[Federal Register Volume 60, Number 90 (Wednesday, May 10, 1995)]
[Notices]
[Pages 24845-24846]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-11477]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG95-44-000, et al.]
Northern American Energy Services Co., et al.; Electric Rate and
Corporate Regulation Filings
May 3, 1995.
Take notice that the following filings have been made with the
Commission:
1. Northern American Energy Services Co.
[Docket No. EG95-44-000]
On April 21, 1995, North American Energy Services Company, a
Washington corporation (``Applicant''), with its principle executive
office at Issaquah, Washington, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
Regulations (the ``Application'').
Applicant has entered into an operation and maintenance agreement
with Turbine Power Co. S.A., a copy organized under the laws of the
Republic of Argentina, to operate and maintain a 123-megawatt natural
gas-fired, electric power generating facility located at General Roca,
Argentina (the ``Project''). Project facilities also include a gas
pipeline that interconnects with a regional gas carrier's pipeline, a
natural gas processing unit, and a 132-Kv switching station which is
interconnected with a 132-Kv transmission line owned by Energia Rio
Negro Sociedad del Estado (``ERSE''), the state-owned electric company
of the Province of Rio Negro, Republic of Argentina. The Project is
expected to commence generating electric power during March 1995. All
of the power generated at the Project will be sold at wholesale by the
Project's owner, Turbine owner Co. S.A., to ERSE pursuant to a purchase
and sale agreement.
Comment date: May 23, 1995, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
2. The Hub Power Company Limited
[Docket No. EG95-46-000]
Take notice that on April 28, 1995, The Hub Power Company Limited,
a Pakistani corporation, filed with the Federal Energy Regulatory
Commission an application for determination of [[Page 24846]] exempt
wholesale generator status pursuant to Section 32(a)(1) of the Public
Utility Holding Company Act of 1935, as amended by Section 711 of the
Energy Policy Act of 1992.
The applicant is a corporation that is engaged directly and
exclusively in developing, owning and operating a 1292 MW (gross) oil-
fired electric power production facility in Pakistan.
Comment date: May 23, 1995, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
3. Entergy Power Asia Ltd.
[Docket No. EG95-47-000]
Take notice that on April 28, 1995, Entergy Power Asia Ltd., Three
Financial Centre, Suite 210, 900 South Shackleford Road, Little Rock,
Arkansas 72211, filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to Section 32(a)(1) of the Public Utility Holding Company Act
of 1935, as amended by Section 711 of the Energy Policy Act of 1992.
The applicant states that it is a corporation that is engaged
directly or indirectly and exclusively in owning or operating, or both
owning and operating, electric power facilities. The applicant further
states that it has previously been found to be an exempt wholesale
generator. According to the Applicant, this application is occasioned
by the applicant's intended acquisition of an indirect ownership
interest in a 1292 MW oil-fired electric generating facility located in
the Pakistani province of Balochistan.
Comment date: May 23, 1995, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
4. Entergy Power Operations Corp.
[Docket No. EG95-48-000]
Take notice that on April 28, 1995, Entergy Power Operations
Corporation, Three Financial Centre, Suite 210, 900 South Shackleford
Road, Little Rock, Arkansas 72211, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Section 32(a)(1) of the Public
Utility Holding Company Act of 1935, as amended by Section 711 of the
Energy Policy Act of 1992.
Applicant states that it is a corporation that is engaged directly
or indirectly and exclusively in owning or operating, or both owning
and operating, electric power facilities and selling electric energy.
Applicant further states that it intends initially to engage,
indirectly, in operating a 200 MW coal-fired eligible facility located
in Sibolga, Sumatra Utara in the province of North Sumatra, Indonesia.
Comment date: May 23, 1995, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
5. PacifiCorp
[Docket No. ER95-646-000]
Take notice that on April 21, 1995, PacifiCorp tendered for filing
in accordance with 18 CFR Part 35 of the Commission's Rules and
Regulations, an amended filing in this Docket.
Copies of this filing were supplied to the City of Anaheim,
California, the Public Utilities Commission of the State of California,
the Washington Utilities and Transportation Commission and the Public
Utility Commission of Oregon.
Comment date: May 17, 1995, in accordance with Standard Paragraph E
at the end of this notice.
6. Vermont Electric Power Co.
[Docket No. ER95-741-000]
Take notice that on April 26, 1995, Vermont Electric Power Company
tendered for filing a request to postpone the effective date for the
Supplement to its 1991 Transmission Agreement, Rate Schedule No. 246,
filed on March 13, 1995 from May 1, 1995 to May 25, 1995.
Comment date: May 17, 1995, in accordance with Standard Paragraph E
at the end of this notice.
7. Louisville Gas and Electric Co.
[Docket No. ER95-926-000]
Take notice that on April 18, 1995, Louisville Gas and Electric
Company tendered for filing a copy of a service agreement between
Louisville Gas and Electric Company and ENRON Power Marketing, Inc.
under Rate GSS.
Notice is also given that the service agreement listed below and
filed with the Federal Energy Regulatory Commission Gas and Electric
Company is to be cancelled.
------------------------------------------------------------------------
Date of Cancellation Cancellation
agreement Purchaser date effective
------------------------------------------------------------------------
4/5/95... ENRON Power Marketing, Inc....... 4/5/95 4/5/95
------------------------------------------------------------------------
Comment date: May 17, 1995, in accordance with Standard Paragraph E
at the end of this notice.
8. Central Hudson Gas & Electric Corp.
[Docket No. ER95-944-000]
Take notice that Central Hudson Gas and Electric Corporation
(Central Hudson) on April 24, 1995, tendered for filing its development
of actual costs for 1994 related to transmission service provided from
the Roseton Generating Plant to Consolidated Edison Company of New
York, Inc. (Con Edison) and Niagara Mohawk Power Corporation (Niagara
Mohawk) in accordance with the provisions of its Rate Schedule FERC No.
42.
The actual costs for 1994 amounted to $0.9973 per Mw.-day to Con
Edison and $3.7517 per Mw.-day to Niagara Mohawk and are the basis on
which charges for 1995 have been estimated.
Central Hudson requests waiver on the notice requirements to permit
charges to become effective January 1, 1995 as agreed by the parties.
Central Hudson states that a copy of its filing was served on Con
Edison, Niagara Mohawk and the State of New York Public Service
Commission.
Comment date: May 17, 1995, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-11477 Filed 5-9-95; 8:45 am]
BILLING CODE 6717-01-P