Start Preamble
AGENCY:
Millennium Challenge Corporation.
SUMMARY:
The Millennium Challenge Corporation (MCC) is reporting for the quarter October 1, 2010 through December 31, 2010, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (http://www.mcc.gov) in accordance with section 612(b) of the Act.
Start SignatureDated: March 29, 2011.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge Corporation.
Assistance Provided Under Section 605
Projects Obligated Objectives Cumulative expenditures Measures Country: Madagascar Year: 2011 Quarter 1 Total obligation: $87,998,166 Entity to which the assistance is provided: MCA Madagascar Total Quarterly Expenditures1: $12,976 Land Tenure Project $30,123,098 Increase Land Titling and Security $29,304,770 Area secured with land certificates or titles in the Zones. Legal and regulatory reforms adopted. Number of land documents inventoried in the Zones and Antananarivo. Number of land documents restored in the Zones and Antananarivo. Number of land documents digitized in the Zones and Antananarivo. Average time for Land Services Offices to issue a duplicate copy of a title. Average cost to a user to obtain a duplicate copy of a title from the Land Services Offices. Number of land certificates delivered in the Zones during the period. Number of new guichets fonciers operating in the Zones. The 256 Plan Local d'Occupation Foncier—Local Plan of Land Occupation (PLOFs) are completed. Financial Sector Reform Project $25,705,099 Increase Competition in the Financial Sector $23,535,781 Volume of funds processed annually by the national payment system. Number of accountants and financial experts registered to become CPA. Number of Central Bank branches capable of accepting auction tenders. Outstanding value of savings accounts from CEM in the Zones. Number of MFIs participating in the Refinancing and Guarantee funds. Maximum check clearing delay. Network equipment and integrator. Real time gross settlement system (RTGS). Telecommunication facilities. Retail payment clearing system. Number of CEM branches built in the Zones. Number of savings accounts from CEM in the Zones. Percent of Micro-Finance Institution (MFI) loans recorded in the Central Bank database. Start Printed Page 19132 Agricultural Business Investment Project $13,687,987 Improve Agricultural Projection Technologies and Market Capacity in Rural Areas $13,582,534 Number of farmers receiving technical assistance. Number of marketing contracts of ABC clients. Number of farmers employing technical assistance. Value of refinancing loans and guarantees issued to participating MFIs (as a measure of value of agricultural and rural loans). Number of Mnistère de l'Agriculture, de l'Elevage et de la Pêche- Ministry of Agriculture, Livestock, and Fishing (MAEP) agents trained in marketing and investment promotion. Number of people receiving information from Agricultural Business Center (ABCs) on business opportunities. Program Administration 2 and Control, Monitoring and Evaluation $18,481,991 $17,802,882 Pending subsequent reports 3 $1,368,813 FY2010 Madagascar post-compact disbursement related to final payment of audit expenses. Projects Obligated Objectives Cumulative expenditures Measures Country: Honduras Year: 2011 Quarter 1 Total obligation: $205,000,000 Entity to which the assistance is provided: MCA Honduras Total Quarterly Expeditures1: $7,025,275 Rural Development Project $68,273,380 Increase the productivity and business skills of farmers who operate small and medium-size farms and their employees $68,197,673 Number of program farmers harvesting high-value horticulture crops. Number of hectares harvesting high-value horticulture crops. Number of business plans prepared by program farmers with assistance from the implementing entity. Total value of net sales. Total number of recruited farmers receiving technical assistance. Value of loans disbursed to farmers, agribusiness, and other producers and vendors in the horticulture industry, including Program Farmers, cumulative to date, Trust Fund Resources. Number of loans disbursed (disaggregated by trust fund, leveraged from trust fund, and institutions receiving technical assistance from ACDI-VOCA). Number of hectares under irrigation. Number of farmers connected to the community irrigation system. Transportation Project $120,591,240 Reduce transportation costs between targeted production centers and national, regional and global markets $121,211,917 Freight shipment cost from Tegucigalpa to Puerto Cortes. Average annual daily traffic volume—CA-5. International roughness index (IRI)—CA-5. Kilometers of road upgraded—CA-5. Percent of contracted road works disbursed—CA-5. Average annual daily traffic volume—secondary roads. International roughness index (IRI)—secondary roads Kilometers of road upgraded—secondary roads. Average annual daily traffic volume—rural roads. Average speed—Cost per journey (rural roads) Kilometers of road upgraded—rural roads. Percent disbursed for contracted studies. Value of signed contracts for feasibility, design, supervision and program mgmt contracts. Kilometers (km) of roads under design. Start Printed Page 19133 Number of Construction works and supervision contracts signed. Kilometers (km) of roads under works contracts. Program Administration,2 and Control, Monitoring and Evaluation $16,135,380 $15,081,707 Pending subsequent reports 3 $0 Start Printed Page 19134Projects Obligated Objectives Cumulative expenditures Measures Country: Cape Verde Year: 2011 Quarter 1 Total obligation: $110,078,488 Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Expenditures1: $2,055,100 Watershed and Agricultural Support Project $12,031,549 Increase agricultural production in three targeted watershed areas on three islands $11,264,926 Productivity: Horticulture, Paul watershed. Productivity: Horticulture, Faja watershed. Productivity: Horticulture, Mosteiros watershed. Number of farmers adopting drip irrigation: All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Area irrigated with drip irrigation: All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Irrigation Works: Percent contracted works disbursed. All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Number of reservoirs constructed in all intervention watersheds (Paul, Faja and Mosteiros) (incremental). Number of farmers that have completed training in at least 3 of 5 core agricultural disciplines: All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Infrastructure Improvement Project $82,630,208 Increase integration of the internal market and reduce transportation costs $78,967,304 Travel time ratio: percentage of beneficiary population further than 30 minutes from nearest market. Kilometers of roads rehabilitated. Percent of contracted Santiago Roads works disbursed (cumulative). Percent of contracted Santo Antao Bridge works disbursed (cumulative). Port of Praia: percent of contracted port works disbursed (cumulative). Cargo village: percent of contracted works disbursed (cumulative). Quay 2 improvements: percent of contracted works disbursed (cumulative). Access road: percent of contracted works disbursed (cumulative). Private Sector Development Project $1,931,223 Spur private sector development on all islands through increased investment in the priority sectors and through financial sector reform $1,595,002 MFI portfolio at risk, adjusted (level). Program Administration,2 and Control, Monitoring and Evaluation $13,485,508 $12,509,672 Pending subsequent reports 3 $516,776 Start Printed Page 19135Projects Obligated Objectives Cumulative expenditures Measures Country: Nicaragua Year: 2011 Quarter 1 Total obligation: $113,478,345 Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Expenditures1: $ 1,561,680 Property Regularization Project $7,180,454 Increase Investment by strengthening property rights $6,289,228 Automated database of registry and cadastre installed in the 10 municipalities of Leon. Value of land, urban. Value of land, rural. Time to conduct a land transaction. Number of additional parcels with a registered title, urban. Number of additional parcels with a registered title, rural. Area covered by cadastral mapping. Cost to conduct a land transaction. Transportation Project $58,000,000 Reduce transportation costs between Leon and Chinandega and national, regional and global markets $54,867,252 Annual Average daily traffic volume: N1 Section R1. Annual Average daily traffic volume: N1 Section R2. Annual Average daily traffic volume: Port Sandino (S13). Annual Average daily traffic volume: Villanueva—Guasaule Annual. Average daily traffic volume: Somotillo-Cinco Pinos (S1). Annual average daily traffic volume: León-Poneloya-Las Peñitas. International Roughness Index: N-I Section R1. International Roughness Index: N-I Section R2. International Roughness Index: Port Sandino (S13). International roughness index: Villanueva—Guasaule. International roughness index: Somotillo-Cinco Pinos. International roughness index: León-Poneloya-Las Peñitas. Kilometers of NI upgraded: R1 and R2 and S13. Kilometers of NI upgraded: Villanueva—Guasaule. Kilometers of S1 road upgraded. Kilometers of S9 road upgraded. Rural Development Project $32,875,845 Increase the value added of farms and enterprises in the region $30,603,852 Number of beneficiaries with business plans. Numbers of manzanas (1 Manzana = 1.7 hectares), by sector, harvesting higher-value crops. Number of beneficiaries with business plans prepared with assistance of Rural Business Development Project. Number of beneficiaries implementing Forestry business plans under Improvement of Water Supplies Activity. Number of Manzanas reforested. Number of Manzanas with trees planted. Program Administration,2 Due Diligence, Monitoring and Evaluation $15,422,046 $14,172,209 Pending subsequent reports 3 $1,496,404 Projects Obligated Objectives Cumulative expenditures Measures Country: Georgia Year: 2011 Quarter 1 Total obligation: $395,300,000 Entity to which the assistance is provided: MCA Georgia Total Quarterly Expenditures1: $20,153,289 Regional Infrastructure Rehabilitation Project $313,250,000 Key Regional Infrastructure Rehabilitated $266,179,261 Household savings from Infrastructure Rehabilitation Activities. Savings in vehicle operating costs (VOC). International roughness index (IRI). Annual average daily traffic (AADT). Travel Time. Road paved/completed. Construction Works completed (Contract 1). Construction Works completed (Contract 2). Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers of roads under design. Signed contracts for road works. Kilometers of roads under works contracts. Sites rehabilitated (phases I, II, III)—pipeline. Construction works completed (phase II)—pipeline. Savings in household expenditures for all RID subprojects. Population Served by all RID subprojects. RID Subprojects completed. Value of RID Grant Agreements signed. Value of project works and goods contracts Signed. RID subprojects with works initiated. Regional Enterprise Development Project $52,530,800 Enterprises in Regions Developed $45,474,493 Jobs Created by Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF). Household net income—ADA and GRDF. Jobs created—ADA. Firm income—ADA. Household net income—ADA. Beneficiaries (direct and indirect)—ADA. Grant agreements signed—ADA. Increase in gross revenues of portfolio companies (PC). Increase in portfolio company employees. Increase in wages paid to the portfolio company employees. Portfolio companies (PC). Funds disbursed to the portfolio companies. Program Administration,2 Due Diligence, Monitoring and Evaluation $29,519,200 $22,483,134 Pending subsequent reports 3 $7,304,772 November 2008, MCC and the Georgian Government signed a Compact amendment making up to $100 million of additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30, 2009. Projects Obligated Objectives Cumulative expenditures Measures Country: Vanuatu Year: 2011 Quarter 1 Total obligation: $65,690,000 Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Expenditures1: $1,209,129 Transportation Infrastructure Project $60,090,228 Facilitate transportation to increase tourism and business development $59,601,565 Traffic volume (average annual daily traffic)—Efate: Ring Road. Traffic Volume (average annual daily traffic)—Santo: East Coast Road. Kilometers of road upgraded—Efate: Ring Road. Kilometers of roads upgraded—Santo: East Coast Road. Percent of contracted roads works disbursed (USD disbursed): Total (Cumulative). Start Printed Page 19136 Program Administration,2 Due Diligence, Monitoring and Evaluation $5,599,772 $4,416,275 Pending subsequent reports 3 $19,948 Projects Obligated Objectives Cumulative expenditures Measures Country: Armenia Year: 2011 Quarter 1 Total obligation: $235,650,000 Entity to which the assistance is provided: MCA Armenia Total Quarterly Expenditures1: $17,769,018 Irrigated Agriculture Project (Agriculture and Water) $152,709,208 Increase agricultural productivity Improve and Quality of Irrigation $94,721,567 Training/technical assistance provided for On-Farm Water Management. Training/technical assistance provided for Post-Harvest Processing. Loans Provided. Percent of contracted works disbursed. Value of signed contracts for irrigation works. Number of farmers using better on-farm water management. Number of enterprises using improved techniques. Value of irrigation feasibility and/or detailed design contracts signed. Additional Land irrigated under project. Percent of contracted irrigation feasibility and/or design studies disbursed. Rural Road Rehabilitation Project $67,100,000 Better access to economic and social infrastructure $7,870,944 Average annual daily traffic on Pilot Roads. International roughness index for Pilot Roads. Road Sections Rehabilitated—Pilot Roads. Pilot Roads: Percent of Works Completed. Program Administration,2 Due Diligence, Monitoring and Evaluation $15,840,792 $10,516,317 Pending subsequent reports 3 $79 Projects Obligated Objectives Cumulative expenditures Measures Country: Benin Year: 2011 Quarter 1 Total obligation: $307,298,040 Entity to which the assistance is provided: MCA Benin Total Quarterly Expenditures1: $37,758,677 Access to Financial Services Project $19,650,000 Expand Access to Financial Services $6,227,768 Volume of credits granted by the Micro-Finance Institutions (MFI). Volume of saving collected by the Micro-Finance Institutions. Average portfolio at risk >90 days of microfinance institutions at the national level. Operational self-sufficiency of MFIs at the national level. Number of institutions receiving grants through the Facility. Number of MFIs inspected by CSSFD. Access to Justice Project $34,250,521 Improved Ability of Justice System to Enforce Contracts and Reconcile Claims $6,654,143 Average time to enforce a contract. Percent of firms reporting confidence in the judicial system. Passage of new legal codes. Average time required for Tribunaux de premiere instance—arbitration centers and courts of first instance (TPI) to reach a final decision on a case. Average time required for Court of Appeals to reach a final decision on a case. Percent of cases resolved in TPI per year. Percent of cases resolved in Court of Appeals per year. Number of Courthouses completed. Average time required to register a business (société). Start Printed Page 19137 Average time required to register a business (sole proprietorship). Access to Land Project $35,645,826 Strengthen property rights and increase investment in rural and urban land $18,760,887 Total value of investment in targeted urban land parcels. Total value of investment in targeted rural land parcels. Average cost required to convert