2016-11224. Staff Notice of Alleged Violations  

  • Start Preamble Start Printed Page 29559

    Take notice [1] that in a nonpublic investigation pursuant to 18 CFR part 1b (2015), the staff of the Office of Enforcement of the Federal Energy Regulatory Commission has preliminary determined that Saracen Energy Midwest, LP, violated Southwest Power Pool, Inc.'s Open Access Transmission Tariff, Attachment AE, 7.4.1(4), by submitting bids for Transmission Congestion Rights at Electronically Equivalent Settlement Locations between August 2014 and March 2015.

    This Notice does not confer a right on third parties to intervene in the investigation or any other right with respect to the investigation.

    Start Signature

    Dated: May 6, 2016.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  Enforcement of Statutes, Regulations, and Orders, 129 FERC ¶ 61,247 (2009), order on reh'g, 134 FERC ¶ 61,054 (2011).

    Back to Citation

    [FR Doc. 2016-11224 Filed 5-11-16; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
05/12/2016
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2016-11224
Pages:
29559-29559 (1 pages)
PDF File:
2016-11224.pdf