95-12190. NorAm Gas Transmission Co.; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 96 (Thursday, May 18, 1995)]
[Notices]
[Page 26725]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-12190]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-491-000]
NorAm Gas Transmission Co.; Notice of Request Under Blanket
Authorization
May 12, 1995.
Take notice that on May 9, 1995, NorAm Gas Transmission Company
(NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No
CP95-491-000, a request pursuant to Sections 157.205 and 157.216 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.216) for authorization to abandon and remove an above-ground 2-inch
meter station on Line AM-52, Upshur County, Texas, under the blanket
certificate issued in Docket Nos. CP82-384-000 and CP82-384-001,
pursuant to Section 7(b) of the Natural Gas Act, all as more fully set
forth in the request which is on file with the Commission and open to
public inspection.
NGT states that it proposes to abandon and remove the 2-inch meter
that provides service to one residential farm tap, a customer of Arkla,
a division of NorAm Energy Corp. (Arkla). Arkla has consented in
writing to the removal of the 2-inch meter. NGT indicates that the
estimated cost to remove the meter is $365 and the funds would be
generated internally. NGT says that no customers or service will be
abandoned. NGT states that it will continue to operate an existing 2-
inch regulator to serve that customer, but Arkla will install its own
meter to measure the gas delivered. The volumes to be delivered through
the tap will be approximately 1 MMBtu on a peak day and 85 MMBtu
annually.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-12190 Filed 5-17-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 05/18/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-12190
- Pages:
- 26725-26725 (1 pages)
- Docket Numbers:
- Docket No. CP95-491-000
- PDF File:
-
95-12190.pdf