95-8638. Kentucky Regulatory Program  

  • [Federal Register Volume 60, Number 67 (Friday, April 7, 1995)]
    [Proposed Rules]
    [Pages 17739-17741]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-8638]
    
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF THE INTERIOR
    30 CFR Part 917
    
    
    Kentucky Regulatory Program
    
    AGENCY: Office of Surface Mining Reclamation and Enforcement (OSM), 
    Interior.
    
    ACTION: Announcement of public comment period and opportunity for 
    public hearing.
    
    -----------------------------------------------------------------------
    
    SUMMARY: OSM is requesting public comment that would be considered in 
    deciding how to implement in Kentucky underground coal mine subsidence 
    control and water replacement provisions of the Surface Mining Control 
    and Reclamation Act of 1977 (SMCRA), the implementing Federal 
    regulations, and/or the counterpart State provisions. Recent amendments 
    to SMCRA and the implementing Federal regulations require that 
    underground coal mining operations conducted after October 24, 1992, 
    promptly repair or compensate for subsidence-caused material damage to 
    noncommercial buildings and to occupied dwellings and related 
    structures. These provisions also require such operations to promptly 
    replace drinking, domestic, and residential water supplies that have 
    been adversely affected by underground coal mining.
        OSM must decide if the Kentucky regulatory program (hereinafter 
    referred to as the ``Kentucky program'') currently has adequate 
    counterpart provisions in place to promptly implement the recent 
    amendments to SMCRA and the Federal regulations. After consultation 
    with Kentucky and consideration of public comments, OSM will decide 
    whether initial enforcement in Kentucky will be accomplished through 
    the State program amendment process or by State enforcement, by interim 
    direct OSM enforcement, or by joint State and OSM enforcement.
    
    DATES: Written comments must be received by 4 p.m., e.s.t. on May 8, 
    1955. If requested, OSM will hold a public hearing on May 2, 1995 
    concerning how the underground coal mine subsidence control and water 
    replacement provisions of SMCRA and the implementing Federal 
    regulations, or the counterpart State provisions, should be implemented 
    in Kentucky. Requests to speak at the hearing must be received by 4 
    p.m., e.s.t. on April 24, 1995.
    
    ADDRESSES: Written comments and requests to speak at the hearing should 
    be mailed or hand-delivered to William J. Kovacic, Director, Lexington 
    Field Office at the address listed below.
        Copies of the applicable parts of the Kentucky program, SMCRA, the 
    implementing Federal regulations, information provided by Kentucky 
    concerning its authority to implement State counterparts to SMCRA and 
    the implementing Federal regulations, a listing of any scheduled public 
    hearings, and all written comments received in response to this 
    document will be available for public review at the address listed 
    below during normal business hours, Monday through Friday, excluding 
    holidays: William J. Kovacic, Field Office Director, Lexington Field 
    Office, Office of Surface Mining Reclamation and Enforcement, 2675 
    Regency Road, Telephone: (606) 233-2894.
    
    FOR FURTHER INFORMATION CONTACT: William J. Kovacic, Director, 
    Lexington, Field Office, Telephone: (606) 233-2894.
    
    SUPPLEMENTARY INFORMATION:
    
    I. Background
    A. The Energy Policy Act
    
        Section 2504 of the Energy Policy Act of 1992, Public Law 102-486, 
    106 Stat. 2776 (1992) added new section 720 to SMCRA. Section 720(a)(1) 
    requires that all underground coal mining operations promptly repair or 
    compensate for subsidence-caused material damage to noncommercial 
    buildings and to occupied residential dwellings and related structures. 
    Repair of damage include rehabilitation, restoration, or replacement of 
    the structures identified in section 720(a)(1), and compensation must 
    be provided to the owner in the full amount of the reduction in value 
    of the damaged structures as a result of subsidence. Section 720(a)(2) 
    requires prompt replacement of certain identified water supplies if 
    those [[Page 17740]] supplies have been adversely affected by 
    underground coal mining operations.
        These provisions requiring prompt repair or compensation for damage 
    to structures, and prompt replacement of water supplies, went into 
    effect upon passage of the Energy Policy Act on October 24, 1992. As a 
    result, underground coal mine permittees in States with OSM-approved 
    regulatory programs are required to comply with these provisions for 
    operations conducted after October 24, 1992.
    
