95-11477. Northern American Energy Services Co., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 90 (Wednesday, May 10, 1995)]
    [Notices]
    [Pages 24845-24846]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-11477]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG95-44-000, et al.]
    
    
    Northern American Energy Services Co., et al.; Electric Rate and 
    Corporate Regulation Filings
    
    May 3, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Northern American Energy Services Co.
    
    [Docket No. EG95-44-000]
    
        On April 21, 1995, North American Energy Services Company, a 
    Washington corporation (``Applicant''), with its principle executive 
    office at Issaquah, Washington, filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    Regulations (the ``Application'').
        Applicant has entered into an operation and maintenance agreement 
    with Turbine Power Co. S.A., a copy organized under the laws of the 
    Republic of Argentina, to operate and maintain a 123-megawatt natural 
    gas-fired, electric power generating facility located at General Roca, 
    Argentina (the ``Project''). Project facilities also include a gas 
    pipeline that interconnects with a regional gas carrier's pipeline, a 
    natural gas processing unit, and a 132-Kv switching station which is 
    interconnected with a 132-Kv transmission line owned by Energia Rio 
    Negro Sociedad del Estado (``ERSE''), the state-owned electric company 
    of the Province of Rio Negro, Republic of Argentina. The Project is 
    expected to commence generating electric power during March 1995. All 
    of the power generated at the Project will be sold at wholesale by the 
    Project's owner, Turbine owner Co. S.A., to ERSE pursuant to a purchase 
    and sale agreement.
        Comment date: May 23, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    2. The Hub Power Company Limited
    
    [Docket No. EG95-46-000]
    
        Take notice that on April 28, 1995, The Hub Power Company Limited, 
    a Pakistani corporation, filed with the Federal Energy Regulatory 
    Commission an application for determination of [[Page 24846]] exempt 
    wholesale generator status pursuant to Section 32(a)(1) of the Public 
    Utility Holding Company Act of 1935, as amended by Section 711 of the 
    Energy Policy Act of 1992.
        The applicant is a corporation that is engaged directly and 
    exclusively in developing, owning and operating a 1292 MW (gross) oil-
    fired electric power production facility in Pakistan.
        Comment date: May 23, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    3. Entergy Power Asia Ltd.
    
    [Docket No. EG95-47-000]
    
        Take notice that on April 28, 1995, Entergy Power Asia Ltd., Three 
    Financial Centre, Suite 210, 900 South Shackleford Road, Little Rock, 
    Arkansas 72211, filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to Section 32(a)(1) of the Public Utility Holding Company Act 
    of 1935, as amended by Section 711 of the Energy Policy Act of 1992.
        The applicant states that it is a corporation that is engaged 
    directly or indirectly and exclusively in owning or operating, or both 
    owning and operating, electric power facilities. The applicant further 
    states that it has previously been found to be an exempt wholesale 
    generator. According to the Applicant, this application is occasioned 
    by the applicant's intended acquisition of an indirect ownership 
    interest in a 1292 MW oil-fired electric generating facility located in 
    the Pakistani province of Balochistan.
        Comment date: May 23, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    4. Entergy Power Operations Corp.
    
    [Docket No. EG95-48-000]
    
        Take notice that on April 28, 1995, Entergy Power Operations 
    Corporation, Three Financial Centre, Suite 210, 900 South Shackleford 
    Road, Little Rock, Arkansas 72211, filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Section 32(a)(1) of the Public 
    Utility Holding Company Act of 1935, as amended by Section 711 of the 
    Energy Policy Act of 1992.
        Applicant states that it is a corporation that is engaged directly 
    or indirectly and exclusively in owning or operating, or both owning 
    and operating, electric power facilities and selling electric energy. 
    Applicant further states that it intends initially to engage, 
    indirectly, in operating a 200 MW coal-fired eligible facility located 
    in Sibolga, Sumatra Utara in the province of North Sumatra, Indonesia.
        Comment date: May 23, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    5. PacifiCorp
    
    [Docket No. ER95-646-000]
    
        Take notice that on April 21, 1995, PacifiCorp tendered for filing 
    in accordance with 18 CFR Part 35 of the Commission's Rules and 
    Regulations, an amended filing in this Docket.
        Copies of this filing were supplied to the City of Anaheim, 
    California, the Public Utilities Commission of the State of California, 
    the Washington Utilities and Transportation Commission and the Public 
    Utility Commission of Oregon.
        Comment date: May 17, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Vermont Electric Power Co.
    
    [Docket No. ER95-741-000]
    
        Take notice that on April 26, 1995, Vermont Electric Power Company 
    tendered for filing a request to postpone the effective date for the 
    Supplement to its 1991 Transmission Agreement, Rate Schedule No. 246, 
    filed on March 13, 1995 from May 1, 1995 to May 25, 1995.
        Comment date: May 17, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. Louisville Gas and Electric Co.
    
    [Docket No. ER95-926-000]
    
        Take notice that on April 18, 1995, Louisville Gas and Electric 
    Company tendered for filing a copy of a service agreement between 
    Louisville Gas and Electric Company and ENRON Power Marketing, Inc. 
    under Rate GSS.
        Notice is also given that the service agreement listed below and 
    filed with the Federal Energy Regulatory Commission Gas and Electric 
    Company is to be cancelled.
    
    ------------------------------------------------------------------------
     Date of                                      Cancellation  Cancellation
    agreement              Purchaser                  date        effective 
    ------------------------------------------------------------------------
    4/5/95...  ENRON Power Marketing, Inc.......      4/5/95        4/5/95  
    ------------------------------------------------------------------------
    
        Comment date: May 17, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. Central Hudson Gas & Electric Corp.
    
    [Docket No. ER95-944-000]
    
        Take notice that Central Hudson Gas and Electric Corporation 
    (Central Hudson) on April 24, 1995, tendered for filing its development 
    of actual costs for 1994 related to transmission service provided from 
    the Roseton Generating Plant to Consolidated Edison Company of New 
    York, Inc. (Con Edison) and Niagara Mohawk Power Corporation (Niagara 
    Mohawk) in accordance with the provisions of its Rate Schedule FERC No. 
    42.
        The actual costs for 1994 amounted to $0.9973 per Mw.-day to Con 
    Edison and $3.7517 per Mw.-day to Niagara Mohawk and are the basis on 
    which charges for 1995 have been estimated.
        Central Hudson requests waiver on the notice requirements to permit 
    charges to become effective January 1, 1995 as agreed by the parties.
        Central Hudson states that a copy of its filing was served on Con 
    Edison, Niagara Mohawk and the State of New York Public Service 
    Commission.
        Comment date: May 17, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-11477 Filed 5-9-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
05/10/1995
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
95-11477
Dates:
May 23, 1995, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
24845-24846 (2 pages)
Docket Numbers:
Docket No. EG95-44-000, et al.
PDF File:
95-11477.pdf