[Federal Register Volume 63, Number 94 (Friday, May 15, 1998)]
[Notices]
[Pages 27066-27068]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-12932]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER98-2884-000, et al.]
Illinois Power Company, et al. Electric Rate and Corporate
Regulation Filings
May 7, 1998.
Take notice that the following filings have been made with the
Commission:
1. Illinois Power Company
[Docket No. ER98-2884-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm transmission agreements under which PPG Industries, Inc.,
will take transmission service pursuant to its open access transmission
tariff. The agreements are based on the Form of Service Agreement in
Illinois Power's tariff.
Illinois Power has requested an effective date of May 1, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
2. IES Utilities Inc., Interstate Power Company, Wisconsin Power &
Light Company, South Beloit Water, Gas & Electric Company Heartland
Energy Services and Industrial Energy Applications, Inc.
[Docket Nos. EC96-13-000, ER96-1236-000, and ER96-2560-000]
Take notice that on May 4, 1998, Alliant Services, Inc. (Alliant),
on its own behalf and on behalf of IES Utilities Inc., Interstate Power
Company, Wisconsin Power & Light Company, South Beloit Water, Gas &
Electric Company, Heartland Energy Services and Industrial Energy
Applications, Inc. (the IEC Operating Companies), submitted an
amendment to its filing in these dockets.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
3. Rochester Gas and Electric Corporation
[Docket No. ER98-2886-000]
Take notice that on May 4, 1998, Rochester Gas and Electric
Corporation (RG&E), filed a Service Agreement between RG&E and the
SCANA Energy Marketing, Inc., (Customer). This Service Agreement
specifies that the Customer has agreed to the rates, terms and
conditions of the RG&E open access transmission tariff filed on July 9,
1996 in Docket No. OA96-141-000.
RG&E requests waiver of the Commission's sixty (60) day notice
requirements and an effective date of April 28, 1998, for the SCANA
Energy Marketing, Inc., Service Agreement. RG&E has served copies of
the filing on the New York State Public Service Commission and on the
Customer.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
4. Illinois Power Company
[Docket No. ER98-2887-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing a Power Sales Tariff, Service Agreement under which NGE
Generation, Inc., will take service under Illinois Power Company's
Power Sales Tariff. The agreements are based on the Form of Service
Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 27, 1998.
[[Page 27067]]
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
5. Illinois Power Company
[Docket No. ER98-2888-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm and non-firm transmission agreements under which Archer
Daniels Midland Company will take transmission service pursuant to its
open access transmission tariff. The agreements are based on the Form
of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 30, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
6. Idaho Power Company
[Docket No. ER98-2889-000]
Take notice that on May 4, 1998, Idaho Power Company (IPC),
tendered for filing with the Federal Energy Regulatory Commission
Service Agreements under Idaho Power Company FERC Electric Tariff No.
6, Market Rate Power Sales Tariff, between Idaho Power Company and
Black Hills Power & Light Co.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
7. Rochester Gas and Electric Corporation
[Docket No. ER98-2890-000]
Take notice that on May 4, 1998, Rochester Gas and Electric
Corporation (RG&E), filed a Market Based Service Agreement between RG&E
and Cinergy Capital & Trading Marketing Inc., (Customer). This Service
Agreement specifies that the Customer has agreed to the rates, term and
conditions of RG&E's FERC Electric Rate Schedule, Original Volume No. 3
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-
3556-000 (80 FERC para. 61,284).
RG&E requests waiver of the Commission's sixty (60) day notice
requirements and an effective date of April 20th, Strategic Energy
Ltd's Service Agreement. RG&E has served copies of the filing on the
New York State Public Service Commission and on the Customer.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
8. Illinois Power Company
[Docket No. ER98-2891-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing non-firm transmission agreements under which VTEC Energy, Inc.,
will take transmission service pursuant to its open access transmission
tariff. The agreements are based on the Form of Service Agreement in
Illinois Power's tariff.
Illinois Power has requested an effective date of May 1, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
9. Wisconsin Electric Power Company
[Docket No. ER98-2892-000]
Take notice that on May 4, 1998, Wisconsin Electric Power Company
(Wisconsin Electric), tendered for filing a short term firm
transmission service agreement between itself and Pennsylvania Power
and Light Company, Inc. (PP&L), under Wisconsin Electric's FERC
Electric Tariff, Volume No. 7, which is pending Commission
consideration in Docket No. OA97-578. Wisconsin Electric respectfully
requests an effective date coincident with its filing. Wisconsin
Electric is authorized to state that PP&L joins in the requested
effective date.
Copies of the filing have been served on PP&L, the Michigan Public
Service Commission, and the Public Service Commission of Wisconsin.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
10. South Carolina Electric & Gas Company
[Docket No. ER98-2893-000]
Take notice that on May 4, 1998, South Carolina Electric & Gas
Company (SCE&G), submitted service agreements establishing Equitable
Power Services Company (EPSC) and Federal Energy Sales, Inc. (FES), as
customers under the terms of SCE&G's Negotiated Market Sales Tariff.