    B. The Federal Regulations Implementing the Energy Policy Act
    
        On March 31, 1995, OSM promulgated regulations at 30 CFR part 817 
    to implement the performance standards of sections 720(a) (1) and (2) 
    of SMCRA (60 FR 16722-16751).
        30 CFR 817.121(c)(2) requires in part that:
    
        Permittee must promptly repair, or compensate the owner for, 
    material damage resulting from subsidence caused to any non-
    commercial building or occupied residential dwelling or structure 
    related thereto that existed at the time of mining. * * * The 
    requirements of this paragraph apply only to subsidence-related 
    damage caused by underground mining activities conducted after 
    October 24, 1992.
    
        30 CFR 817.41(j) requires in part that:
    
        The permittee must promptly replace any drinking, domestic or 
    residential water supply that is contaminated, diminished or 
    interrupted by underground mining activities conducted after October 
    24, 1992, if the affected well or spring was in existence before the 
    date the regulatory authority received the permit application for 
    the activities causing the loss, contamination or interruption.
    
        30 CFR 843.25 provides that by July 31, 1995, OSM will decide, in 
    consultation with each State regulatory authority with an approved 
    program, how enforcement of the new requirements will be accomplished. 
    As discussed below, enforcement may be accomplished through the 30 CFR 
    part 732 State program amendment process, or by State, OSM, or joint 
    State and OSM enforcement of the requirements. OSM will decide which of 
    the following enforcement approaches to pursue.
        (1) State program amendment process. If the State's promulgation of 
    regulatory provisions that are counterpart to 30 CFR 817.41(j) and 
    817.121(c)(2) is imminent, the number and extent of underground mines 
    that have operated in the State since October 24, 1992, is low, the 
    number of complaints in the State concerning section 720 of SMCRA is 
    low, or the State's investigation or subsidence-related complaints has 
    been thorough and complete so as to assure prompt remedial action, then 
    OSM could decide not to directly enforce the Federal provisions in the 
    State. In this situation, the State would enforce its State statutory 
    and regulatory provisions once it has amended its program to be in 
    accordance with the revised SMCRA and to be consistent with the revised 
    Federal regulations. This program revision process, which is addressed 
    in the Federal regulations at 30 CFR part 732, is commonly referred to 
    as the State program amendment process.
        (2) State enforcement. If the State has statutory or regulatory 
    provisions in place that correspond to all of the requirements of the 
    above-described Federal regulations at 30 CFR 817.41(j) and 
    817.121(c)(2) and the State has authority to implement its statutory 
    and regulatory provisions for all underground mining activities 
    conducted after October 24, 1992, then the State would enforce its 
    provisions for these operations.
        (3) Interim direct OSM enforcement. If the State does not have any 
    statutory or regulatory provisions in place that correspond to the 
    requirements of the Federal regulations at 30 CFR 817.41(j) and 
    817.121(c)(2), then OSM would enforce in their entirety 30 CFR 
    817.41(j) and 817.121(c)(2) for all underground mining activities 
    conducted in the State after October 24, 1992.
        (4) State and OSM enforcement. If the State has statutory or 
    regulatory provisions in place that correspond to some but not all of 
    the requirements of the Federal regulations at 30 CFR 817.41(j) and 
    817.121(c)(2) and the State has authority to implement its provisions 
    for all underground mining activities conducted after October 24, 1992, 
    then the State would enforce its provisions for these operations. OSM 
    would then enforce those provisions of 30 CFR 817.41(j) and 
    817.121(c)(2) that are not covered by the State provisions for these 
    operations.
        If the State has statutory or regulatory provisions in place that 
    correspond to some but not all of the requirements of the Federal 
    regulations at 30 CFR 817.41(j) and 817.121(c)(2) and if the State's 
    authority to enforce its provisions applies to operations conducted on 
    or after some date later than October 24, 1992, the State would enforce 
    its provisions for these operations on and after the provisions' 
    effective date. OSM would then enforce 30 CFR 817.41(j) and 
    817.121(c)(2) to the extent the State statutory and regulatory 
    provisions do not include corresponding provisions applicable to all 
    underground mining activities conducted after October 24, 1992; and OSM 
    would enforce those provisions of 30 CFR 817.41(j) and 817.121(c)(2) 
    that are included in the State program but are not enforceable back to 
    October 24, 1992, for the time period from October 24, 1992, until the 
    effective date of the State's rules.
        As described in item numbers (3) and (4) above, OSM would directly 
    enforce in total or in part its Federal statutory or regulatory 
    provisions until the State adopts and OSM approves, under 30 CFR part 
    732, the State's counterparts to the required provisions. However, as 
    discussed in item number (1) above, OSM could decide not to initiate 
    direct Federal enforcement and rely instead on the 30 CFR part 732 
    State program amendment process.
        In those situations where OSM determined that direct Federal 
    enforcement was necessary, the ten-day notice provisions of 30 CFR 
    843.12(a)(2) would not apply. That is, when on the basis of a Federal 
    inspection OSM determined that a violation of 30 CFR 817.41(j) or 
    817.121(c)(2) existed, OSM would issue a notice of violation or 
    cessation order without first sending a ten-day notice to the State.
        Also under direct Federal enforcement, the provisions of 30 CFR 
    817.121(c)(4) would apply. This regulation states that if damage to any 
    noncommercial building or occupied residential dwelling or structure 
    related thereto occurs as a result of earth movement within an area 
    determined by projecting a specified angle of draw from the outermost 
    boundary of any underground mine workings to the surface of the land 
    (normally a 30 degree angle of draw), a rebuttable presumption exists 
    that the permittee caused the damage.
        Lastly, under direct Federal enforcement, OSM would also enforce 
    the new definitions at 30 CFR 701.5 of ``drinking, domestic or 
    residential water supply,'' ``material damage,'' ``non-commercial 
    building,'' ``occupied dwelling and structure related thereto,'' and 
    ``replacement of water supply'' that were adopted with the new 
    underground mining performance standards.
        OSM would enforce 30 CFR 817.41(j), 817.121(c) (2) and (4), and 30 
    CFR 701.5 for operations conducted after October 24, 1992.
    
