2017-09470. Approval and Promulgation of Implementation Plans; Oklahoma; Revisions to Minor New Source Review Permitting Program  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is approving severable portions of revisions to the Oklahoma New Source Review (NSR) State Implementation Plan (SIP) submitted by the State of Oklahoma on February 14, 2002 (the February 14, 2002, SIP submittal). This action addresses revisions to the Oklahoma Administrative Code (OAC), Title 252, Chapters 4 and 100, concerning the State's Minor New Source Review air permitting program.

    DATES:

    This rule is effective on June 14, 2017.

    ADDRESSES:

    The EPA has established a docket for this action under Docket ID No. EPA-R06-OAR-2007-0989. All Start Printed Page 22282documents in the docket are listed on the http://www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through http://www.regulations.gov or in hard copy at the EPA Region 6, 1445 Ross Avenue, Suite 700, Dallas, Texas 75202-2733.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Rick Barrett, 214-665-7227, barrett.richard@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Throughout this document “we,” “us,” and “our” means the EPA.

    I. Background

    The background for this action is discussed in detail in our November 29, 2016, proposal (81 FR 85907). In that document, we proposed to find that the severable portions of the Minor NSR program requirements in OAC 252:4-1 (General Provisions), OAC 252:4-7 (Environmental Permit Process), Appendix C (Permitting Process Summary), OAC 252:100-5 (Registration, Emission Inventory and Annual Operating Fees), OAC 252:100-7 (Permits for Minor Facilities) and Appendix H (De Minimis Facilities) are approvable as meeting CAA requirements for a Minor NSR program. With the exception of OAC 252:100-7 and Appendix H, the above provisions were previously approved as to Oklahoma's Major NSR program. See 75 FR 72695, November 26, 2010. In this action, the severable Minor NSR provisions provide the necessary procedures and applicable requirements for approvable Minor NSR programs. We did not propose approval of those portions of OAC 252:100-8, Parts 1 and 5 as they apply to Oklahoma's Minor NSR program; the EPA will address the Minor NSR program aspects of them in a separate action. This action is being taken under section 110 of the Act.

    We received one comment on the proposal. The comment and our response to that comment follows below.

    II. Response to Comment

    Comment: One commenter stated that the EPA cannot approve the changes to the Oklahoma minor source NSR program unless the program ensures that no source which causes or contributes to a violation of any NAAQS can obtain a permit.

    Response: We thank the commenter for the comment. We agree that EPA cannot approve a revision to a Minor NSR program SIP that would preclude the permitting authority from preventing the construction or modification of a source whose emissions interfere with the attainment or maintenance of the NAAQS. See 40 CFR 51.160(b). The revisions to Oklahoma's Minor NSR program SIP approved through this action include permitting provisions that require a source to comply with all applicable air pollution rules and prohibit the exceedance of the NAAQS. See OAC 252:100-7-15. EPA's review of the proposed revisions to the Oklahoma Minor NSR program, in accordance with section 110(l) of the CAA, forms the basis for demonstrating noninterference with applicable requirements concerning attainment of the NAAQS and other applicable requirements of the CAA. See the section 110(l) analysis in our proposed approval for this action (81 FR 85907, 85911, November 29, 2016), and in the accompanying Technical Support Document on page 26.

    III. Final Action

    We are approving the severable portions of revisions to the Oklahoma SIP as proposed in our November 29, 2016 proposal (81 FR 85907). This includes portions of the February 14, 2002, SIP submittal from the State of Oklahoma. Many of these revisions are administrative in nature and modify redundant or incorrect text within the SIP. The revisions also include renumbered or codified portions of the SIP and new sections that incorporate Federal rules. We approve the revisions to the SIP that meet CAA requirements. Specifically, we are approving the severable portions of revisions to the Oklahoma Minor NSR SIP identified in Table 1 below. As discussed above, many of these provisions were previously approved as part of Oklahoma's Major NSR program. See 75 FR 72695 (November 26, 2010).

