-
Start Preamble
In accordance with part 211 of Title 49 Code of Federal Regulations (CFR), notice is hereby given that the Federal Railroad Administration (FRA) received a request for a waiver of compliance with certain requirements of its safety standards. The individual petition is described below, including the party seeking relief, the regulatory provisions involved, the nature of the relief being requested, and the petitioner's arguments in favor of relief.
North Star Rail
The North Star Rail seeks a waiver of compliance with the Inspection and Maintenance Standards for Steam Locomotives, 49 CFR part 230, published November 17, 1999. Section 230.3(c) of the standards requires steam locomotives having flue tubes replaced prior to September 25, 1995, have a one thousand four hundred seventy-two service day inspection (49 CFR 230.17) performed prior to being allowed to operate under the requirements. North Star Rail seeks this waiver for one locomotive number 261 which was built in 1944. The railroad's records indicate the locomotive was overhauled and had the flue tubes replaced in 1993. Since the overhaul the locomotive has operated under steam a total of 240 days. North Star Rail states that the locomotive is stored year round indoors in a modern shop facility.
Interested parties are invited to participate in these proceedings by Start Printed Page 24176submitting written views, data, or comments. FRA does not anticipate scheduling a public hearing in connection with these proceedings, since the facts do not appear to warrant a hearing. If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request.
All communications concerning these proceedings should identify the appropriate docket number (e.g., Waiver Petition Docket Number FRA-2001-8961) and must be submitted to the Docket Clerk, DOT Central Docket Management Facility, Room PI-401, Washington, DC., 20590-0001. Communications received within 45 days of the date of this notice will be considered by FRA before final action is taken. Comments received after that date will be considered as far as practicable. All written communications concerning these proceedings are available for examination during regular business hours (9 a.m.-5 p.m.) at the above facility. All documents in the public docket are also available for inspection and copying on the Internet at the docket facility's Web site at http://dms.dot.gov.
Start SignatureIssued in Washington, DC. on May 7, 2001.
Grady C. Cothen, Jr.,
Deputy Associate Administrator for Safety Standards and Program Development.
[FR Doc. 01-11953 Filed 5-10-01; 8:45 am]
BILLING CODE 4910-06-P
Document Information
- Published:
- 05/11/2001
- Department:
- Federal Railroad Administration
- Entry Type:
- Notice
- Document Number:
- 01-11953
- Pages:
- 24175-24176 (2 pages)
- Docket Numbers:
- Docket Number FRA-2001-8961
- PDF File:
- 01-11953.pdf