    C. Enforcement in Kentucky
    
        By letter to Kentucky dated December 14, 1994, OSM requested 
    information from Kentucky that would help OSM decide which approach to 
    take in Kentucky to implement the new requirements of section 720(a) of 
    [[Page 17741]] SMCRA and the implementing Federal regulations 
    (Administrative Record No. KY-1336. By letter dated January 31, 1995, 
    Kentucky responded to this OSM request (Administrative Record No. KY-
    1337).
        Kentucky stated that 410 underground coal mines were active in 
    Kentucky after October 24, 1992. Kentucky indicated that existing State 
    program provisions at 405 Kentucky Administrative Regulations (KAR) 
    18:210 section 3 are adequate State counterparts to section 720(a)(1) 
    of SMCRA and the implementing Federal regulations. Section 720(a)(1) of 
    SMCRA requires prompt repair or compensation to the owner for 
    subsidence-related material damage to non-commercial buildings or 
    occupied dwellings and related structures. Kentucky explained that it 
    will enforce this State program provision in accordance with 405 KAR 
    18:210 section 3.
        Kentucky stated that the Kentucky program does not fully authorize 
    enforcement of the new water replacement requirements of section 
    720(a)(2) of SMCRA and the implementing Federal regulations. Kentucky 
    submitted a program amendment to OSM dated April 29, 1994, 
    (Administrative Record No. KY-1279) which will modify language at 
    Kentucky Revised Statutes (KRS) 350.421. KRS 350.421, as modified, will 
    require replacement of water loss caused by underground mining 
    operations. OSM is currently reviewing the Kentucky program amendment. 
    Kentucky has stated that the effective date of the program amendment, 
    when approved, will be July 16, 1994. Kentucky also stated that it does 
    not have authority to issue enforcement actions for water loss caused 
    by underground mining operations conducted after October 24, 1992, and 
    before July 16, 1994.
        Kentucky has investigated 115 citizen complaints alleging water 
    supply loss or contaminations as a result of underground mining 
    operations conducted after October 14, 1992, and before July 16, 1994. 
    Of the 115 citizens complaints, 30 are pending resolution of currently 
    outstanding ten-day notices; 29 have been satisfactorily resolved; and 
    47 will require further investigation.
    