occupancy permit to land title through systematic process. Share of respondents perceiving land security in the PH-TF or PFR areas. Number of preparatory studies completed. Number of Legal and Regulatory Reforms Adopted. Amount of Equipment Purchased. Number of new land titles obtained by transformation of occupancy permit. Number of land certificates issued within MCA—Benin implementation. Number of PFRs established with MCA Benin implementation. Number of permanent stations installed. Number of stakeholders Trained. Number of communes with new cadastres. Number of operational land market information systems. Access to Markets Project $171,059,550 Improve Access to Markets through Improvements to the Port of Cotonou $96,786,669 Volume of merchandise traffic through the Port Autonome de Cotonou. Bulk ship carriers waiting times at the port. Port design-build contract awarded. Port crime levels (number of thefts). Average time to clear customs. Port meets—international port security standards (ISPS). Program Administration,2 Due Diligence, Monitoring and Evaluation $46,692,143 $29,028,322 Pending subsequent reports 3 $283,061 Projects Obligated Objectives Cumulative expenditures Measures Country: Ghana Year: 2011 Quarter 1 Total obligation: $547,009,000 Entity to which the assistance is provided: MCA Ghana Total Quarterly Expenditures1: $53,662,034 Agriculture Project $212,597,378 Enhance Profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms $118,885,684 Number of farmers trained in Commercial Agriculture. Number of agribusinesses assisted. Number of preparatory land studies completed. Legal and Regulatory land reforms adopted. Number of landholders reached by public outreach efforts. Number of hectares under production. Number of personnel trained. Number of buildings rehabilitated/constructed. Value of equipment purchased. Feeder Roads International Roughness Index. Feeder Roads Annualized Average Daily Traffic. Value of signed contracts for feasibility and/or design studies of Feeder Roads. Percent of contracted design/feasibility studies completed for Feeder Roads. Value of signed works contracts for Feeder Roads. Percent of contracted Feeder Road works disbursed. Value of loans disbursed to clients from agriculture loan fund. Value of signed contracts for feasibility and/or design studies (irrigation). Percent of contracted (design/feasibility) studies complete (irrigation). Start Printed Page 19138 Value of signed contracts for irrigation works (irrigation). Rural hectares mapped. Percent of contracted irrigation works disbursed. Percent of people aware of their land rights in Pilot Land Registration Areas. Total number of parcels surveyed in the Pilot Land Registration Areas (PLRAs). Volume of products passing through post-harvest treatment. Rural Development Project $73,390,556 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development $46,142,299 Number of students enrolled in schools affected by Education Facilities Sub-Activity. Number of schools rehabilitated. Number of basic school blocks constructed to Ministry of Education (MOE) construction standards. Distance to collect water. Time to collect water. Incidence of guinea worm. Average number of days lost due to guinea worm. Number of people affected by Water and Sanitation Facilities Sub-Activity. Number of stand-alone boreholes/wells/nonconventional water systems constructed/rehabilitated. Number of small-town water systems designed and due diligence completed for construction. Number of pipe extension projects designed and due diligence completed for construction. Number of agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity. Transportation Project $216,235,347 Reduce the transportation costs affecting agriculture commerce at sub-regional levels $93,326,799 Trunk Roads International roughness index. N1 International Roughness Index. N1 Annualized Average Daily Traffic. N1 Kilometers of road upgraded. Value of signed contracts for feasibility and/or design studies of the N1. Percent of contracted design/feasibility studies completed of the N1. Value of signed contracts for road works N1, Lot 1. Value of signed contracts for road works N1, Lot 2. Trunk Roads Annualized Average Daily Traffic. Trunk Roads Kilometers of roads completed. Percent of contracted design/feasibility studies completed of Trunk Roads. Percent of contracted Trunk Road works disbursed. Ferry Activity: annualized average daily traffic vehicles. Ferry Activity: annual average daily traffic (passengers). Landing stages rehabilitated. Ferry terminal upgraded. Rehabilitation of Akosombo Floating Dock completed. Rehabilitation of landing stages completed. Percent of contracted road works disbursed: N1, Lot 2. Percent of contracted road works disbursed: N1, Lot 2. Percent of contracted work disbursed: ferry and floating dock. Percent of contracted work disbursed: landings and terminals. Value of signed contracts for feasibility and/or design studies of Trunk Roads. Value of signed contracts for Trunk Roads. Start Printed Page 19139 Program Administration,2 Due Diligence, Monitoring and Evaluation $44,785,719 $29,624,036 Pending subsequent reports 3 $341,182 Projects Obligated Objectives Cumulative expenditures