DEPARTMENT OF ENERGY
[Docket No. EL96-46-000, et al.]
Metropolitan Water District of Southern California, et al.;
Electric Rate and Corporate Regulation Filings
April 25, 1996.
Take notice that the following filings have been made with the
Commission:
1. Metropolitan Water District of Southern California
[Docket No. EL96-46-000]
Take notice that on April 11, 1996, Metropolitan Water District of
Southern California tendered for filing a letter requesting waiver from
the Federal Energy Regulatory Commission to file Form 715.
Comment date: May 7, 1996, in accordance with Standard Paragraph E
at the end of this notice.
2. Kaztex Energy Ventures, Inc., Peak Energy, Inc., Southeastern Energy
Resources, Inc., Audit Pro Incorporated, Superior Electric Power
Corporation, Duke Energy Marketing Corp.
[Docket Nos. ER95-295-006, ER95-379-004, ER95-385-005, ER95-878-004,
ER95-1747-002, ER96-109-004 (not consolidated)]
Take notice that the following informational filings have been made
with the Commission and are on file and available for inspection and
copying in the Commission's Public Reference Room:
On April 11, 1996, Kaztex Energy Ventures, Inc. filed certain
information as required by the Commission's February 24, 1995, order in
Docket No. ER95-295-000.
On April 19, 1996, Southeastern Energy Resources, Inc. filed
certain information as required by the Commission's February 24, 1995,
order in Docket No. ER95-385-000.
On April 17, 1996, Peak Energy, Inc. filed certain information as
required by the Commission's February 24, 1995, order in Docket No.
ER95-379-000.
On April 15, 1996, Audit Pro Incorporated filed certain information
as required by the Commission's June 2, 1995, order in Docket No. ER95-
878-000.
On April 19, 1996, Superior Electric Power Corporation filed
certain information as required by the Commission's October 23, 1995,
order in Docket No. ER95-1747-000.
On April 18, 1996, Duke Energy Marketing Corp., filed certain
information as required by the Commission's December 14, 1995, order in
Docket No. ER96-109-000.
3. Western Resources, Inc.
[Docket No. ER96-592-000]
Take notice that on April 23, 1996, Western Resources, Inc.
tendered for filing an amendment to its filing in the above referenced
docket. Western Resources states that the amendment is necessary to
provide additional cost support for Service Schedule SE-2 between
Western Resources and the Oklahoma Municipal Power Authority.
Copies of the filing were served upon the Oklahoma Municipal Power
Authority and the Kansas Corporation Commission.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
4. Entergy Power, Inc.
[Docket No. ER96-1092-000]
Take notice that Entergy Power, Inc. (Entergy Power) on April 17,
1996, tendered for filing an amendment to a unit power sales agreement
with the City of Tallahassee which has been filed in the subject
docket. The amendment provides clarifications and commitments as
requested by the Commission Staff. Entergy Power requests waiver of the
Commission's notice requirements under Section 35.11 of the
Commission's Regulations.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
[[Page 19271]]
5. Kentucky Utilities Company
[Docket No. ER96-1113-000]
Take notice that on April 10, 1996, Kentucky Utilities Company (KU)
amended its filing in Docket No. ER96-1113-000 to provide additional
information. KU's original filing was an Amendment to the
Interconnection Agreement between KU and the Big Rivers Electric
Corporation providing for a new interconnection point at KU's Green
River Power Plant 161 KV Substation near Central City, Kentucky,
pursuant to KU Rate Schedule FERC No. 201.
KU states that copies of the filing have been sent to Big Rivers
Electric Corporation, the Public Service Commission of Kentucky and the
Virginia State Corporation Commission.
Comment date: May 8, 1996, in accordance with Standard Paragraph E
at the end of this notice.
6. Oxbow Power Marketing, Inc.
[Docket No. ER96-1196-000]
Take notice that on April 19, 1996, Oxbow Power Marketing, Inc.
