96-11982. El Paso Natural Gas Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 94 (Tuesday, May 14, 1996)]
[Notices]
[Pages 24301-24302]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11982]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-486-000]
El Paso Natural Gas Company; Notice of Request Under Blanket
Authorization
May 8, 1996.
Take notice that on May 3, 1996, El Paso Natural Gas Company (El
Paso), Post Office Box 1492, El Paso, Texas 79978, filed a request with
the Commission in Docket No. CP96-486-000, pursuant to Sections 157.205
and 157.212 of the Commission's Regulations under the Natural Gas Act
(NGA) for authorization to operate two existing tap and valve
assemblies located in Reeves County, Texas as jurisdictional delivery
points for the delivery of natural gas, authorized in blanket
certificates issued in Docket Nos. CP82-435-000 and CP88-433-000, all
as more fully set forth in the request on file with the Commission and
open to the public inspection.
El Paso proposes to utilize two existing tap and valve assemblies
which El Paso states that it installed in connection with the
construction and installation of their Lockridge and Hamon-Toro Line
Field Compressor Stations to facilitate the delivery of its own
pipeline quality gas supply for fuel to these compressors. The
compressor stations are now owned by a different entity but still
require pipeline quality gas for fuel. Therefore, El Paso now seeks
authorization to utilize the two existing tap and valve assemblies as
jurisdictional delivery points to provide El Paso Field Service Company
(Field Services) natural gas deliveries, at Field Services' request.
Field Services intends to supply El Paso Gas Marketing Company (Gas
Marketing) with gas for fuel at the Lockridge and Hamon-Toro Line Field
Compressor Stations. In turn, Gas Marketing has requested El Paso to
provide interruptible transportation to the two existing tap and valve
assemblies on El Paso's mainline transmission system in Reeves Country,
Texas.
El Paso states that the operation of the proposed delivery points
at the Lockridge and Hamon-Toro Line Field Compressor Stations is not
prohibited by El Paso's existing Volume No. 1-A Tariff and that the
volumes proposed to be delivered through the two existing tap and valve
assemblies would be delivered pursuant to an effective transportation
arrangement between El Paso and Gas Marketing. El Paso further states
that it has sufficient capacity to accomplish the deliveries specified
under the Transportation Service Agreement without detriment or
[[Page 24302]]
disadvantage to El Paso's other customers.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 96-11982 Filed 5-13-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 05/14/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-11982
- Pages:
- 24301-24302 (2 pages)
- Docket Numbers:
- Docket No. CP96-486-000
- PDF File:
-
96-11982.pdf