Measures Country: El Salvador Year: 2011 Quarter 1 Total obligation: $460,940,000 Entity to which the assistance is provided: MCA El Salvador Total Quarterly Expenditures1: $27,896,592 Human Development Project $101,753,001 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities $39,303,357 Employment rate of graduates of middle technical schools. Graduation rates of middle technical schools. Middle technical schools remodeled and equipped. Scholarships granted to students of middle technical schools. Students of non-formal training. Cost of water. Time collecting water. Households benefiting with water solutions built. Potable water and basic sanitation systems with construction contracts signed. Cost of electricity. Households benefiting with a connection to the electricity network. Household benefiting with the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure. Number of hectares under production with MCC support. Number of beneficiaries of technical assistance and training—Agriculture. Number of beneficiaries of technical assistance and training—Agribusiness. Value of Agricultural Loans to Farmers/Agribusiness. Connectivity Project $248,822,000 Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region $99,760,888 Average annual daily traffic. International roughness index. Kilometers of roads rehabilitated. Kilometers of roads with Construction Initiated. Productive Development Project $71,824,000 $36,985,024 Program Administration2 and Control, Monitoring and Evaluation $38,540,999 $17,241,351 Pending Subsequent Report 3 $0 Projects Obligated Objectives Cumulative expenditures Measures Country: Mali Year: 2011 Quarter 1 Total obligation: $460,811,164 Entity to which the assistance is provided: MCA Mali Total Quarterly Expenditures1: $27,024,327 Bamako Senou Airport Improvement Project $181,254,263 $35,384,813 Employment at airport. Signature of design contract. Average number of weekly flights (arrivals). Passenger traffic (annual average). Percent works complete. Time required for passenger processing at departures and arrivals. Percent works complete. Percent of airport management and maintenance plan implemented. Start Printed Page 19140 Airport meets Federal Aviation Administration (FAA) and International Civil Aviation Organization (ICAO) security standards. Technical assistance delivered to project. Alatona Irrigation Project $234,884,675 Increase the agricultural production and productivity in the Alatona zone of the ON $113,956,663 Main season rice yields. International roughness index (IRI) on the Niono-Goma Coura Route. Average daily vehicle count. Percentage works completed on Niono-Goma Coura road. Number of hectares of land irrigated in the Alatona Canal. Irrigation system efficiency on Alatona Canal during the rainy season and the dry season. Completion rate of work on the construction of the main system (B03). Percentage of contracted irrigation construction works disbursed. Number of titles registered in the land registration office of the Alatona zone. Number market gardens allocated in Alatona zones (for PAPs) (market garden parcels allotted to PAP women). Decree transferring legal control of the project impact area is passed. Contractor implementing the “Mapping of Agricultural and Communal Land Parcels” contract is mobilized. Net school enrollment rate (in Alatona zone). Percent of Alatona population with access to drinking water. Number of schools available in Alatona. Number of health centers available in the Alatona. Number of affected people who have been compensate. Resettlement Census verified. Adoption of Rate of Extension Techniques. Area planted with rice during the rainy season. Area planted with shallots during dry season. Number of farmers trained. Water management system design and capacity building strategy implemented. Amount of credit extended to Alatona farmers. Number of farmers accessing grant assistance for first loan from financial institutions. Financial institution partners identified (report on assessment of the financial institutions in the Office du Niger—Office of Niger zone (ON zone). Loan Portfolio quality of Alatona MFIs: portfolio at risk. Industrial Park Project $2,643,432 Terminated $2,637,472 Program Administration 2 and Control, Monitoring and Evaluation $42,028,793 $23,009,671 Pending Subsequent Report 3 $595,909 Projects Obligated Objectives Cumulative expenditures Measures Country: Mongolia Year: 2011 Quarter 1 Total obligation: $284,911,363 Entity to which the assistance is provided: MCA Mongolia Total Quarterly Expenditures1: $8,665,430 Property Rights Project $27,201,061 Increase security and capitalization of land assets held by lower-income Mongolians, and increased peri-urban herder productivity and incomes $4,359,517 Number of studies completed. Legal and regulatory reforms adopted. Number of landholders reached by public outreach efforts. Start Printed Page 19141 Training to Leaseholders—Intensive and Semi-Intensive Farming. Number of Buildings rehabilitated/constructed. Value of equipment purchased. Rural hectares Mapped. Urban Parcels Mapped. Leaseholds Awarded. Hashaa Plots Directly Registered by the Property Rights Project. Vocational Education Project $47,355,638 