95-12190. NorAm Gas Transmission Co.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 96 (Thursday, May 18, 1995)]
    [Notices]
    [Page 26725]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-12190]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-491-000]
    
    
    NorAm Gas Transmission Co.; Notice of Request Under Blanket 
    Authorization
    
    May 12, 1995.
        Take notice that on May 9, 1995, NorAm Gas Transmission Company 
    (NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No 
    CP95-491-000, a request pursuant to Sections 157.205 and 157.216 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.216) for authorization to abandon and remove an above-ground 2-inch 
    meter station on Line AM-52, Upshur County, Texas, under the blanket 
    certificate issued in Docket Nos. CP82-384-000 and CP82-384-001, 
    pursuant to Section 7(b) of the Natural Gas Act, all as more fully set 
    forth in the request which is on file with the Commission and open to 
    public inspection.
        NGT states that it proposes to abandon and remove the 2-inch meter 
    that provides service to one residential farm tap, a customer of Arkla, 
    a division of NorAm Energy Corp. (Arkla). Arkla has consented in 
    writing to the removal of the 2-inch meter. NGT indicates that the 
    estimated cost to remove the meter is $365 and the funds would be 
    generated internally. NGT says that no customers or service will be 
    abandoned. NGT states that it will continue to operate an existing 2-
    inch regulator to serve that customer, but Arkla will install its own 
    meter to measure the gas delivered. The volumes to be delivered through 
    the tap will be approximately 1 MMBtu on a peak day and 85 MMBtu 
    annually.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-12190 Filed 5-17-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
05/18/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-12190
Pages:
26725-26725 (1 pages)
Docket Numbers:
Docket No. CP95-491-000
PDF File:
95-12190.pdf