2010-11185. Airworthiness Directives; McDonnell Douglas Corporation Model DC-9-30, DC-9-40, and DC-9-50 Series Airplanes
-
Start Preamble
AGENCY:
Federal Aviation Administration (FAA), DOT.
ACTION:
Final rule.
SUMMARY:
We are adopting a new airworthiness directive (AD) for certain Model DC-9-30, DC-9-40, and DC-9-50 series airplanes. This AD requires inspecting to determine the part numbers of the forward and aft auxiliary tank fuel boost and transfer pump conduit/conduit assembly and conduit assembly electrical connector, as applicable, and corrective actions if necessary. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to detect and correct the potential for an arc/spark condition to occur within the fuel boost or transfer pump conduit assembly connectors and propagate into the forward and aft auxiliary fuel tanks, which could result in a fire or explosion.
DATES:
This AD is effective June 21, 2010.
The Director of the Federal Register approved the incorporation by reference of a certain publication listed in the AD as of June 21, 2010.
ADDRESSES:
For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, 3855 Lakewood Boulevard, MC D800-0019, Long Beach, California 90846-0001; telephone 206-544-5000, extension 2; fax 206-766-5683; e-mail dse.boecom@boeing.com; Internet https://www.myboeingfleet.com.
Examining the AD Docket
You may examine the AD docket on the Internet at http://www.regulations.gov;; or in person at the Docket Management Facility between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this AD, the regulatory evaluation, any comments received, and other information. The address for the Docket Office (telephone 800-647-5527) is the Document Management Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
William Bond, Aerospace Engineer, Propulsion Branch, ANM-140L, FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California 90712-4137; telephone (562) 627-5253; fax (562) 627-5210.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an airworthiness directive (AD) that would apply to certain Model DC-9-30, DC-9-40, and DC-9-50 series airplanes. That NPRM was published in the Federal Register on August 12, 2009 (74 FR 40525). That NPRM proposed to require inspecting to determine the part numbers of the forward and aft auxiliary tank fuel boost and transfer pump conduit/conduit Start Printed Page 27402assembly and conduit assembly electrical connector, as applicable, and corrective actions if necessary.
Comments
We gave the public the opportunity to participate in developing this AD. We considered the comment received from the commenter. Northwest Airlines (NWA) concurs with the intent of the NPRM.
Request To Delay Issuance of the Final Rule Until the Revised Service Bulletin Is Issued, Reviewed, and Commented On by Operators
NWA states that operators should have the opportunity to review and comment on the revised service bulletin prior to any final rule decision. NWA explains that there are omissions regarding airplane effectivity and part number discrepancies in Boeing Service Bulletin DC9-28-227, dated April 23, 2009. NWA notes that Boeing was notified of these issues, and that Boeing concurs with the effectivity problems and noted the differences in the associated wiring diagrams and drawings that affect the part numbers. NWA asserts that Boeing has acknowledged that Boeing Service Bulletin DC9-28-227, dated April 23, 2009, needs to be revised.
NWA believes that certain airplanes were delivered with a 780 gallon forward fuselage supplemental tank but without a 780 gallon aft fuselage supplemental tank, and that these airplanes may not be addressed as a group in Boeing Service Bulletin DC9-28-227, dated April 23, 2009.
NWA also believes that certain airplanes identified as Group 1 in Boeing Service Bulletin DC9-28-227, dated April 23, 2009, have the same conduit assembly part number as other airplanes. NWA believes that these airplanes cannot use the same conduit assembly because conduit assemblies have specified wire numbers as per certain drawings.
From these statements, we infer that NWA requests that we delay issuing the AD until Boeing Service Bulletin DC9-28-227, dated April 23, 2009, is revised and released. We do not agree to delay issuing the final rule until a revised service bulletin is reviewed and commented on by operators. The airplanes that NWA believes were delivered with a 780 gallon forward fuselage supplemental tank but without a 780 gallon aft supplemental fuselage tank, and that may not be addressed as a group in Boeing Service Bulletin DC9-28-227, dated April 23, 2009, are not included in the effectivity of that service bulletin because they already had the acceptable conduit assembly installed prior to the time of delivery. Also, Boeing Service Bulletin DC9-28-227, dated April 23, 2009, reflects the correct conduit part numbers installed prior to the time of airplane delivery; therefore, the content in Boeing Service Bulletin DC9-28-227, dated April 23, 2009, is correct. We have confirmed with Boeing that Boeing Service Bulletin DC9-28-227, dated April 23, 2009, does not need to be revised regarding these issues. We have not changed the AD in this regard.
If a new revision to the service information is published, under the provisions of paragraph (h) of the final rule, we will consider requests for alternative methods of compliance (AMOCs) if sufficient data are submitted to substantiate that the change would provide an acceptable level of safety. We have not changed the AD in this regard.
Request for a Clarification Statement Acknowledging Post-Production Removal of Auxiliary Fuel Tank(s)
NWA states that the final rule should include a clarification statement for paragraph (g) of the NPRM that acknowledges post-production removal of an auxiliary fuel tank, which releases the operator from those requirements of Boeing Service Bulletin DC9-28-227, dated April 23, 2009, that are no longer applicable. NWA explains that Boeing Service Bulletin DC9-28-227, dated April 23, 2009, does not address the issue of a removed auxiliary fuel tank and that the equipment effectivity list quantifies airplane groups at the time of production and does not address post-production modifications to the airplane. NWA acknowledges that an auxiliary fuel tank, which was installed at the time of production, may have been removed by operators for a variety of reasons. NWA asserts that the removal of the auxiliary fuel tank and thereby the fuel boost or transfer pump conduit assembly connectors removes the unsafe condition specified in paragraph (e) of the NPRM, although the language specified in paragraph (g) of the NPRM will still require operators to request an AMOC for removed auxiliary fuel tanks.