Increase employment and income among unemployed and underemployed Mongolians $3,874,128 Rate of employment of TVET Graduates. Students completing newly designed long-term programs. Percent of active teachers receiving certification training. Technical and vocational education and training (TVET) legislation passed. Health Project $38,974,817 Increase the adoption of behaviors that reduce non-communicable diseases (NCDIs) among target populations and improved medical treatment and control of NCDIs $8,133,305 Diabetes and hypertension controlled. Percentage of cancer cases diagnosed in early stages. Road and traffic safety activity finalized and key interventions developed. Roads Project $79,750,000 TBD $8,434,083 TBD. Energy and Environmental Project $46,966,205 TBD $1,541,021 TBD. Rail Project $369,560 Terminated $369,560 Terminated. Program Administration 2 and Control, Monitoring and Evaluation $44,294,082 $11,896,484 Pending subsequent reports 3 $357,801 In late 2009, the MCC's Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects from the rail project, and the remaining portion to the addition of a road project. Projects Obligated Objectives Cumulative expenditures Measures Country: Mozambique Year: 2011 Quarter 1 Total obligation: $506,924,053 Entity to which the assistance is provided: MCA Mozambique Total Quarterly Expenditures1: $4,595,841 Water Supply and Sanitation Project $203,585,393 Increase access to reliable and quality water and sanitation facilities $6,922,726 Percent of urban population with improved water sources. Time to get to non-private water source. Percent of urban population with improved sanitation facilities. Percent of rural population with access to improved water sources. Number of private household water connections in urban areas. Number of Rural water points constructed. Number of standpipes in urban areas. Final detailed design for 5 towns submitted. Final detailed design for 3 cities submitted. Road Rehabilitation Project $176,307,480 Increase access to productive resources and markets $3,497,298 Kilometers of road rehabilitated. Percent of Namialo—Rio Lúrio Road—Metoro feasibility, design, and supervision contract disbursed. Percent of Rio Ligonha-Nampula feasibility, design, and supervision contract disbursed. Percent of Chimuara-Nicoadala feasibility, design, and supervision contract disbursed. Percent of Namialo—Rio Lúrio Road construction contract disbursed. Percent of Rio Lúrio—Metoro Road construction contract disbursed. Start Printed Page 19142 Percent of Rio Ligonha—Nampula Road construction contract disbursed. Percent of Chimuara-Nicoadala Road construction contract disbursed. Average annual daily traffic volume. Average annual daily traffic volume. Average annual daily traffic volume. Average annual daily traffic volume. Change in International Roughness Index (IRI)—Namialo—Rio Lurio Road. Change in International Roughness Index (IRI)—on Rio Ligonha-Nampula Road. Change in International Roughness Index (IRI)—on Rio Lurio-Metoro Road. Change in International Roughness Index (IRI)—on Chimuara-Nicoadala Road. Land Tenure Project $39,068,307 Establish efficient, secure land access for households and investors $8,874,069 Total number of officials and residents reached with land strategy and policy awareness and outreach messages. Time to get land usage rights (DUAT), urban. Time to get land usage rights (DUAT), rural. Number of buildings rehabilitated or built. Total value of procured equipment and materials. Number of people trained. Rural hectares mapped in Site Specific Activity. Rural hectares mapped in Community Land Fund Initiative. Urban parcels mapped. Rural hectares formalized through Site Specific Activity. Rural hectares formalized through Community Land Fund Initiative. Urban parcels formalized. Number of communities delimited. Number of households having land formalized, rural. Number of households having land formalized, urban. Farmer Income Support Project $18,400,117 Improve coconut productivity and diversification into cash crop $4,818,852 Number of diseased or dead palm trees cleared. Number of coconut seedlings planted Hectares under production. Number of farmers trained in pest and disease control. Number of farmers trained in crop diversification technologies. Income from coconuts and coconut products (estates). Income from coconuts and coconuts products (households). Program Administration 2 and Control, Monitoring and Evaluation $69,562,756 $14,971,583 Pending Subsequent Report 3 $641,587 Projects Obligated Objectives Cumulative expenditures Measures Country: Lesotho Year: 2011 Quarter 1 Total Obligation: $362,551,000 Entity to which the assistance is provided: MCA Lesotho Total Quarterly Expenditures1: $20,235,490 Water Project $164,027,999 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management $20,665,287 School days lost due to water borne diseases. Diarrhea notification at health centers. Time saved due to access to water source. Rural household (HH) provided with access to improved water supply. Start Printed Page 19143 Rural HH provided with access to improved ventilated latrines. Rural population with knowledge of good hygiene principles. Urban HH with access to potable water