05-9682. Union Pacific Railroad Company-Temporary Trackage Rights Exemption-BNSF Railway Company  

  • Start Preamble

    BNSF Railway Company (BNSF), pursuant to a written trackage rights agreement entered into between BNSF and Union Pacific Railroad Company (UP), has agreed to grant temporary overhead trackage rights to UP over BNSF's line of railroad between BNSF milepost 141.7, near Rockview, MO, and BNSF milepost 479.4, near Hulbert, AR (via Marion, AR), a distance of approximately 158.4 miles.[1]

    The transaction was scheduled to be consummated on May 8, 2005, and the temporary trackage rights will expire on or about July 23, 2005. The purpose of the temporary trackage rights is to facilitate maintenance work on UP lines.

    As a condition to this exemption, any employees affected by the acquisition of the temporary trackage rights will be protected by the conditions imposed in Norfolk and Western Ry. Co.—Trackage Rights—BN, 354 I.C.C. 605 (1978), as modified in Mendocino Coast Ry., Inc.—Lease and Operate, 360 I.C.C. 653 (1980), and any employee affected by the discontinuance of those trackage rights will be protected by the conditions set out in Oregon Short Line R. Co.—Abandonment—Goshen, 360 I.C.C. 91 (1979).

    This notice is filed under 49 CFR 1180.2(d)(8). If it contains false or misleading information, the exemption is void ab initio. Petitions to revoke the exemption under 49 U.S.C. 10502(d) may be filed at any time. The filing of a petition to revoke will not automatically stay the transaction.

    An original and 10 copies of all pleadings, referring to STB Finance Docket No. 34696, must be filed with the Surface Transportation Board, 1925 K Street, NW., Washington, DC 20423-0001. In addition, a copy of each pleading must be served on Robert T. Opal, General Commerce Counsel, 1400 Douglas Street, STOP 1580, Omaha, NE 68179.

    Board decisions and notices are available on our Web site at http://www.stb.dot.gov.”

    Start Signature

    Decided: May 9, 2005.

    By the Board, David M. Konschnik, Director, Office of Proceedings.

    Vernon A. Williams,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  The trackage rights involve BNSF segments with non-contiguous mileposts. Therefore, total mileage does not correspond to the milepost designations of the endpoints.

    Back to Citation

    [FR Doc. 05-9682 Filed 5-16-05; 8:45 am]

    BILLING CODE 4915-01-P

Document Information

Published:
05/17/2005
Department:
Surface Transportation Board
Entry Type:
Notice
Document Number:
05-9682
Pages:
28355-28355 (1 pages)
Docket Numbers:
STB Finance Docket No. 34696
PDF File:
05-9682.pdf