(Oxbow), a Delaware corporation, filed a Supplement to Petition for
Order Accepting Rate Schedule For Filing and Granting Waivers and
Blanket Approvals with the Federal Energy Regulatory Commission for
acceptance of Oxbow's Modified Rate Schedule FERC No. 1, providing for
the sale of electricity at market-based rates; the granting of certain
blanket approvals; and the waiver of certain Commission regulations.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
7. Entergy Power, Inc.
[Docket No. ER96-1312-000]
Take notice that Entergy Power, Inc. (Entergy Power) on April 16,
1996, tendered for filing a Certificate of Concurrence to a Power Sales
Agreement between Entergy Power and PECO Energy Company (PECO). Entergy
Power requests an effective date of one day after filing of the Power
Sales Agreement, and respectfully requests waiver of the Commission's
notice requirements under Section 35.11 of the Commission's
regulations.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
8. Wisconsin Power and Light Company
[Docket No. ER96-1352-000]
Take notice that on April 23, 1996, Wisconsin Power and Light
Company (WP&L) tendered for filing an amendment to the above referenced
docket requesting an effective date of January 6, 1996 for, the Service
agreement between WP&L and Koch Power Services Inc., and an effective
date of March 1, 1996, for all other Service Agreements included in the
original filing. These effective dates are in lieu of the October 1,
1995, date that was originally requested.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
9. Megan-Racine Associates, Inc.
[Docket Nos. ER96-1477-000 and EL95-47-001]
Take notice that on April 1, 1996, Megan-Racine Associates, Inc.
tendered for filing FERC Form No. 1 for Megan-Racine for calendar years
1991 through 1994. In addition, as an initial rate schedule under
Section 205 of the Federal Power Act are copies of the Power Sales
Agreement dated November 21, 1987, between Megan-Racine and Niagara
Mohawk Power Corporation.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
10. Illinois Power Company
[Docket No. ER96-1485-000]
Take notice that on April 17, 1996, Illinois Power Company filed a
request to revise the proposed effective date for sales by Illinois
Power to Sonat Power Marketing, Inc. pursuant to a power sales
agreement under Illinois Power's Sales Tariff, FERC Electric Tariff,
Original volume VII.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
11. Jersey Central Power & Light Company, Metropolitan Edison Company,
Pennsylvania Electric Company
[Docket No. ER96-1591-000]
Take notice that on April 18, 1996, GPU Service Corporation (GPU),
on behalf of Jersey Central Power & Light Company, Metropolitan Edison
Company and Pennsylvania Electric Company (jointly referred to as the
GPU Operating Companies), filed an executed Service Agreement between
GPU and Federal Energy Sales, Inc. (FES), dated April 16, 1996. This
Service Agreement specifies that FES has agreed to the rates, terms and
conditions of the GPU Operating Companies' Operating Capacity and/or
Energy Sales Tariff (Sales Tariff) designated as FERC Electric Tariff,
Original Volume No. 1. The Sales Tariff was accepted by the Commission
by letter order issued on February 10, 1995, in Jersey Central Power &
Light Co., Metropolitan Edison Co. and Pennsylvania Electric Co.,
Docket No. ER95-276-000 and allows GPU and FES to enter into separately
scheduled transactions under which the GPU Operating Companies will
make available for sale, surplus operating capacity and/or energy at
negotiated rates that are no higher than the GPU Operating Companies'
cost of service.
GPU requests a waiver of the Commission's notice requirements for
good cause shown and an effective date of April 16, 1996, for the
Service Agreement.
GPU has served copies of the filing on regulatory agencies in New
Jersey and Pennsylvania.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
12. Western Resources, Inc.
[Docket No. ER96-1592-000]
Take notice that on April 18, 1996, Western Resources, Inc.
(Western Resources), tendered for filing a proposed change to its
Federal Energy Regulatory Commission Electric Rate Schedule No. 240.
Western Resources states the purpose of the change is to provide
generation deferral service to the City of Larned. The change is
proposed to become effective June 1, 1996.