supply. Number of enterprises connected to water network. Households connected to improved water network. Cubic meters of treated water from metolong dam delivered through a conveyance system to Water and Sewerage Authority (WASA). Hydrological flows variability. Reclaimed area. Health Project $122,398,000 Increase access to life-extending ART and essential health services by providing a sustainable delivery platform $20,391,636 People with HIV still alive 12 months after initiation of treatment. TB notification (per 100,000 pop.). Percentage of PLWA receiving ARV treatment (by age & sex). Deliveries conducted in the health centers. Immunization coverage rate. Private Sector Development Project $36,470,318 Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy $7,219,420 Average time (days) required to enforce a contract. Value of commercial cases. Cases referred to ADR that are successfully completed. Portfolio of loans. Loan processing time. Performing loans. Electronic payments—salaries. Electronic payments—pensions. Debit/smart cards issued. Mortgage bonds registered. Value of registered mortgage bonds. Clearing time—Country. Clearing time—Maseru. Time to complete transfer of land rights. Land transactions recorded. Land parcels regularized and registered. People trained on gender equality and economic rights. ID cards issued. Monetary cost of a lease transaction. Program Administration 2 and Control, Monitoring and Evaluation $39,654,682 $16,807,335 Pending Subsequent Report 3 $7,597 Projects Obligated Objectives Cumulative expenditures Measures Country: Morocco Year: 2011 Quarter 1 Total obligation: $697,500,000 Entity to which the assistance is provided: MCA Morocco Total Quarterly Expenditures1: $16,235,188 Fruit Tree Productivity Project $300,896,445 Reduce volatility of agricultural production and increase volume of fruit agricultural production $54,073,820 Number of farmers trained. Number of agribusinesses assisted. Number of hectares under production. Value of agricultural production. Small Scale Fisheries Project $116,168,027 Improve quality of fish moving through domestic channels and assure the sustainable use of fishing resources $7,628,045 Landing sites and ports rehabilitated. Mobile fish vendors using new equipments. Fishing boats using new landing sites. Average price of fish at auction markets. Average price of fish at wholesale. Average price of fish at ports. Start Printed Page 19144 Artisan and Fez Medina Project $111,873,858 Increase value added to tourism and artisan sectors $5,083,742 Average revenue of SME pottery workshops. Construction and rehabilitation of Fez Medina Sites. Tourist receipts in Fez. Training of potters. Enterprise Support Project $33,850,000 Improved survival rate of new SMEs and INDH-funded income generating activities; increased revenue for new SMEs and INDH-funded income generating activities $5,957,147 Number of enterprises in pilot project receiving coaching. Value added per enterprise. Survival rate after two years. Financial Services Project $46,200,000 TBD $19,458,039 TBD. Program Administration 2 and Control, Monitoring and Evaluation $88,511,670 $22,819,549 Pending Subsequent Report 3 $50,964 Projects Obligated Objectives Cumulative expenditures Measures Country: Tanzania Year: 2011 Quarter 1 Total obligation: $698,136,001 Entity to which the assistance is provided: MCA Tanzania Total Quarterly Expenditures1: $50,430,174 Energy Sector Project $206,042,428 Increase value added to businesses $38,537,389 New power customers: Kigoma. New power customers: Morogoro. New power customers: Tanga. New power customers: Mbeya. New power customers: Iringa. New power customers: Dodoma. New power customers: Mwanza. New power customers: Zanzibar. Energy generation—Kigoma. Transmission capacity: Kigoma. Transmission capacity: Morogoro. Transmission capacity: Tanga. Transmission capacity: Mbeya. Transmission capacity: Iringa. Transmission capacity: Dodoma. Transmission capacity: Mwanza. Transmission capacity: Zanzibar. Percentage disbursed for design and supervision contract Consulting Engineer (CE) year 1 budgeted: Distribution Rehabilitation and extension activity. Percentage disbursed for design and supervision contract Consulting Engineer (CE) year 1 budgeted; Zanzibar Interconnector activity. Percentage disbursed for design and supervision contract Consulting Engineer (CE) year 1 budgeted; Malagarasi hydropower and Kigoma distribution activity. Transport Sector Project $368,847,429 Increase cash crop revenue and aggregate visitor spending $70,094,338 International roughness index: Tunduma Sumbawanga. International roughness index: Tanga Horohoro. International roughness index: Namtumbo Songea. International roughness index: Peramiho Mbinga. Annual average daily traffic: Tunduma Sumbawanga. Annual average daily traffic: Tanga Horohoro. Annual average daily traffic: Namtumbo Songea. Annual average daily traffic: Peramiho Mbinga. Kilometers upgraded/completed: Tunduma Sumbawanga. Start Printed Page 19145 Kilometers upgraded/completed: Tanga Horohoro. Kilometers upgraded/completed: Namtumbo Songea. Kilometers upgraded/completed: Peramiho Mbinga. Percent disbursed on construction works: Tunduma Sumbawanga. Percent