2016-11597. Southern Nuclear Operating Company, Inc.; Establishment of Atomic Safety and Licensing Board  

  • Start Preamble

    Pursuant to delegation by the Commission, see 37 FR 28,710 (Dec. 29, 1972), and the Commission's regulations, see, e.g., 10 CFR 2.104, 2.105, 2.300, 2.309, 2.313, 2.318, 2.321, notice is hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside over the following proceeding:

    Southern Nuclear Operating Company, Inc. (Vogtle Electric Generating Plant, Units 3 and 4)

    This proceeding involves a challenge to an application by Southern Nuclear Operating Company, Inc. for an amendment to the operating licenses for the Vogtle Electric Generating Plant, Units 3 and 4, located in Burke County, Georgia. In response to a notice of the license amendment application filed in the Federal Register, see 81 FR 10,920 (Mar. 2, 2016), the Blue Ridge Environmental Defense League and its chapter Concerned Citizens of Shell Bluff filed a Petition to Intervene and Request for Hearing on May 2, 2016.

    The Board is comprised of the following Administrative Judges:

    Ronald M. Spritzer, Chairman, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001

    Nicholas G. Trikouros, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001

    Dr. Gary S. Arnold, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001

    All correspondence, documents, and other materials shall be filed in accordance with the NRC E-Filing rule. See 10 CFR 2.302.

    Start Signature

    Rockville, Maryland.

    Dated: May 11, 2016.

    E. Roy Hawkens,

    Chief Administrative Judge, Atomic Safety and Licensing Board Panel.

    End Signature End Preamble

    [FR Doc. 2016-11597 Filed 5-16-16; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
05/17/2016
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
2016-11597
Pages:
30571-30571 (1 pages)
Docket Numbers:
Docket Nos. 52-025-LA-2 and 52-026-LA-2, ASLBP No. 16-946-02-LA-BD01
PDF File:
2016-11597.pdf
Supporting Documents:
» Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
» Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Main Control Room Emergency Habitability System Changes
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; PXS/ADS Line Resistance Changes
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Pipe Rupture Hazard and Flooding Analysis
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Station, Units 3 and 4; Addition of a Residual Heat Removal Suction Relief Valve for Low-Temperature Overpressure Protection; Exemption and Combined License Amendment; Issuance
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Clarification of Raceway and Raceway System Designations; Issuance of Exemption and Combined License Amendment
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Central Chilled Water System Optimization Changes; Issuance of Exemption and Combined License Amendment
» Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria; Determination of Successful Completion of Inspections, Tests, and Analyses