    II. Public Comment Procedures
    
        OSM is requesting public comment to assist OSM in making its 
    decision on which approach to use in Kentucky to implement the 
    underground coal mine performance standards of section 720(a) of SMCRA, 
    the implementing Federal regulations, and any counterpart State 
    provisions.
    
    A. Written Comments
    
        Written comments should be specific, pertain only to the issues 
    addressed in this notice, and include explanations in support of the 
    commentor's recommendations. Comments received after the time indicated 
    under DATES or at locations other than the Lexington Field Office will 
    not necessarily be considered in OSM's final decision or included in 
    the Administrative Record.
    
    B. Public Hearing
    
        Persons wishing to speak at the public hearing should contact the 
    person listed under FOR FURTHER INFORMATION CONTACT by 4:00 p.m., 
    e.s.t. on April 24, 1995. The location and time of the hearing will be 
    arranged with those persons requesting the hearing. If no one requests 
    an opportunity to testify at the public hearing, the hearing will not 
    be held.
        Filing of a written statement at the time of the hearing is 
    requested as it will greatly assist the transcriber. Submission of 
    written statements in advance of the hearing will allow OSM officials 
    to prepare adequate responses and appropriate questions.
        The public hearing will continue on the specified date until all 
    persons scheduled to speak have been heard. Persons in the audience who 
    have not been scheduled to speak, and who wish to do so, will be heard 
    following those who have been scheduled. The hearing will end after all 
    persons scheduled to speak and persons present in the audience who wish 
    to speak have been heard.
        Any disabled individual who has need for a special accommodation to 
    attend a public hearing should contact the individual listed under FOR 
    FURTHER INFORMATION CONTACT.
    
    C. Public Meeting
    
        If only a few persons request an opportunity to speak at a hearing, 
    a public meeting, rather than a public hearing, may be held. Persons 
    wishing to meet with OSM representatives to discuss recommendations on 
    how OSM and Kentucky should implement the provisions of section 720(a) 
    of SMCRA, the implementing Federal regulations, and/or the counterpart 
    State provisions, may request a meeting by contacting the person listed 
    under FOR FURTHER INFORMATION CONTACT. All such meetings will be open 
    to the public and, if possible, notices of meetings will be posted at 
    the locations listed under ADDRESSES. A written summary of each meeting 
    will be made a part of the Administrative Record.
    
        Dated: March 31, 1995.
    Richard J. Seibel,
    Acting Assistant Director, Eastern Support Center.
    [FR Doc. 95-8638 Filed 4-6-95; 8:45 am]
    BILLING CODE 4310-05-M
    
    

Document Information

Published:
04/07/1995
Department:
Interior Department
Entry Type:
Proposed Rule
Action:
Announcement of public comment period and opportunity for public hearing.
Document Number:
95-8638
Dates:
Written comments must be received by 4 p.m., e.s.t. on May 8, 1955. If requested, OSM will hold a public hearing on May 2, 1995 concerning how the underground coal mine subsidence control and water replacement provisions of SMCRA and the implementing Federal regulations, or the counterpart State provisions, should be implemented in Kentucky. Requests to speak at the hearing must be received by 4 p.m., e.s.t. on April 24, 1995.
Pages:
17739-17741 (3 pages)
PDF File:
95-8638.pdf
CFR: (1)
30 CFR 917