[Federal Register Volume 61, Number 96 (Thursday, May 16, 1996)]
[Notices]
[Page 24789]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12307]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Notice Application is Ready for Environmental Analysis
May 10, 1996.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Major license.
b. Project No.: 10819-002.
c. Date Filed: June 23, 1994.
d. Applicant: Idaho Water Resource Board.
e. Name of Project: Dworshak Small Hydro.
f. Location: On the existing water conveyance system providing
water from the Corps of Engineers' Dworshak dam to Clearwater Fish
Hatchery and Dworshak National Fish Hatchery, on land owned by the
Corps of Engineers and the Bureau of Land Management within the
boundary of the Nez Perce Indian Reservation. North Fork Clearwater
River, Clearwater County, Idaho. Section 34, Township 37 North, Range 1
East, Boise Meridian.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Ralph Mellin, Idaho Department of Water
Resources, 1301 North Orchard, Boise, ID 83706-2237, (208) 327-7991.
i. FERC Contact: Surender Yepuri, P.E., (202) 219-2839.
j. Deadline Date: See attached paragraph D10.
k. Status of Environmental Analysis: The application is ready for
environmental analysis at this time--see attached paragraph D10.
l. Description of Project: The proposed project would utilize
releases from Dworshak dam that are conveyed by pipelines to the fish
hatcheries and would consist of: (1) connections to the existing 36-
inch and 18-inch water supply lines; (2) a 58.25-foot-long, 25-foot-
wide powerhouse on top of the existing water distribution structure,
containing two generating units with installed capacities of 2.0 and
0.5 megawatts that would discharge flows directly into the distribution
tank; (3) a substation adjacent to the powerhouse; and (4) an
underground 14.4-KV, 1.6-mile-long transmission line connecting to an
existing Clearwater Power Company distribution line.
m. Purpose of Project: Power generated at the project will be sold
to Bonneville Power Administration.
n. This notice also consists of the following standard paragraphs:
A4 and D10.
o. Available Locations of Application: A copy of the application,
as amended and supplemented, is available for inspection and
reproduction at the Commission's Public Reference and Files Maintenance
Branch, located at 888 First Street, NE., Room 2A, Washington, D.C.
20426, or by calling (202) 208-1371. A copy is also available for
inspection and reproduction at the applicant's office (see item (h)
above).
A4. Development Application--Public notice of the filing of the
initial development application, which has already been given,
established the due date for filing competing applications or notices
of intent. Under the Commission's regulations, any competing
development application must be filed in response to and in compliance
with public notice of the initial development application. No competing
applications or notices of intent may be filed in response to this
notice.
D10. Filing and Service of Responsive Documents--The application is
ready for environmental analysis at this time, and the Commission is
requesting comments, reply comments, recommendations, terms and
conditions, and prescriptions.
The Commission directs, pursuant to Section 4.34(b) of the
Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20,
1991) that all comments, recommendations, terms and conditions and
prescriptions concerning the application be filed with the Commission
within 60 days from the issuance date of this notice. All reply
comments must be filed with the Commission within 105 days from the
date of this notice.
Anyone may obtain an extension of time for these deadlines from the
Commission only upon a showing of good cause or extraordinary
circumstances in accordance with 18 CFR 385.2008.
All filings must (1) Bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Any of these documents must be
filed by providing the original and the number of copies required by
the Commission's regulations to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, D.C. 20426.
An additional copy must be sent to Director, Division of Project
Review, Office of Hydropower Licensing, Federal Energy Regulatory
Commission, at the above address. Each filing must be accompanied by
proof of service on all persons listed on the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b),
and 385.2010.
Lois D. Cashell,
Secretary.
[FR Doc. 96-12307 Filed 5-15-96; 8:45 am]