2015-10217. Drawbridge Operation Regulation; Annisquam River and Blynman Canal, Gloucester, MA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulation.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the Blynman (SR 127) Bridge across the Annisquam River and Blynman Canal, mile 0.0, at Gloucester, Massachusetts. This deviation is necessary to facilitate public safety during a public event, the annual Saint Peter's Fiesta 5K Road Race. This deviation allows the bridge to remain closed for thirty minutes to facilitate public safety.

    DATES:

    This deviation is effective from 6:15 p.m. to 6:45 p.m. on June 25, 2015.

    ADDRESSES:

    The docket for this deviation, [USCG-2015-0292] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140, on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC, 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, contact Ms. Judy K. Leung-Yee, Project Officer, First Coast Guard District, telephone (212) 514-4330, Start Printed Page 24815 judy.k.leung-yee@uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone (202) 366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Blynman (SR 127) Bridge across the Annisquam River and Blynman Canal, mile 0.0, at Gloucester, Massachusetts, has a vertical clearance in the closed position of 8.2 feet at mean high water and 16 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.586.

    The owner of the bridge, Massachusetts Department of Transportation, requested a temporary deviation from the normal operating schedule to facilitate a public event, the Annual Saint Peter's Fiesta 5K Road Race.

    Under this temporary deviation, the Blynman (SR 127) Bridge may remain in the closed position for thirty minutes between 6:15 p.m. and 6:45 p.m. on Thursday June 25, 2015.

    The waterways are transited by commercial and seasonal recreational vessels of various sizes. There is an alternate route for vessel traffic around Cape Ann. Also, vessels that can pass under the closed draws during this closure may do so at all times.

    The Coast Guard will inform the users of the waterways through our Local and Broadcast Notice to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: April 21, 2015.

    C.J. Bisignano,

    Supervisory Bridge Management Specialist, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2015-10217 Filed 4-30-15; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
6/25/2015
Published:
05/01/2015
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulation.
Document Number:
2015-10217
Dates:
This deviation is effective from 6:15 p.m. to 6:45 p.m. on June 25, 2015.
Pages:
24814-24815 (2 pages)
Docket Numbers:
Docket No. USCG-2015-0292
PDF File:
2015-10217.pdf
CFR: (1)
33 CFR 117