    Table 1—Revisions to the Oklahoma SIP for Approval

    SectionTitleEffective dateSubmittal date
    Chapter 4 (OAC 252:4). Rules of Practice and Procedure
    Subchapter 1. General Provisions
    OAC 252:4-1-1Purpose and AuthorityJune 11, 2001February 14, 2002.
    OAC 252:4-1-2DefinitionsJune 11, 2001February 14, 2002.
    OAC 252:4-1-3OrganizationJune 11, 2001February 14, 2002.
    OAC 252:4-1-4Office hours and locations; communicationsJune 11, 2001February 14, 2002.
    OAC 252:4-1-5, except (a) 2nd sentence, which EPA will address in a separate actionGeneral Provisions, Availability of a recordJune 11, 2001February 14, 2002.
    OAC 252:4-1-6Administrative feesJune 11, 2001February 14, 2002.
    OAC 252:4-1-7Fee credits for regulatory feesJune 11, 2001February 14, 2002.
    OAC 252:4-1-8Board and CouncilsJune 11, 2001February 14, 2002.
    OAC 252:4-1-9SeverabilityJune 11, 2001February 14, 2002.
    Subchapter 7. Environmental Permit Process
    OAC 252:4-7-1AuthorityJune 11, 2001February 14, 2002.
    OAC 252: 4-7-2, except 2nd sentence, which EPA will address in a separate actionPreambleJune 11, 2001February 14, 2002.
    OAC 252: 4-7-3ComplianceJune 11, 2001February 14, 2002.
    OAC 252:4-7-4, except (a) 1st sentence, which EPA will address in a separate actionFiling an applicationJune 11, 2001February 14, 2002.
    OAC 252:4-7-5FeesJune 11, 2001February 14, 2002.
    OAC 252: 4-7-6Receipt of ApplicationsJune 11, 2001February 14, 2002.
    Start Printed Page 22283
    OAC 252:4-7-7Administrative completeness reviewJune 11, 2001February 14, 2002.
    OAC 252:4-7-8Technical reviewJune 11, 2001February 14, 2002.
    OAC 252:4-7-9When review times stopsJune 11, 2001February 14, 2002.
    OAC 252:4-7-10Supplemental timeJune 11, 2001February 14, 2002.
    OAC 252:4-7-11ExtensionsJune 11, 2001February 14, 2002.
    OAC 252:4-7-12Failure to meet deadlineJune 11, 2001February 14, 2002.
    OAC 252:4-7-13, except (a), which EPA will address in a separate actionNoticesJune 11, 2001February 14, 2002.
    OAC 252:4-7-14Withdrawing applicationsJune 11, 2001February 14, 2002.
    OAC 252:4-7-15Permit issuance or denialJune 11, 2001February 14, 2002.
    OAC 252:4-7-17Permit decision-making authorityJune 11, 2001February 14, 2002.
    OAC 252:4-7-18Pre-issuance permit review and correctionJune 11, 2001February 14, 2002.
    OAC 252:4-7-19Consolidation of permitting processJune 11, 2001February 14, 2002.
    Part 3. Air Quality Division Tiers and Timelines
    OAC 252:4-7-31Air quality time linesJune 11, 2001February 14, 2002.
    OAC 252: 4-7-32, except (a) and (c)(1), which EPA will address in a separate actionAir quality applications—Tier IJune 11, 2001February 14, 2002.
    Appendices for OAC 252: Chapter 4
    OAC 252: 4. Appendix C, except the Tier I column, which EPA will address in a separate actionPermitting process summaryJune 11, 2001February 14, 2002.
    Chapter 100 (OAC 252:100) Air Pollution Control
    Subchapter 5. Registration, Emission Inventory and Annual Operating Fees
    OAC 252: 100-5-1PurposeJune 11, 2001February 14, 2002.
    OAC 252: 100-5-1.1DefinitionsJune 15, 2007July 16, 2010.
    OAC 252: 100-5-2Registration of potential sources of air contaminantsJune 11, 2001February 14, 2002.
    OAC 252: 100-5-2.1Emission inventoryJune 15, 2007July 16, 2010.
    OAC 252: 100-5-2.2Annual operating feesJune 11, 2001February 14, 2002.
    OAC 252: 100-5-3Confidentiality of proprietary informationJune 11, 2001February 14, 2002.
    Subchapter 7. Permits for Minor Facilities
    Part 1. General Provisions
    OAC 252: 100-7-1PurposeJune 25, 1998February 14, 2002.
    OAC 252: 100-7-1.1DefinitionsJune 11, 1999February 14, 2002.
    OAC 252: 100-7-2, except (a) 2nd sentence, which EPA will address in a separate actionRequirement for permits for minor facilitiesJune 1, 2001February 14, 2002.
    Part 3. Construction Permits
    OAC 252: 100-7-15Construction permitJune 11, 1999February 14, 200.2
    Part 4. Operating Permits
    OAC 252: 100-7-17Relocation permits for portable sourcesJune 25, 1998February 14, 2002.
    OAC 252: 100-7-18Operating permitJune 11, 1999February 14, 2002.
    Part 9. Permits by Rule
    OAC 252: 100-7-60Permit by ruleJune 11, 1999February 14, 2002.
    OAC 252: 100-7-60.1Cotton ginsJune 11, 1999February 14, 2002.
    OAC 252: 100-7-60.2Grain elevatorsJune 11, 1999February 14, 2002.
    Subchapter 8. Permits for Part 70 Sources
    EPA will address applicability to Minor NSR permitting under OAC 252:100-8 in a separate action.
    OAC 252: 100. Appendix HDE MINIMIS FACILITIESJune 25, 1998February 14, 2002.