Copies of the filing were served upon the City of Larned and the
Kansas Corporation Commission.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
13. Illinois Power Company
[Docket No. ER96-1593-000]
Take notice that on April 18, 1996, Illinois Power Company
(Illinois Power), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing firm and non-firm transmission agreements under
which NorAm Energy Services, Inc. will take transmission service
pursuant to its open access transmission tariff. The agreements are
based on the Form of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 1, 1996.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
14. Louisville Gas and Electric Company
[Docket No. ER96-1595-000]
Take notice that on April 18, 1996, Louisville Gas and Electric
Company, tendered for filing copies of service
[[Page 19272]]
agreements between Louisville Gas and Electric Company and Enron Power
Marketing, Inc. under Rate GSS.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
15. Texas Utilities Electric Company
[Docket No. ER96-1596-000]
Take notice that on April 18, 1996, Texas Utilities Electric
Company (TU Electric), tendered for filing nine executed transmission
service agreements (TSA's) with Central & South West Services, Inc.,
Federal Energy Sales, Inc., NorAm Energy Services, Coastal Electric
Services Company, Central Power and Light Company, West Texas Utilities
Company, Coral Power, L.L.C., Entergy Power, Inc., and Entergy Power
Marketing Corp. for certain Economy Energy and Emergency Power
Transmission Service under TU Electric's Tariff for Transmission
Service To, From and Over Certain HVDC Interconnections.
TU Electric requests an effective date for the TSA's that will
permit them to become effective on or before the service commencement
date under each of the nine TSA's. Accordingly, TU Electric seeks
waiver of the Commission's notice requirements. Copies of the filing
were served on Central & South West Services, Inc., Federal Energy
Sales, Inc., NorAm Energy Services, Coastal Electric Services Company,
Central Power and Light Company, West Texas Utilities Company, Coral
Power, L.L.C., Entergy Power, Inc., and Entergy Power Marketing Corp.,
as well as the Public Utility Commission of Texas.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
16. Ohio Edison Company, Pennsylvania Power Company
[Docket No. ER96-1597-000]
Take notice that on April 19, 1996, Ohio Edison Company, tendered
for filing on behalf of itself and Pennsylvania Power Company, an
Agreement for Power Transactions with Koch Power Services, Inc. This
initial rate schedule will enable the parties to purchase and sell
capacity and energy in accordance with the terms of the Agreement.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
17. Northern States Power Company (Minnesota Company)
[Docket No. ER96-1598-000]
Take notice that on April 19, 1996, Northern States Power Company
(Minnesota) (NSP), tendered for filing the following five related
amendments and agreements:
Amendment No. 1 to the Joint Transmission Network
Agreement among Cooperative Power Association (CPA), NSP, and United
Power Association (UPA);
Amendment No. 1 to the Joint Transmission Network
Initial Equalization Agreement among CPA, NSP, and UPA;
Benton County Equalization Agreement among CPA, NSP,
and UPA;
Chicago County Equalization Agreement between CPA and
NSP, and
Prairie Transformer Equalization Agreement between NSP
and UPA.
These amendments and agreements reflect changes in equipment and
facilities in the Joint Transmission Network owned by CPA, NSP, and
UPA, as well as the associated change to each party's investment
contribution in the Joint Transmission Network.
NSP requests that the Commission accept the amendments and
agreements effective April 22, 1996, and requests waiver of the
Commission's notice requirements in order for the amendments and
agreements to be accepted for filing on the date requested.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
18. Portland General Electric Company
[Docket No. ER96-1600-000]
Take notice that on April 19, 1996, Portland General Electric
Company, submitted an umbrella sales tariff to allow trading using the
model Tule Electric Energy Trading Agreement. This model agreement was
developed by a diverse group of industry participants.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
19. Boston Edison Company
[Docket No. ER96-1601-000]
Take notice that on April 19, 1996, Boston Edison Company (Edison),
tendered for filing a Supplemental Exhibit A to a Service Agreement for
Cambridge Electric Light Company (Cambridge), under its FERC Electric
Tariff, Original Volume No. IV, Non-Firm Transmission Service (the
Tariff). The Exhibit A specifies the amount and duration of
transmission service required by Cambridge under the Tariff.
Edison requests waiver of the Commission's notice requirements to
permit the Exhibit A to become effective as of the commencement date of
the transaction to which it relates, April 1, 1996.