We agree. If the auxiliary fuel tank(s) has been removed, thereby removing the fuel boost or transfer fuel pump conduit assembly connectors, the unsafe condition is removed as well. We have revised paragraph (g) of the final rule to account for auxiliary fuel tank(s) that have been removed.
Explanation of Change Made to This AD
We have revised this AD to identify the legal name of the manufacturer as published in the most recent type certificate data sheet for the affected airplane models.
Conclusion
We reviewed the relevant data, considered the comment received, and determined that air safety and the public interest require adopting the AD with the changes described previously. We also determined that these changes will not increase the economic burden on any operator or increase the scope of the AD.
Explanation of Change to Costs of Compliance
Since issuance of the NPRM, we have increased the labor rate used in the Costs of Compliance from $80 per work-hour to $85 per work-hour. The Costs of Compliance information, below, reflects this increase in the specified hourly labor rate.
Costs of Compliance
We estimate that this AD affects 137 airplanes of U.S. registry. We also estimate that it takes up to 8 work-hours per product to comply with this AD. The average labor rate is $85 per work-hour. Based on these figures, we estimate the cost of this AD to the U.S. operators to be $93,160, or $680 per product.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. “Subtitle VII: Aviation Programs,” describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in “Subtitle VII, Part A, Subpart III, Section 44701: General requirements.” Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order 13132. This AD will not have a Start Printed Page 27403substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a “significant regulatory action” under Executive Order 12866,
(2) Is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979), and
(3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.
You can find our regulatory evaluation and the estimated costs of compliance in the AD Docket.
Start List of SubjectsList of Subjects in 14 CFR Part 39
- Air transportation
- Aircraft
- Aviation safety
- Incorporation by reference
- Safety
Adoption of the Amendment
Start Amendment PartAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:
End Amendment Part Start PartPART 39—AIRWORTHINESS DIRECTIVES
End Part Start Amendment Part1. The authority citation for part 39 continues to read as follows:
End Amendment Part[Amended]2. The FAA amends § 39.13 by adding the following new AD:
End Amendment Part2010-10-20 McDonnell Douglas Corporation: Amendment 39-16299. Docket No. FAA-2009-0685; Directorate Identifier 2009-NM-113-AD.
Effective Date
(a) This airworthiness directive (AD) is effective June 21, 2010.
Affected ADs
(b) None.
Applicability
(c) This AD applies to McDonnell Douglas Corporation Model DC-9-31, DC-9-32, DC-9-32 (VC-9C), DC-9-32F, DC-9-33F, DC-9-34, DC-9-34F, and DC-9-32F (C-9A, C-9B), DC-9-41, and DC-9-51 airplanes, certificated in any category; as identified in Boeing Service Bulletin DC9-28-227, dated April 23, 2009.
Subject
(d) Air Transport Association (ATA) of America Code 28: Fuel.
Unsafe Condition
(e) This AD results from fuel system reviews conducted by the manufacturer. The Federal Aviation Administration is issuing this AD to detect and correct the potential for an arc/spark condition to occur within the fuel boost or transfer pump conduit assembly connectors and propagate into the forward and aft auxiliary fuel tanks, which could result in a fire or explosion.
Compliance
(f) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Inspection
(g) Within 60 months after the effective date of this AD, inspect to determine the part numbers of the forward and aft auxiliary fuel tank boost and transfer pumps conduit assembly and conduit assembly electrical connector, as applicable, and do applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Service Bulletin DC9-28-227, dated April 23, 2009. Do the applicable corrective actions before further flight. If the auxiliary fuel tank(s) has been removed, thereby removing the fuel boost or transfer fuel pump conduit assembly connectors, the corrective action specified in the Accomplishment Instructions of Boeing Service Bulletin DC9-28-227, dated April 23, 2009, is not required. If the removed auxiliary fuel tank(s) are re-installed, the requirements of paragraph (g) of this AD must be done before further flight.
Alternative Methods of Compliance (AMOCs)
(h)(1) The Manager, Los Angeles Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: William Bond, Aerospace Engineer, Propulsion Branch, ANM-140L, FAA, Los Angeles ACO, 3960 Paramount Boulevard, Lakewood, California 90712-4137; telephone (562) 627-5253; fax (562) 627-5210.
(2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD.
Material Incorporated by Reference
(i) You must use Boeing Service Bulletin DC9-28-227, dated April 23, 2009, to do the actions required by this AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, 3855 Lakewood Boulevard, MC D800-0019, Long Beach, California 90846-0001; telephone 206-544-5000, extension 2; fax 206-766-5683; e-mail dse.boecom@boeing.com; Internet https://www.myboeingfleet.com.
(3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221.
(4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Start SignatureIssued in Renton, Washington, on May 3, 2010.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification Service.
[FR Doc. 2010-11185 Filed 5-14-10; 8:45 am]
BILLING CODE 4910-13-P
Document Information
- Comments Received:
- 0 Comments
- Effective Date:
- 6/21/2010
- Published:
- 05/17/2010
- Department:
- Federal Aviation Administration
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2010-11185
- Dates:
- This AD is effective June 21, 2010.
- Pages:
- 27401-27403 (3 pages)
- Docket Numbers:
- Docket No. FAA-2009-0685, Directorate Identifier 2009-NM-113-AD, Amendment 39-16299, AD 2010-10-20
- RINs:
- 2120-AA64: Airworthiness Directives
- RIN Links:
- https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
- Topics:
- Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
- PDF File:
- 2010-11185.pdf
- CFR: (1)
- 14 CFR 39.13