    This action is being taken under section 110 of the Act.

    IV. Incorporation by Reference

    In this rule, we are finalizing regulatory text that includes incorporation by reference. In accordance with the requirements of 1 CFR 51.5, we are finalizing the Start Printed Page 22284incorporation by reference of the revisions to the Oklahoma regulations as described in the Final Action section above. We have made, and will continue to make, these documents generally available electronically through www.regulations.gov and/or in hard copy at the EPA Region 6 office.

    V. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
    • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • Does not contain any unfunded mandate or significantly or uniquely affect small governments, described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and
    • Does not provide the EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. The EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by July 14, 2017. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Incorporation by reference
    • Nitrogen dioxide
    • Ozone
    • Particulate matter
    • Reporting and recordkeeping requirements
    • Sulfur oxides
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: April 27, 2017.

    Samuel Coleman,

    Acting Regional Administrator, Region 6.

    End Signature

    40 CFR part 52 is amended as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart LL—Oklahoma

    Start Amendment Part

    2. In § 52.1920(c), the table titled “EPA Approved Oklahoma Regulations” is amended:

    End Amendment Part Start Amendment Part

    a. Under “Regulation 1.4 Air Resources Management Permit Required,” by removing the entries for 1.4.1(d), 1.4.2(e), 1.4.2(h), the center heading for “1.4.3 Operating Permit” and the entries for 1.4.3(a) through 1.4.3(c).

    End Amendment Part Start Amendment Part

    b. By adding in numerical order:

    End Amendment Part Start Amendment Part

    i. An entry under “CHAPTER 4 (OAC 252:4). RULES OF PRACTICE AND PROCEDURE” for 252:4-7-32;

    End Amendment Part Start Amendment Part

    ii. A center heading for under “CHAPTER 100 (OAC 252:100). AIR POLLUTION CONTROL” titled “Subchapter 5. Registration, Emission Inventory and Annual Operating Fees”, followed by entries for 252:100-5-1;

    End Amendment Part Start Amendment Part

    iii. A center heading under “CHAPTER 100 (OAC 252:100). AIR POLLUTION CONTROL” titled “Subchapter 7. Permits for Minor Facilities” immediately after the entry for Section 252:100-5-3, followed by a center heading titled “Part 1. General Provisions”;

    End Amendment Part Start Amendment Part

    iv. Entries for 252:100-7-1 through 252:100-7-2;

    End Amendment Part Start Amendment Part

    v. A center heading titled “Part 3. Construction Permits”;

    End Amendment Part Start Amendment Part

    vi. An entry for 252:100-7-15;

    End Amendment Part Start Amendment Part

    vii. A center heading titled “Part 4. Operating Permits”;

    End Amendment Part Start Amendment Part

    viii. Entries for 252:100-7-17 through 252:100-7-18

    End Amendment Part Start Amendment Part

    ix. A center heading titled “Part 9. Permits by Rule”;

    End Amendment Part Start Amendment Part

    x. Entries for 252:100-7-60 through 252:100-7-60.2; and

    End Amendment Part Start Amendment Part

    xi. An entry for “252:100, Appendix H” immediately after the entry for “252:100, Appendix G.”

    End Amendment Part Start Amendment Part

    c. By revising the entries for 1.4.1(a), 1.4.1(b), 1.4.1(c), 1.4.2(a), 1.4.2(b), 1.4.2(c), 1.4.2(d), 1.4.2(f), 1.4.2(g), the entries for 252:4-1-1 through 252:4-1-9, 252:4-7-1 through 252:4-7-31, 252:4, Appendix C, under “Appendices for OAC 252: Chapter 4”, and 252:100-5-1 through 252:100-5-3.