Edison states that it has served the filing on Cambridge and the
Massachusetts Department of Public Utilities.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
20. Boston Edison Company
[Docket No. ER96-1602-000]
Take notice that on April 19, 1996, Boston Edison Company (Edison),
tendered for filing a Supplemental Exhibit A to a Service Agreement for
Cambridge Electric Light Company (Cambridge), under its FERC Electric
Tariff, Original Volume No. IV, Non-Firm Transmission Service (the
Tariff). The Exhibit A specifies the amount and duration of
transmission service required by Cambridge under the Tariff.
Edison requests waiver of the Commission's notice requirements to
permit the Exhibit A to become effective as of the commencement date of
the transaction to which it relates, April 1, 1996.
Edison states that it has served the filing on Cambridge and the
Massachusetts Department of Public Utilities.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
21. Madison Gas and Electric Company
[Docket No. ER96-1603-000]
Take notice that on April 19, 1996, Madison Gas and Electric
Company (MGE), tendered for filing a service agreement with Illinova
Power Marketing, Inc., under MGE's Power Sales Tariff. MGE requests an
effective date 60 days from the filing date.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
22. Indeck Pepperell Power Associates, Inc.
[Docket No. ER96-1604-000]
Take notice that on April 19, 1996, Indeck Pepperell Power
Associates, Inc. (Indeck Pepperell), submitted for filing the Short-
Term Power Purchase Contract (Contract) between New England Power
Company (NEP) and Indeck Pepperell for power sales under Indeck
Pepperell's First Revised Rate Schedule FERC No. 1.
Indeck Pepperell states that its filing is in accordance with Part
35 of the Commission's Regulations. Indeck Pepperell requests a waiver
of the Commission's notice requirements so that the Contract may become
effective April 22, 1996.
Copies of the filing were served upon NEP.
[[Page 19273]]
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
23. Jersey Central Power & Light Company, Metropolitan Edison Company,
Pennsylvania Electric Company
[Docket No. ER96-1605-000]
Take notice that on April 22, 1996, GPU Service Corporation (GPU),
on behalf of Jersey Central Power & Light Company, Metropolitan Edison
Company and Pennsylvania Electric Company (jointly referred to as the
GPU Operating Companies), filed an executed Service Agreement between
GPU and The Cincinnati Gas & Electric Company, PSI Energy, Inc.,
(collectively the Cinergy Operating Companies) and Cinergy Services,
Inc., as agent for and on behalf of the Cinergy Operating Companies
(CINERGY), dated April 17, 1996. This Service Agreement specifies that
Cinergy has agreed to the rates, terms and conditions of the GPU
Operating Companies' Operating Capacity and/or Energy Sales Tariff
(Sales Tariff) designated as FERC Electric Tariff, Original Volume No.
1. The Sales Tariff was accepted by the Commission by letter order
issued on February 10, 1995, in Jersey Central Power & Light Co.,
Metropolitan Edison Co., and Pennsylvania Electric Co., Docket No.
ER95-276-000 and allows GPU and CINERGY to enter into separately
scheduled transactions under which the GPU Operating Companies will
make available for sale, surplus operating capacity and/or energy at
negotiated rates and are no higher than the GPU Operating Companies'
cost of service.
GPU requests a waiver of the Commission's notice requirements for
good cause shown and an effective date of April 17, 1996 for the
Service Agreement.
GPU has served copies of the filing on regulatory agencies in New
Jersey and Pennsylvania.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
24. Jersey Central Power & Light Company, Metropolitan Edison Company,
Pennsylvania Electric Company
[Docket No. ER96-1606-000]
Take notice that on April 22, 1996, GPU Service Corporation (GPU),
on behalf of Jersey Central Power & Light Company, Metropolitan Edison
Company and Pennsylvania Electric Company (jointly referred to as the
GPU Companies), filed a Service Agreement between GPU and Eastex Power
Marketing, Inc. (Eastex) dated April 17, 1996. This Service Agreement
specifies that Eastex has agreed to the rates, terms and conditions of
the GPU Companies' Energy Transmission Service Tariff accepted by the
Commission on September 28, 1995, in Docket No. ER95-791-000 and
designated as FERC Electric Tariff, Original Volume No. 3.