SCE&G requests an effective date of one day subsequent to the
filing of the service agreements. Accordingly, SCE&G requests waiver of
the Commission's notice requirements. Copies of this filing were served
upon EPSC, FES, and the South Carolina Public Service Commission.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
11. Illinois Power Company
[Docket No. ER98-2894-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm and non-firm transmission agreements under which Central
Illinois Light Company will take transmission service pursuant to its
open access transmission tariff. The agreements are based on the Form
of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 15, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
12. Illinois Power Company
[Docket No. ER98-2895-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm and non-firm transmission agreements under which Tenneco
Packaging, Inc., will take transmission service pursuant to its open
access transmission tariff. The agreements are based on the Form of
Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 30, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
13. Illinois Power Company
[Docket No. ER98-2896-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm transmission agreements under which Illinois State
University will take transmission service pursuant to its open access
transmission tariff. The agreements are based on the Form of Service
Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of May 1, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
14. Illinois Power Company
[Docket No. ER98-2897-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm transmission agreements under which Caterpillar, Inc., will
take transmission service pursuant to its open access transmission
tariff. The agreements are
[[Page 27068]]
based on the Form of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 23, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
15. Illinois Power Company
[Docket No. ER98-2898-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm transmission agreements under which Granite City Steel
Corporation will take transmission service pursuant to its open access
transmission tariff. The agreements are based on the Form of Service
Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 22, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
16. Illinois Power Company
[Docket No. ER98-2902-000]
Take notice that on May 4, Illinois Power Company (Illinois Power),
500 South 27th Street, Decatur, Illinois 62526, tendered for filing
non-firm transmission agreements under which AYP Energy, Inc., will
take transmission service pursuant to its open access transmission
tariff. The agreements are based on the Form of Service Agreement in
Illinois Power's tariff.
Illinois Power has requested an effective date of April 27, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
17. Illinois Power Company
[Docket No. ER98-2903-000]
Take notice that on May 4, 1998, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing a Power Sales Tariff, Service Agreement under which Old Dominion
Electric Cooperative will take service under Illinois Power Company's
Power Sales Tariff. The agreements are based on the Form of Service
Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 15, 1998.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
18. New York State Electric & Gas Corporation
[Docket No. ER98-2904-000]
Take notice that on May 4, 1998, New York State Electric & Gas
Corporation (NYSEG), filed Service Agreements between NYSEG and AYP
Energy, Inc., (Customer). These Service Agreements specify that the
Customer has agreed to the rates, terms and conditions of the NYSEG
open access transmission tariff filed and effective on June 11, 1997,
in Docket No. OA97-571-000.
NYSEG requests waiver of the Commission's sixty-day notice
requirements and an effective date of May 4, 1998, for the AYP Energy,
Inc., Service Agreements. NYSEG has served copies of the filing on The
New York State Public Service Commission and on the Customer.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
19. Wisconsin Public Service Corporation
[Docket No. ER98-2905-000]
Take notice that on May 4, 1998, Wisconsin Public Service
Corporation (WPSC), tendered for filing an executed Short Term Firm
Transmission Service Agreement between WPSC and Wisconsin Public Power
Inc., providing for transmission service under the Open Access
Transmission Service Tariff, FERC Original Volume No. 11.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
20. Wisconsin Public Service Corporation
[Docket No. ER98-2906-000]
Take notice that on May 4, 1998, Wisconsin Public Service
Corporation (WPSC), tendered for filing an executed Transmission
Service Agreement between WPSC and Wisconsin Public Power Inc.,
provides for transmission service under the Open Access Transmission
Service Tariff, FERC Original Volume No. 11.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
21. Western Resources, Inc.
[Docket No. ER98-2907-000]
Take notice that on May 4, 1998, Western Resources, Inc., (Western
Resources), on its behalf and on behalf of Kansas Gas and Electric
Company (KGE), tendered for filing revised exhibits and service
schedules to the Electric Power, Transmission and Service contracts
between Western Resources and Kansas Electric Power Cooperative, Inc.
(KEPCo), and between KGE and KEPCo. Western Resources states that these
revisions more closely align KEPCo's transmission and ancillary service
schedules with Western Resources' open-access tariff for such services.
Copies of the filing were served upon Kansas Electric Power
Cooperative, Inc., and the Kansas Corporation Commission.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
22. Rochester Gas and Electric Corporation
[Docket No. ER98-2909-000]
Take notice that on May 4, 1998, Rochester Gas and Electric
Corporation (RG&E), filed a Market Based Service Agreement between RG&E
and Federal Energy Sales, Inc., (Customer). This Service Agreement
specifies that the Customer has agreed to the rates, terms and
conditions of RG&E's FERC Electric Rate Schedule, Original Volume No. 3
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-
3553-000, et al. (80 FERC para. 61,284).
RG&E requests waiver of the Commission's sixty (60) day notice
requirements and an effective date of April 29th, Federal Energy Sales,
Inc., Service Agreement. RG&E has served copies of the filing on the
New York State Public Service Commission and on the Customer.
Comment date: May 22, 1998, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of these filings are on file with
the Commission and are available for public inspection.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-12932 Filed 5-14-98; 8:45 am]
BILLING CODE 6717-01-P