disbursed on construction works: Tanga Horohoro. Percent disbursed on construction works: Namtumbo Songea. Percent disbursed on construction works: Peramiho Mbinga. Percent disbursed for feasibility and/or design studies: Tunduma Sumbawanga. Percent disbursed for feasibility and/or design studies: Tanga Horohoro. Percent disbursed for feasibility and/or design studies: Namtumbo Songea. Percent disbursed for feasibility and/or design studies: Peramiho Mbinga. International roughness index: Pemba. Average annual daily traffic: Pemba. Kilometers upgraded/completed: Pemba. Percent disbursed on construction works: Pemba. Signed contracts for construction works (Zanzibar Rural Roads). Percent disbursed on signed contracts for feasibility and/or design studies: Pemba. Passenger arrivals: Mafia Island. Percentage of upgrade complete: Mafia Island. Percent disbursed on construction works: Mafia Island. Water Sector Project $65,692,144 Increase investment in human and physical capital and to reduce the prevalence of water-related disease $3,284,750 Number of households using improved source for drinking water (Dar es Salaam). Number of households using improved source for drinking water (Morogoro). Number of businesses using improved water source (Dar es Salaam). Number of businesses using improved water source (Morogoro). Volume of water produced (Lower Ruvu). Volume of water produced (Morogoro). Percent disbursed on Feasibility Design Update contract Lower Ruvu Plant Expansion. Program Administration 2 and Control, Monitoring and Evaluation $57,554,000 $15,382,170 Pending Subsequent Report 3 $206,197 Projects Obligated Objectives Cumulative expenditures Measures Country: Burkina Faso Year: 2011 Quarter 1 Total obligation: $480,943,569 Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Expenditures1: $4,817,464 Roads Project $194,130,681 Enhance access to markets through investments in the road network $3,055,661 To Be Determined (TBD). Rural Land Governance Project $59,934,615 Increase investment in land and rural productivity through improved land tenure security and land management $6,348,245 TBD. Start Printed Page 19146 Agriculture Development Project $141,910,059 Expand the productive use of land in order to increase the volume and value of agricultural production in project zones $6,518,953 TBD. Bright II Schools Project $28,829,669 Increase primary school completion rates $14,756,395 TBD. Program Administration 2 and Control, Monitoring and Evaluation $56,138,545 $16,054,831 Pending Subsequent Report 3 $12,034,926 Projects Obligated Objectives Cumulative expenditures Measures Country: Namibia Year: 2011 Quarter 1 Total obligation: $304,477,816 Entity to which the assistance is provided: MCA Namibia Total Quarterly Expenditures1: $7,083,896 Education Project $144,976,557 Improve the education sector's effectiveness, efficiency and quality $8,875,295 TBD. Tourism Project $66,959,292 Increase incomes and create employment opportunities by improving the marketing, management and infrastructure of Etosha National Park $4,718,437 TBD. Agriculture Project $47,550,008 Sustainably improve the economic performance and profitability of the livestock sector and increase the volume of the indigenous natural products for export $4,834,237 TBD. Program Administration 2 and Control, Monitoring and Evaluation $44,991,959 $8,477,524 Pending Subsequent Report 3 $3,189,460 Projects Obligated Objectives Cumulative expenditures Measures Country: Moldova Year: 2011 Quarter 1 Total obligation: $262,000,000 Entity to which the assistance is provided: MCA Moldova Total Quarterly Expenditures1: −$55,865 Road Rehabilitation Project $132,840,000 $94,350 To Be Determined (TBD). Transition to High Value Agriculture Project $101,773,402 $0 TBD. Program Administration 2 and Monitoring and Evaluation $27,386,598 $0 TBD. The negative quarterly expenditure for Moldova is related to expense accruals. The accruals will be reversed in 2011 and applied to various projects and activities. Projects Obligated Objectives Cumulative expenditures Measures Country: Senegal Year: 2011 Quarter 1 Total obligation: $540,000,000 Entity to which the assistance is provided: MCA Moldova Total Quarterly Expenditures1: $446,752 Road Rehabilitation Project $324,712,499 $0 To Be Determined (TBD). Transition to High Value Agriculture Project $170,008,860 $0 TBD. Program Administration 2 and Monitoring and Evaluation $45,278,641 $1,353,733 TBD. Start Printed Page 19147 Pending Subsequent Report 3 $46,835 1 Expenditures are the sum of cash outlays and quarterly accruals for work completed but not yet paid or invoiced. 2 Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. 3 These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). End Preamble619(b) Transfer or Allocation of Funds U.S. Agency to which funds were transferred or allocated Amount Description of program or project USAID $0 Threshold Program. [FR Doc. 2011-8104 Filed 4-5-11; 8:45 am]
BILLING CODE 9211-03-P
Document Information
- Published:
- 04/06/2011
- Department:
- Millennium Challenge Corporation
- Entry Type:
- Notice
- Document Number:
- 2011-8104
- Pages:
- 19131-19147 (17 pages)
- Docket Numbers:
- MCC FR 11-03
- PDF File:
- 2011-8104.pdf