97-8780. Central Utah Project Completion Act; Notice of Availability of the Record of Decision on the Wasatch County Water Efficiency Project and Daniel Replacement Project Final Environmental Impact Statement Documenting the Department of the ...  

  • [Federal Register Volume 62, Number 66 (Monday, April 7, 1997)]
    [Notices]
    [Pages 16602-16603]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-8780]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    
    Central Utah Project Completion Act; Notice of Availability of 
    the Record of Decision on the Wasatch County Water Efficiency Project 
    and Daniel Replacement Project Final Environmental Impact Statement 
    Documenting the Department of the Interior's Approval for the Central 
    Utah Water Conservancy District To Proceed With the Construction of the 
    Proposed Action Alternative
    
    AGENCY: Office of the Assistant Secretary--Water and Science, 
    Department of the Interior.
    
    ACTION: Notice of availability of the Wasatch County Water Efficiency 
    Project and Daniel Replacement Project Record of Decision.
    
    -----------------------------------------------------------------------
    
    SUMMARY: On March 21, 1997, Patricia J. Beneke, Assistant Secretary--
    Water and Science, Department of the Interior, signed the Record of 
    Decision (ROD) which documents the selection of the Proposed Action 
    Alternative as presented in the Wasatch County Water Efficiency Project 
    and Daniel Replacement Project (WCWEP and DRP) Final Environmental 
    Impact Statement (FEIS), INT FES 96-58, filed November 22, 1996, and as 
    described in the WCWEP Feasibility Study dated January 1997. The ROD 
    also approves the Central Utah Water Conservancy District (CUWCD) 
    proceeding with construction of WCWEP and DRP, in accordance with 
    statutory and contractual obligations. Construction of WCWEP will 
    provide a replacement water supply out of water conserved in Wasatch 
    County, for the water presently being diverted from the Strawberry 
    River basin. The replacement supply will be delivered by means of the 
    DRP.
        The FEIS for WCWEP and DRP, considered three alternatives to 
    restore flows in the upper Strawberry River and to provide water and 
    water conveyance facilities from Jordanelle Reservoir to the existing 
    Daniel Irrigation Company (DIC) water storage facilities as mandated in 
    section 303 of the Central Utah Project Completion Act (CUPCA) and a No 
    Action Alternative. The Department of the Interior (Interior), the Utah 
    Reclamation Mitigation and Conservation Commission (Mitigation 
    Commission), and the CUWCD served as the Joint Lead Agencies in the 
    preparation of the NEPA compliance documents.
        In addition to satisfying the requirements and authorizations of 
    CUPCA, the construction of the WCWEP and DRP will satisfy Interior's 
    environmental commitment made in the
    
    [[Page 16603]]
    
    U.S. Bureau of Reclamation's 1990 Final Supplement to the Final 
    Environmental Impact Statement, Diamond Fork System, and now binding 
    upon the Mitigation Commission, to restore flows in the upper 
    Strawberry River that have been historically diverted by the DIC, and 
    to provide the mandated replacement water supply. Of principal 
    significance, the selected alternative will fulfill the mandates of 
    CUPCA and the environmental commitment by: improving the efficiency of 
    delivering CUP agricultural and municipal and industrial water stored 
    in Jordanelle Reservoir; conserving water and improving water 
    management in the Heber Valley; supplementing instream flows in some 
    Heber Valley streams; protecting the water rights of downstream users; 
    and minimizing adverse impacts on groundwater, wetlands and other 
    environmental resources.
        During preparation of the FEIS, CUWCD consulted formally on listed 
    species with the U.S. Fish and Wildlife Service (FWS) under Sec. 7 of 
    the Endangered Species Act (16 U.S.C.A. sections 1531 to 1544, as 
    amended). In a letter dated January 14, 1997, the FWS indicated that 
    the Proposed Action Alternative selected by this ROD is not likely to 
    adversely affect listed or proposed species or designated or proposed 
    critical habitats. CUWCD and Interior will continue to consult with FWS 
    prior to and during construction to avoid action that may affect 
    proposed or listed species, or their proposed or designated critical 
    habitat.
    
    FOR FURTHER INFORMATION: Additional information on matters related to 
    this Federal Register notice can be obtained at the address and 
    telephone number set forth below: Mr. Reed Murray, Program Coordinator, 
    CUP Completion Act Office, Department of the Interior, 302 East 1860 
    South Provo, UT 84606-6154, Telephone: (801) 379-1237.
    
        Dated: April 1, 1997.
    Ronald Johnston,
    Program Director, Department of the Interior.
    [FR Doc. 97-8780 Filed 4-4-97; 8:45 am]
    BILLING CODE 4310-RK-P
    
    
    

Document Information

Published:
04/07/1997
Department:
Interior Department
Entry Type:
Notice
Action:
Notice of availability of the Wasatch County Water Efficiency Project and Daniel Replacement Project Record of Decision.
Document Number:
97-8780
Pages:
16602-16603 (2 pages)
PDF File:
97-8780.pdf