97-11263. Koch Gateway Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 84 (Thursday, May 1, 1997)]
[Notices]
[Pages 23773-23774]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-11263]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-351-000]
Koch Gateway Pipeline Company; Notice of Request Under Blanket
Authorization
April 25, 1997.
Take notice that on April 17, 1997, Koch Gateway Pipeline Company
(Koch Gateway), PO Box 1478, Houston, Texas 77251-1478, filed in Docket
No. CP97-351-000 a request pursuant to Sections 157.205 and 157.211 of
the Commission's Regulations (18 CFR 157.205, 157.211) under the
Natural Gas Act (NGA) for authorization to operate existing delivery
point facilities constructed under the authorization of Section 311 of
the Natural Gas Policy Act of 1978 (NGPA) in St. Mary Parish,
Louisiana, for Part 284 transportation services by Koch Gateway, under
Koch Gateway's blanket certificate issued in Docket No. CP82-430-000,
pursuant to Section 7 of the NGA, all as more fully set forth in the
request that is on file with the Commission and open to public
inspection.
Koch Gateway proposes to operate the existing 2-inch tap, which was
installed to make deliveries of gas transported under Koch Gateway's
Part 284 blanket certificate to Trans-Louisiana Gas Company (Trans-La),
an intrastate pipeline. It is stated that Koch Gateway was fully
reimbursed for the cost of installing the tap by Trans-La. It is
estimated that the average day and peak day requirements for this
delivery point are 120 MMBtu equivalent and 1,200 MMBtu equivalent,
respectively. It is asserted that the proposal would
[[Page 23774]]
provide Koch Gateway with additional flexibility in obtaining gas
supplies.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-11263 Filed 4-30-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 05/01/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-11263
- Pages:
- 23773-23774 (2 pages)
- Docket Numbers:
- Docket No. CP97-351-000
- PDF File:
-
97-11263.pdf