GPU requests a waiver of the Commission's notice requirements for
good causes shown and an effective date April 17, 1996, for the Service
Agreement. GPU has served copies of the filing on regulatory agencies
in New Jersey and Pennsylvania and on Eastex.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
25. Appalachian Power Company, Indiana Michigan Power Company
[Docket No. ER96-1607-000]
Take notice that on April 22, 1996, Appalachian Power Company
(APCo) and Indiana Michigan Power Company (I&M), tendered for filing
with the Commission an Amendment to the existing Transmission and Unit
Power Supply Agreement (Agreement) among I&M, APCo and Carolina Power &
Light Company (CP&L). The Amendment provides for an alternative to one
of the two interconnections that was to be constructed pursuant to the
existing Agreement.
APCo proposes an effective date of June 24, 1996, and states that a
copy of its filing was served on CP&L, the Virginia State Corporation
Commission and the North Carolina Utilities Commission.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
26. Bangor Hydro-Electric Company
[Docket No. ER96-1608-000]
Take notice that on April 22, 1996, Bangor Hydro-Electric Company
(Bangor), tendered for initial filing Service Agreements with the
following customers to receive service under Bangor's FERC Electric
Rate Schedule, Original Volume No. 1:
New England Power Company
PECO Energy Company
Vermont Marble Power Division of OMYA, Inc.
Commonwealth Electric Company
Hudson Light and Power Department
KCS Power Marketing, Inc.
Koch Power Services, Inc.
Burlington Electrical Department
Citizens Lehman Power Sales
LG&E Power Marketing Inc.
Chicopee Municipal Lighting Plant
Coastal Electric Services Co.
Associated Power Services Inc.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
27. USGen Power Services, L.P.
[Docket No. ER96-1609-000]
Take notice that on April 22, 1996, USGen Power Services, L.P.
(USGenPS), tendered for filing confirmation from the Executive
Committee of the Western Systems Power Pool (WSPP) acknowledging
approval of USGenPS's application for membership in the WSPP. USGenPS
requests that the Commission amend the WSPP Agreement to include it as
a participant.
USGenPS requests an effective date of April 22, 1996, for the
proposed amendment. Accordingly, USGenPS requests waiver of the
Commission's notice requirements for good cause shown.
Copies of the filing were served on the WSPP Executive Committee.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
28. Wisconsin Electric Power Company
[Docket No. ER96-1610-000]
Take notice that on April 22, 1996, Wisconsin Electric Power
Company (Wisconsin Electric), tendered for filing an Electric Service
Agreement between itself and Duke/Louis Dreyfus L.L.C. (D/LD). The
Electric Service Agreement provides for service under Wisconsin
Electric's Coordination Sales Tariff.
Wisconsin Electric requests an effective date of sixty days from
the date of this. Copies of the filing have been served on D/LD, the
Public Service Commission of Wisconsin and the Michigan Public Service
Commission.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
29. Arizona Public Service Company
[Docket No. ER96-1611-000]
Take notice that on April 22, 1996, Arizona Public Service Company
(APS), tendered for filing Service Agreements under APS-FERC Electric
Tariff Original Volume No. 1 (APS Tariff) with the following entities:
Electrical District No. 3, and Western Power Services, Inc.
A copy of this filing has been served on the above listed parties
and the Arizona Corporation Commission.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
[[Page 19274]]
30. Cinergy Services, Inc.
[Docket No. ER96-1612-000]
Take notice that on April 22, 1996, Cinergy Services, Inc.
(Cinergy), tendered for filing a service agreement under Cinergy's Non-
Firm Power Sales Standard Tariff (the Tariff) entered into between
Cinergy and the Carolina Power & Light Company.
Cinergy and the Carolina Power & Light Company are requesting an
effective date of April 24, 1996.
Comment date: May 10, 1996, in accordance with Standard Paragraph E
at the end of this notice.