    End Amendment Part

    The additions and revisions read as follows:

    Identification of plan
    * * * * *

    (c) * * *Start Printed Page 22285

    EPA Approved Oklahoma Regulations

    State citationTitle/subjectState effective dateEPA approval dateExplanation
    OKLAHOMA AIR POLLUTION CONTROL REGULATIONS
    Regulation 1.4. Air Resources Management Permits Required
    Regulation 1.4.1 General Permit Requirements
    1.4.1(a)Scope and purpose1 5/19/19838/25/1983, 48 FR 38635Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.1(b)General requirements6/4/19907/23/1991, 56 FR 33715Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.1(c)Necessity to obtain permit6/4/19907/23/1991, 56 FR 33715Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.2 Construction Permit
    1.4.2(a)Standards required6/4/19907/23/1991, 56 FR 33715Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.2(b)Stack height limitation6/11/19898/20/1990, 55 FR 33905Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.2(c)Permit applications6/4/19907/23/1991, 56 FR 33715Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.2(d)Action on applications1 5/19/19838/25/1983, 48 FR 38635Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.2(f)Construction permit conditions1 5/19/19838/25/1983, 48 FR 38635Applicable to minor NSR permitting under OAC 252:100-8 only.
    1.4.2(g)Cancellation of authority to construct or modify1 2/6/19847/27/1984, 49 FR 30184Applicable to minor NSR permitting under OAC 252:100-8 only.
    Regulation 3.8. Control of Hazardous Air Contaminants
    *         *         *         *         *         *         *
    OKLAHOMA ADMINISTRATIVE CODE, TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY
    CHAPTER 4 (OAC 252:4). RULES OF PRACTICE AND PROCEDURE
    Subchapter 1. General Provisions
    252:4-1-1Purpose and authority6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-1-2Definitions6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-1-3Organization6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-1-4Office location and hours; communications6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    Start Printed Page 22286
    252:4-1-5Availability of a record6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695. NOT in SIP: Subsection (a), second sentence.
    252:4-1-6Administrative fees6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-1-7Fee credits for regulatory fees6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-1-8Board and councils6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-1-9Severability6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    *         *         *         *         *         *         *
    Subchapter 7. Environmental Permit Process
    Part 1. The Process
    252:4-7-1Authority6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-2Preamble6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695. NOT in SIP: second sentence.
    252:4-7-3Compliance6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-4Filing an application6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695. NOT in SIP: Subsection (a), first sentence.
    252:4-7-5Fees6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-6Receipt of applications6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-7Administrative completeness review6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    Start Printed Page 22287
    252:4-7-8Technical review6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-9When review times stop6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-10Supplemental time6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-11Extensions6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-12Failure to meet deadline6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-13Notices6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695. NOT in SIP: Subsection (a). NOT in SIP: Subsection (e) and subsection (f) requirements for permits other than Part 70 permits.
    252:4-7-14Withdrawing applications6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-15Permit issuance or denial6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-16Tier II and III modifications6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-17Permit decision-making authority6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-18Pre-issuance permit review and correction6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-19Consolidation of permitting process6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    Start Printed Page 22288
    Part 3. Air Quality Division Tiers And Time Lines
    252:4-7-31Air quality time lines6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:4-7-32Air quality applications—Tier I6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. NOT in SIP: Subsections (a), (b), (c)(1), (c)(3) and (c)(5).
    *         *         *         *         *         *         *
    Appendices for OAC 252: Chapter 4
    *         *         *         *         *         *         *
    252:4, Appendix CPermitting process summary6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695. NOT in SIP: Tier I column.
    *         *         *         *         *         *         *
    CHAPTER 100 (OAC 252:100). AIR POLLUTION CONTROL
    *         *         *         *         *         *         *
    Subchapter 5. Registration, Emission Inventory and Annual Operating Fees
    252:100-5-1Purpose6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:100-5-1.1Definitions6/15/20075/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 9/28/2016, 81 FR 66535.
    252:100-5-2Registration of potential sources of air contaminants6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:100-5-2.1Emission inventory6/15/20075/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 9/28/2016, 81 FR 66535.
    252:100-5-2.2Annual operating fees6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    252:100-5-3Confidentiality of proprietary information6/11/20015/15/2017, [Insert Federal Register citation]Applicable to minor NSR permitting under OAC 252:100-7. Approved for major NSR permitting 11/26/2010, 75 FR 72695.
    Start Printed Page 22289
    Subchapter 7. Permits for Minor Facilities
    Part 1. General Provisions
    252:100-7-1Purpose6/25/19985/15/2017, [Insert Federal Register citation]
    252:100-7-1.1Definitions6/11/19995/15/2017, [Insert Federal Register citation]
    252:100-7-2Requirement for permits for minor facilities6/1/20015/15/2017, [Insert Federal Register citation]NOT in SIP: Subsection (a), second sentence.
    Part 3. Construction Permits
    252:100-7-15Construction permit6/11/19995/15/2017, [Insert Federal Register citation]
    Part 4. Operating Permits
    252:100-7-17Relocation permits for portable sources6/25/19985/15/2017, [Insert Federal Register citation]
    252:100-7-18Operating permit6/11/19995/15/2017, [Insert Federal Register citation]
    Part 9. Permits by Rule
    252:100-7-60Permit by rule6/11/19995/15/2017, [Insert Federal Register citation]
    252:100n-7-60.1Cotton gins6/11/19995/15/2017, [Insert Federal Register citation]
    252:100-7-60.2Grain elevators6/11/19995/15/2017, [Insert Federal Register citation]
    Subchapter 8. Permits for Part 70 Sources
    *         *         *         *         *         *         *
    Appendices for OAC 252: Chapter 100
    *         *         *         *         *         *         *
    252:100, Appendix GAllowable Particulate Matter Emission Rates for Directly Fired Fuel-Burning Units and Industrial Process7/1/200911/3/2015, 80 FR 67650
    252:100, Appendix HDe minimis Facilities6/25/19985/15/2017, [Insert Federal Register citation]NOT in SIP: “and/or toxic.”
    *         *         *         *         *         *         *
    1 Submitted.
    End Supplemental Information

