Conclusions
reached in the 1982 EIS concerning alternatives to constructing and
operating the Defense Waste Processing Facility will also be reviewed
to assess whether technology developments have occurred that might
influence those decisions.
(3) The ``No Action'' Alternative
DOE will analyze a no-action alternative under which current waste
generation and waste management practices would continue. That is,
high-level liquid radioactive waste would remain in the tanks. Although
the no-action alternative may not be a reasonable alternative in all
respects, its analysis will establish a baseline for comparison of the
environmental impacts of the proposed action and its alternatives.
Identification of Environmental Issues
The Supplemental EIS will analyze the following environmental
issues applicable to the operation of the Defense Waste Processing
Facility, consistent with discussion above in the Background section.
Modifications to this list might occur as a result of the scoping
process.
1. Public and worker safety and health risk assessment:
radiological and nonradiological impacts of the proposed action and
alternatives, including projected effects on workers and the public
from construction, normal operation, and potential accidents.
2. Impacts from releases to air, water, and soil.
3. Impacts to plants, animals, and habitat, including impacts to
wetlands, and threatened or endangered species and their habitat.
4. The consumption of natural resources and energy including water,
natural gas, and electricity.
5. Impacts of the transportation of construction and operation
supplies, materials, equipment, products, and wastes to, from, and
within the site.
6. Socioeconomic impacts to affected communities from construction
and operational labor forces and expenditures.
7. Environmental Justice: Disproportionately high or adverse human
health and environmental effects on minority and low-income
populations.
8. Impacts to cultural resources such as historic, archaeological,
scientific, or culturally important sites.
9. Accuracy of projected waste volumes.
10. Status of compliance with applicable Federal, state, and local
statutes and regulations.
11. Cumulative impacts from the proposed action and other past,
present, and reasonably foreseeable future actions at Savannah River
Site.
12. Potential irreversible and irretrievable commitments of
resources.
13. Pollution prevention, waste minimization, and potential
mitigative measures.
Related Documentation
Completed and ongoing environmental reviews may affect the scope of
the Defense Waste Processing Facility Supplemental EIS. DOE has
published or is preparing several NEPA documents on waste management
activities at Savannah River Site, including the following:
Waste Management Operations, ERDA-1537, 1977.
Long-Term Management of Defense High-Level Radioactive Wastes
(Research and Development Program for Immobilization), DOE/EIS-0023,
1979.
Defense Waste Processing Facility, DOE/EIS-0082, 1982.
Waste Form Selection for Savannah River Plant High-Level Waste,
DOE/EA-0179, 1982.
Waste Management Activities for Groundwater Protection, DOE/EIS-
0120, 1987.
Consolidated Incineration Facility, DOE/EA-0400, 1992.
Interim Management of Nuclear Materials at the Savannah River
Site, EIS being developed.
Waste Management at the Savannah River Site, EIS being
developed.
Public Meetings
DOE will host a series of informal information sessions to provide
the public with additional information on the Defense Waste Processing
Facility and the proposed actions and alternatives discussed in this
Notice of Intent. These sessions are intended to promote conversation
with DOE representatives available to answer questions.
Oral and written comments will be received at public scoping
meetings to be held at the locations and times indicated above. The
meetings will be chaired by a presiding officer and attended by DOE
officials. The public scoping meetings will not be conducted as
evidentiary hearings; speakers will not be cross-examined, although the
presiding officer and DOE representatives present may ask clarifying
questions. The DOE panel members will respond to comments and questions
from the public. In addition, DOE representatives will be available to
discuss the Defense Waste Processing Facility in informal
conversations.
To facilitate scheduling of speakers, requests to speak at these
meetings may be made in advance by calling (800) 242-8269 between 8:30
a.m. and 5:00 p.m. Eastern Time, Monday through Friday, or by calling
Mr. Stephen R. Wright at (803) 725-3957 at least two days before the
designated meeting. To ensure that everyone has an adequate opportunity
to speak, five minutes will be allotted each speaker. Depending on the
number of persons who request an opportunity to speak, the presiding
officer may allow more time for speakers representing multiple parties
or organizations. Persons wishing to speak on behalf of organizations
should identify the organization in their request. Persons who have not
submitted an advance request to speak may register at the meetings and
will be called on to speak in the order of registration as time
permits. Written comments also will be accepted at the meetings, and
speakers are encouraged to provide written versions of their oral
comments for the record. DOE will prepare transcripts of the scoping
meetings. Individuals may review the transcripts, other NEPA documents,
and background information on Defense Waste Processing Facility at the
following DOE public reading rooms during normal business hours.
U.S. Department of Energy Reading Room, University of South
Carolina, Aiken Campus, University Library--2nd Floor, University
Parkway, Aiken, SC 29801; (803) 648-6851.
U.S. Department of Energy, Freedom of Information Reading Room,
Room 1E-190, Forrestal Building, 1000 Independence Avenue, SW,
Washington, DC 20585; (202) 586-6020.
Development of the Defense Waste Processing Facility Supplemental EIS
DOE will consider comments and suggestions received during the
scoping period in its preparation of the draft Supplemental EIS.
Results of the scoping process (including a summary of comments
received, DOE's response to public comments, and an outline of the
intended scope and environmental issues to be discussed in the
Supplemental EIS) will be presented in a publicly available
Implementation Plan. Upon completing the draft Supplemental EIS, DOE
will announce its availability in the Federal Register and local media,
and will again solicit public comments. DOE will consider comments on
the draft Supplemental EIS in its preparation of the final Supplemental
EIS.
Schedule. The preliminary schedule for preparation of this
Supplemental EIS is as follows:
Availability of Implementation Plan: June 1994.
Availability of draft Defense Waste Processing Facility
Supplemental EIS: July 1994.
Draft Supplemental EIS Public Comment Period: August-September
1994.
Availability of final Defense Waste Processing Facility
Supplemental EIS: October 1994.
Record of Decision: November 1994.
Issued in Washington, DC, on April 1, 1994.
Tara O'Toole,
Assistant Secretary, Environment, Safety and Health.
[FR Doc. 94-8313 Filed 4-5-94; 8:45 am]
BILLING CODE 6450-01-P