E7-8267. Office of Fossil Energy, Certification Notice-212; Notice of Filings of Coal Capability Powerplant and Industrial Fuel Use Act  

  • Start Preamble Start Printed Page 23807

    AGENCY:

    Office of Fossil Energy, Department of Energy.

    ACTION:

    Notice of filings.

    SUMMARY:

    The owners or operators of twelve baseload electric powerplants have submitted coal capability self-certifications pursuant to section 201 of the Powerplant and Industrial Fuel Use Act of 1978 (FUA) and Department of Energy (DOE) regulations in 10 CFR 501.60, 61.

    ADDRESSES:

    Copies of self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Room 8G-026, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Russell at (202) 586-9624.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new baseload electric powerplants may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to FUA section 201(d), in order to meet the requirement of coal capability, the owner or operator of such facilities proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date filed with the Secretary. The Secretary is required to publish a notice in the Federal Register that a certification has been filed. The following owners of proposed new baseload electric powerplants have filed self-certifications pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61.

    OwnerCapacity (MW)Plant locationIn-service date
    Freeport Energy Center, L.P265Freeport, TXJune 2005.
    Mankato Energy Center, LLC505Mankato, MNJune 2006.
    MEP Pleasant Hill, LLC585Pleasant Hill, MOPhase I: June 2001. Phase II: Feb. 2002.
    Bethpage Energy Center 3, LLC79.9Hicksville, NYJune 2005.
    Consolidated Edison Company of New York Inc360New York, NYFirst Qtr. 2005.
    Brazos Valley Energy LP508Richmond, TXMay 2003.
    Florida Municipal Power Agency48Key West, FLApril 10, 2006.
    Bridgeport Energy, LLC490Bridgeport, CTJuly 1999.
    Duke Energy Moss Landings1,020Moss Landing, CAJuly 2002.
    Florida Municipal Power Agency300Fort Pierce, FLMay 1, 2008.
    Caithness Long Island, LLC346Yaphank, NYJuly 1, 2009.
    Plains End II, LLC118Golden, COMay 2008.
    Start Signature

    Issued in Washington, DC, on April 24, 2007.

    Anthony J. Como,

    Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability.

    End Signature End Supplemental Information

    [FR Doc. E7-8267 Filed 4-30-07; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Published:
05/01/2007
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of filings.
Document Number:
E7-8267
Pages:
23807-23807 (1 pages)
PDF File:
e7-8267.pdf