2016-07874. Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act  

  • Start Preamble

    AGENCY:

    Office of Electricity Delivery and Energy Reliability, DOE.

    ACTION:

    Notice of Filing.

    SUMMARY:

    On March 15, 2016, Middlesex Energy Center, LLC, as owner and operator of a new combined cycle electric powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to § 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c).

    ADDRESSES:

    Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Christopher Lawrence at (202) 586-5260.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to FUA in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source Start Printed Page 19963shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. 42 U.S.C. 8311.

    The following owner of a proposed new combined cycle electric powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61:

    OWNER: Middlesex Energy Center, LLC,

    CAPACITY: 560 megawatts (MW).

    PLANT LOCATION: Borough of Sayreville, Middlesex County, New Jersey.

    IN-SERVICE DATE: May 2019.

    Start Signature

    Issued in Washington, DC, on March 30, 2016.

    Christopher Lawrence,

    Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability.

    End Signature End Supplemental Information

    [FR Doc. 2016-07874 Filed 4-5-16; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Published:
04/06/2016
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of Filing.
Document Number:
2016-07874
Dates:
May 2019.
Pages:
19962-19963 (2 pages)
Docket Numbers:
Certification Notice-238
PDF File:
2016-07874.pdf