31. PECO Energy Company
[Docket No. ER96-1613-000]
Take notice that on April 22, 1996, PECO Energy Company (PECO),
filed a Service Agreement dated November 1, 1995, with Wisconsin Power
& Light Company (WP&L) under PECO's FERC Electric Tariff Original
Volume No. 1 (Tariff). The Service Agreement adds WP&L as a customer
under the Tariff.
PECO requests an effective date of April 1, 1996, for the Service
Agreement.
PECO states that copies of this filing have been supplied to WP&L
and to the Pennsylvania Public Utility Commission.
Comment date: May 10, 1996, in accordance with Standard Paragraph E
at the end of this notice.
32. Duke Power Company
[Docket No. ER96-1614-000]
Take notice that on April 22, 1996, Duke Power Company (Duke),
tendered for filing a Transmission Service Agreement (TSA) between
Duke, on its own behalf and acting as agent for its wholly-owned
subsidiary, Nantahala Power and Light Company, and Stand Energy Corp.
(Stand Energy). Duke states that the TSA sets out the transmission
arrangements under which Duke will provide Stand Energy non-firm
transmission service under its Transmission Service Tariff.
Comment date: May 10, 1996, in accordance with Standard Paragraph E
at the end of this notice.
33. Mid-Continent Area Power Pool
[Docket No. ER96-1615-000]
Take notice that on April 22, 1996, the Mid-Continent Area Power
Pool (MAPP), submitted for filing pursuant to Part 35 of the
Commission's Regulations, Amendment No. 28 to the Mid-Continent Area
Power Pool Agreement. The Amendment has no effect on rates currently
charged. MAPP requests waiver of the Commission's notice requirements
and an effective date of April 30, 1996, for Amendment No. 28.
Comment date: May 10, 1996, in accordance with Standard Paragraph E
at the end of this notice.
34. Southwestern Electric Power Company
[Docket No. ER96-1616-000]
Take notice that on April 23, 1996, Southwestern Electric Power
Company (SWEPCO), submitted a service agreement establishing Tennessee
Valley Authority (TVA) as a customer under the terms of SWEPCO's
umbrella Coordination Sales Tariff CST-1 (CST-1 Tariff).
SWEPCO requests an effective date of April 1, 1996, and,
accordingly, seeks waiver of the Commission's notice requirements.
Copies of this filing were served upon TVA, the Arkansas Public Service
Commission, the Louisiana Public Service Commission and the Public
Utility Commission of Texas.
Comment date: May 10, 1996, in accordance with Standard Paragraph E
at the end of this notice.
35. Public Service Company of Oklahoma
[Docket No. ER96-1617-000]
Take notice that on April 22, 1996, Public Service Company of
Oklahoma (PSO), submitted a service agreement establishing Tennessee
Valley Authority (TVA) as a customer under the terms of PSO's umbrella
Coordination Sales Tariff CST-1 (CST-1 Tariff).
PSO requests an effective date of April 1, 1996, and accordingly,
seeks waiver of the Commission's notice requirements. Copies of this
filing were served upon TVA and the Oklahoma Corporation Commission.
Comment date: May 10, 1996, in accordance with Standard Paragraph E
at the end of this notice.
36. Progress Power Marketing, Inc.
[Docket No. ER96-1618-000]
Take notice that on April 22, 1996, Progress Power Marketing, Inc.
(PPM), tendered for filing pursuant to Rules 205 and 206 of the
Commission's Rules of Practice and Procedure an application for waivers
and blanket approvals under various regulations of the Commission, and
an order accepting its Rate Schedule No. 1, to be effective on May 14,
1996. PPM intends to engage in electric power and energy transactions
as a marketer and a broker.
Comment date: May 10, 1996, in accordance with Standard Paragraph E
at the end of this notice.
37. Tex-La Electric Cooperative of Texas, Inc.
[Docket No. TX94-4-002]
Take notice that on April 18, 1996, Texas Utilities Electric
Company (TU Electric) tendered for filing an amendment to its
compliance filing of May 1, 1995.
Comment date: May 9, 1996, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 96-10740 Filed 4-30-96; 8:45 am]