2015-07846. Safety Zone; Rock and Roll Hall of Fame and Museum Fireworks Display; Lake Erie, Cleveland, OH
-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Temporary final rule.
SUMMARY:
The Coast Guard is establishing a temporary safety zone on Lake Erie, Cleveland Harbor, Cleveland, OH. This safety zone is intended to restrict vessels from a portion of Lake Erie during the Rock and Roll Hall of Fame and Museum fireworks display. This temporary safety zone is necessary to protect mariners and vessels from the Start Printed Page 18314navigational hazards associated with a fireworks display.
DATES:
This rule will be effective from 7:45 p.m. until 9:15 p.m. on April 11, 2015.
ADDRESSES:
Documents mentioned in this preamble are part of docket [USCG-2015-0186]. To view documents mentioned in this preamble as being available in the docket, go to http://www.regulations.gov,, type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this rulemaking. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email LTJG Amanda Garcia, Chief of Waterways Management, U.S. Coast Guard Sector Buffalo; telephone 716-843-9343, email SectorBuffaloMarineSafety@uscg.mil. If you have questions on viewing the docket, call Ms. Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826 or 1-800-647-5527.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Table of Acronyms
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of Proposed Rulemaking
TFR Temporary Final Rule
A. Regulatory History and Information
The Coast Guard is issuing this temporary final rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are “impracticable, unnecessary, or contrary to the public interest.” Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because doing so would be impracticable and contrary to the public interest. The final details for this event were not known to the Coast Guard until there was insufficient time remaining before the event to publish an NPRM. Thus, delaying the effective date of this rule to wait for a comment period to run would be both impracticable and contrary to the public interest because it would inhibit the Coast Guard's ability to protect spectators and vessels from the hazards associated with a maritime fireworks display.
Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this temporary rule effective less than 30 days after publication in the Federal Register. For the same reasons discussed in the preceding paragraph, waiting for a 30 day notice period to run would be impracticable and contrary to the public interest.
B. Basis and Purpose
The legal basis and authorities for this rule are found in 33 U.S.C. 1231, 46 U.S.C. Chapter 701, 3306, 3703; 50 U.S.C. 191, 195; 33 CFR 1.05-1, 6.04-1, 6.04-6, and 160.5; Pub. L. 107-295, 116 Stat. 2064; and Department of Homeland Security Delegation No. 0170.1, which collectively authorize the Coast Guard to establish and define regulatory safety zones.
Between 7:45 p.m. and 9:15 p.m. on April 11, 2015, a fireworks display will be held on the shoreline of Lake Erie, Cleveland Harbor in Cleveland, OH, in the vicinity of the Rock and Roll Hall of Fame. It is anticipated that numerous vessels will be in the immediate vicinity of the launch point. The Captain of the Port Buffalo has determined that such a launch proximate to a gathering of watercraft pose a significant risk to public safety and property. Such hazards include premature and accidental detonations, dangerous projectiles, and falling or burning debris.
C. Discussion of the Final Rule
With the aforementioned hazards in mind, the Captain of the Port Buffalo has determined that this temporary safety zone is necessary to ensure the safety of spectators and vessels during the Rock and Roll Hall of Fame and Museum fireworks display. This zone will be effective and enforced from 7:45 p.m. until 9:15 p.m. on April 11, 2015. This zone will encompass all waters of Lake Erie; Cleveland Harbor, Cleveland, OH within a 210-foot radius of position 41°30′37.40″ N. and 081°41′50.07″ W. (NAD 83).
Entry into, transiting, or anchoring within the safety zone is prohibited unless authorized by the Captain of the Port Buffalo or his designated on-scene representative. The Captain of the Port or his designated on-scene representative may be contacted via VHF Channel 16.
D. Regulatory Analyses
We developed this rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on these statutes and executive orders.
1. Regulatory Planning and Review
This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, Improving Regulation and Regulatory Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of Executive Order 12866 or under section 1 of Executive Order 13563. The Office of Management and Budget has not reviewed it under those Orders.
We conclude that this rule is not a significant regulatory action because we anticipate that it will have minimal impact on the economy, will not interfere with other agencies, will not adversely alter the budget of any grant or loan recipients, and will not raise any novel legal or policy issues. The safety zone created by this rule will be relatively small and enforced for a relatively short time. Also, the safety zone is designed to minimize its impact on navigable waters. Furthermore, the safety zone has been designed to allow vessels to transit around it. Thus, restrictions on vessel movement within that particular area are expected to be minimal. Under certain conditions, moreover, vessels may still transit through the safety zone when permitted by the Captain of the Port.