    [FR Doc. 2017-09470 Filed 5-12-17; 8:45 am]

    BILLING CODE 6560-50-PStart Printed Page 22290

Document Information

Effective Date:
6/14/2017
Published:
05/15/2017
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2017-09470
Dates:
This rule is effective on June 14, 2017.
Pages:
22281-22290 (10 pages)
Docket Numbers:
EPA-R06-OAR-2007-0989, FRL-9960-67-Region 6
Topics:
Air pollution control, Environmental protection, Incorporation by reference, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds
PDF File:
2017-09470.pdf
Supporting Documents:
» OK007.18 OK006.13 Oklahoma Revisions to OAC 252-100-8 (Subchapter 8), Permits for Part 70 Sources, and Appendices I and J, submitted to EPA February 14, 2002 (OK-25). 888 pages 48.4 MB wyp
» OK007.17 Oklahoma Revisions to OAC 252:100-7[8] (Subchapter 7), Permits for Minor Facilities, final adoption March 27, 2001, effective June 1, 2001, submitted to EPA February 14, 2002 (OK-25). 33 pages 1.3 MB m5s wyp
» OK007.16 Oklahoma Revisions to OAC 252:100-7[7] (Subchapter 7), Permits for Minor Facilities, final adoption May 7, 1999, effective June 11, 1999, submitted to EPA February 14, 2002 (OK-25). 169 pages 8.2 MB m5s wyp
» OK007.15 Oklahoma Revisions to OAC 252:100-7[6] (Subchapter 7), Permits and new Appendix H, De Minimis Facilities, final adoption May 21, 1998, effective June 25, 1998, submitted to EPA February 14, 2002 (OK-25). 394 pages 19.7 MB m5s wyp
» OK007.14 Oklahoma Revisions to OAC 252:100-7[5] (Subchpapter 7), Permits, final adoption March 26, 1997, effective June 2, 1997, submitted to EPA February 14, 2002 (OK-25). 106 pages 4.2 MB m5s wyp
» OK007.13 Oklahoma Revisions to OAC 252:100-7[4] (Subchpater 7), Permits, final adoption March 27, 1996, effective July 1, 1996, submitted to EPA February 14, 2002 (OK-25). 164 pages 6.1 MB m5s wyp
» OK007.12 Oklahoma Revisions to OAC 252:100-7[3] (Subchapter 7), Permits, final adoption March 30, 1994, effective May 26, 1994, submitted to EPA February 14, 2002 (OK-25). 664 pages 24.6 MB m5s wyp
» OK007.11 Oklahoma Revisions to OAC 252:100-7[2] (Subchapter 7) Permits, final adoption March 24, 1993, effective June 1, 1993, submitted to EPA February 14, 2002 (OK-25). 177 pages 6.3 MB m5s wyp
» OK007.10 Oklahoma Revisions to OAC 252:100-7[1] (Subchapter 7), Permits, adopted May 6, 1988, submitted to EPA February 14, 2002 (OK-25). 261 pages 8.3 MB m5s wyp
» OK007.09 OK006.12 Oklahoma Revisions to OAC 252:100-5 (Subchpater 5), Registration, Emission Inventory and Annual Operating Fees, submitted to EPA February 14, 2002 (OK-25). 320 pages 15.4 MB wyp
CFR: (1)
40 CFR 52.1920