-
Start Preamble
Start Printed Page 22810
AGENCIES:
Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Technical amendments.
SUMMARY:
This document makes amendments to the Federal Acquisition Regulation (FAR), Federal Acquisition Circular (FAC) 2005-32, published in the Federal Register at 74 FR 14622-14652, on March 31, 2009, in order to make editorial and correcting changes.
DATES:
Effective Date: May 14, 2009.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
The Regulatory Secretariat, 1800 F Street, NW., Room 4041, Washington, DC 20405, (202) 501-4755, for information pertaining to status or publication schedule. Please cite FAC 2005-32, Technical Amendments.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
This document makes amendments to the Federal Acquisition Regulation (FAR), Federal Acquisition Circular (FAC) 2005-32, published in the Federal Register at 74 FR 14622-14652, on March 31, 2009, in order to make editorial and correcting changes.
Start List of SubjectsList of Subjects in 48 CFR Parts 5, 25, and 52
- Government procurement
Therefore, DoD, GSA, and NASA amend 48 CFR parts 5, 25, and 52 as set forth below:
End Amendment Part Start Amendment Part1. The authority citation for 48 CFR parts 5, 25, and 52 continues to read as follows:
End Amendment Part Start PartPART 5—PUBLICIZING CONTRACT ACTIONS
End Part[Amended]2. Amend section 5.705 in the table that follows paragraph (b) by removing, from the second column, the heading “Posting Rationale on Special Section of Recovery.Gov” and adding “Rationale Required” in its place; and by removing, from the sixth row, second column, the colon and adding an em dash in its place.
End Amendment Part Start PartPART 25—FOREIGN ACQUISITION
End Part Start Amendment Part3. Amend section 25.200 by adding paragraph (c) to read as follows:
End Amendment PartScope of subpart.(c) When using funds appropriated or otherwise provided by the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) for construction, see Subpart 25.6.
4. Amend section 25.1102 by removing from paragraph (c)(3) “other than Mexico” and adding “other than Bahrain, Mexico, and Oman” in its place; and revising paragraphs (e)(2)(i) and (e)(2)(ii) to read as follows:
End Amendment PartAcquisition of construction.(e) * * *
(2) * * *
(i) Basic clause. List all foreign construction materials excepted from the Buy American Act or section 1605 of the the Recovery Act, other than Recovery Act designated country construction material.
(ii) Alternate I. List in paragraph (b)(3) of the clause all foreign construction material excepted from the Buy American Act or section 1605 of the Recovery Act, unless the excepted foreign construction material is from a Recovery Act designated country other than Bahrain, Mexico, or Oman.
PART 52—SOLICITATION PROVISIONS AND CONTRACT CLAUSES
End Part[Amended]5. Amend section 52.204-11 in paragraph (a), in the definition “Total Compensation” by removing the period after the paragraph (6) designation.
End Amendment Part Start Amendment Part6. Amend section 52.212-5 by—
End Amendment Part Start Amendment Parta. Revising the date of the clause;
End Amendment Part Start Amendment Partb. Revising paragraphs (b)(3), (b)(16), and (b)(18);
End Amendment Part Start Amendment Partc. Removing and reserving paragraph (e)(1)(iii); and
End Amendment Part Start Amendment Partd. In Alternate II by—
End Amendment Part Start Amendment Part1. Revising the date of the Alternate;
End Amendment Part Start Amendment Part2. Redesignating paragraphs (e)(1)(ii)(B) through (e)(1)(ii)(M) as paragraphs (e)(1)(ii)(C) through (e)(1)(ii)(N), respectively; and adding a new paragraph (e)(1)(ii)(B); and
End Amendment Part Start Amendment Part3. Removing from the newly designated paragraph (e)(1)(ii)(J) “2.222-51” and adding “52.222-51” in its place.
End Amendment Part Start Amendment PartThe revised and added text reads as follows:
End Amendment PartContract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items.* * * * *CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS “(MAY 2009)”
(b) * * *
(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (MAR 2009) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__(16) 52.219-26, Small Disadvantaged Business Participation Program—Incentive Subcontracting (OCT 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__(18) 52.219-28, Post Award Small Business Program Rerepresentation (APR 2009) (15 U.S.C. 632(a)(2)).
* * * * *Alternate II “(MAY 2009)”. * * *
(e)(1) * * *
(ii) * * *
(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (MAR 2009) (Section 1553 of Pub. L. 111-5).
Federal Acquisition Circular
Federal Acquisition Circular (FAC) 2005-32, Technical Amendments, is issued under the authority of the Secretary of Defense, the Administrator of General Services, and the Administrator for the National Aeronautics and Space Administration.
Unless otherwise specified, all Federal Acquisition Regulation (FAR) and other directive material contained in FAC 2005-32, Technical Amendments is effective May 14, 2009.
Start SignatureStart Printed Page 22811End Signature Start SignatureDated: May 5, 2009.
Amy G. Williams,
Acting Deputy Director, Defense Procurement and Acquisition Policy (Defense Acquisition Regulations System).
Dated: May 6, 2009.
Rodney P. Lantier,
Acting Senior Procurement Executive & Acting Deputy Chief Acquisition Officer, Office of the Chief Acquisition Officer, U.S. General Services Administration.
Dated: May 4, 2009.
William P. McNally,
Assistant Administrator for Procurement, National Aeronautics and Space Administration.
[FR Doc. E9-11039 Filed 5-13-09; 8:45 am]
BILLING CODE 6820-EP-S
Document Information
- Comments Received:
- 0 Comments
- Published:
- 05/14/2009
- Department:
- National Aeronautics and Space Administration
- Entry Type:
- Rule
- Action:
- Technical amendments.
- Document Number:
- E9-11039
- Pages:
- 22809-22811 (3 pages)
- Docket Numbers:
- FAC 2005-32, Docket 2009-0003, Sequence 3
- Topics:
- Government procurement
- PDF File:
- e9-11039.pdf
- CFR: (5)
- 48 CFR 5.705
- 48 CFR 25.200
- 48 CFR 25.1102
- 48 CFR 52.204-11
- 48 CFR 52.212-5