2. Impact on Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered the impact of this rule on small entities. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities. This rule will affect the following entities, some of which might be small entities: The owners or operators of vessels intending to transit or anchor in a portion of Cleveland Harbor on the evening of April 11, 2015.
This safety zone will not have a significant economic impact on a substantial number of small entities for the following reasons: this safety zone would be effective, and thus subject to enforcement, for only 90 minutes late in the day. Traffic may be allowed to pass through the zone with the permission of the Captain of the Port. The Captain of the Port can be reached via VHF Start Printed Page 18315channel 16. Before the enforcement of the zone, we would issue local Broadcast Notice to Mariners.
3. Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section above.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.
4. Collection of Information
This rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
5. Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and determined that this rule does not have implications for federalism.
6. Protest Activities
The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places, or vessels.
7. Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
8. Taking of Private Property
This rule will not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
9. Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
10. Protection of Children
We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children.
11. Indian Tribal Governments
This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
12. Energy Effects
This action is not a “significant energy action” under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use.
13. Technical Standards
This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.
14. Environment
We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have determined that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule involves the establishment of a safety zone and, therefore it is categorically excluded from further review under paragraph 34(g) of Figure 2-1 of the Commandant Instruction. An environmental analysis checklist supporting this determination and a Categorical Exclusion Determination are available in the docket where indicated under ADDRESSES. We seek any comments or information that may lead to the discovery of a significant environmental impact from this rule.
Start List of SubjectsList of Subjects in 33 CFR Part 165
- Harbors
- Marine safety
- Navigation (water)
- Reporting and recordkeeping requirements
- Security measures
- Waterways
For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows:
Start PartPART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS
End Part Start Amendment Part1. The authority citation for part 165 continues to read as follows:
End Amendment Part Start Amendment Part2. Section 165.T09-0186 is added to read as follows:
End Amendment PartSafety Zone; Rock and Roll Hall of Fame and Museum Fireworks Display; Lake Erie, Cleveland, OH.(a) Location. This zone will encompass all waters of Lake Erie, Cleveland Harbor; Cleveland, OH within a 210-foot radius of position 41°30′37.40″ N. and 081°41′50.07″ W. (NAD 83).
(b) Enforcement Period. This regulation will be enforced on April 11, 2015 from 7:45 p.m. until 9:15 p.m.
(c) Regulations. (1) In accordance with the general regulations in § 165.23 of this part, entry into, transiting, or anchoring within this safety zone is prohibited unless authorized by the Captain of the Port Buffalo or his designated on-scene representative.
(2) This safety zone is closed to all vessel traffic, except as may be permitted by the Captain of the Port Buffalo or his designated on-scene representative.Start Printed Page 18316
(3) The “on-scene representative” of the Captain of the Port Buffalo is any Coast Guard commissioned, warrant or petty officer who has been designated by the Captain of the Port Buffalo to act on his behalf.
(4) Vessel operators desiring to enter or operate within the safety zone must contact the Captain of the Port Buffalo or his on-scene representative to obtain permission to do so. The Captain of the Port Buffalo or his on-scene representative may be contacted via VHF Channel 16. Vessel operators given permission to enter or operate in the safety zone must comply with all directions given to them by the Captain of the Port Buffalo, or his on-scene representative.
Dated: March 23, 2015.
B.W. Roche,
Captain, U.S. Coast Guard, Captain of the Port Buffalo.
[FR Doc. 2015-07846 Filed 4-3-15; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 4/11/2015
- Published:
- 04/06/2015
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Temporary final rule.
- Document Number:
- 2015-07846
- Dates:
- This rule will be effective from 7:45 p.m. until 9:15 p.m. on April 11, 2015.
- Pages:
- 18313-18316 (4 pages)
- Docket Numbers:
- Docket Number USCG-2015-0186
- RINs:
- 1625-AA00: Safety Zone Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA00/safety-zone-regulations
- Topics:
- Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways
- PDF File:
- 2015-07846.pdf
- CFR: (1)
- 33 CFR 165.T09-0186