E7-9518. Approval and Promulgation of Air Quality Implementation Plans; Maryland; Update to Materials Incorporated by Reference
-
Start Preamble
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule; Notice of administrative change.
SUMMARY:
EPA is updating the materials submitted by Maryland that are incorporated by reference (IBR) into the State implementation plan (SIP). The regulations affected by this update have been previously submitted by the Maryland Department of the Environment (MDE) and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records Administration (NARA), the Air and Radiation Docket and Information Center located at EPA Headquarters in Washington, DC, and the Regional Office.
EFFECTIVE DATE:
This action is effective May 18, 2007.
ADDRESSES:
SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and Radiation Docket and Information Center, EPA Headquarters Library, Room Number 3334, EPA West Building, 1301 Constitution Ave., NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566-1742; or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Harold A. Frankford, (215) 814-2108 or by e-mail at frankford.harold@epa.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The SIP is a living document which the State revises as necessary to address the unique air pollution problems. Therefore, EPA from time to time must take action on SIP revisions containing new and/or revised regulations to make them part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference Federally-approved SIPs, as a result of consultations between EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and “Identification of plan” format are discussed in further detail in the May 22, 1997 Federal Register document. On November 29, 2004 (69 FR 69304), EPA published a document in the Federal Register beginning the new IBR procedure for Maryland. On February 2, 2006 (72 FR 5607), EPA published an update to the IBR material for Maryland. In this document, EPA is doing the following:
1. Announcing the update to the IBR material as of March 15, 2007.
2. Making corrections to the following entries listed in the paragraph 52.1070(c) chart, as described below:
a. COMAR 26.11.01.04—revising the text in the “Additional explanation/citation at 40 CFR § 52.1100” column by adding the SIP effective date.
b. COMAR 26.11.09.01—revising the text in the “Additional explanation/citation at 40 CFR § 52.1100” column by correcting the COMAR citation.
c. Technical Memorandum (TM) 91-01—This entry is revised to reflect EPA's approval of revisions to this TM Start Printed Page 27958document on September 7, 2001 (66 FR 46727).
3. Making corrections to the following entries listed in the paragraph 52.1070(d) chart, as described below:
a. Entry for Potomac Electric Power Company (PEPCO)—Chalk Point—amending the Federal Register citation for EPA's approval action.
b. Entry for Kaydon Ring and Seal, Inc.—revising the text in the “Additional explanation” column by removing the SIP effective date.
4. Making a correction to the paragraph 52.1070(e) chart by adding an entry for the Mobile budgets associated with the 2005 Rate of Progress plan for the Metropolitan Baltimore (1-hour) Ozone Nonattaiment Area. The revised entry adds a date and Federal Register citation, inadvertently omitted in the November 29, 2004 and February 2, 2006 Federal Register documents, on which EPA approved revisions to these mobile budgets.
EPA has determined that today's rule falls under the “good cause” exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation, and section 553(d)(3) which allows an agency to make a rule effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). Today's rule simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs. Under section 553 of the APA, an agency may find good cause where procedures are “impractical, unnecessary, or contrary to the public interest.” Public comment is “unnecessary and contrary to the public interest” since the codification only reflects existing law. Immediate notice in the CFR benefits the public by removing outdated citations and incorrect chart entries.
Statutory and Executive Order Reviews
A. General Requirements
Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a “significant regulatory action” and therefore is not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001). This action merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this rule approves pre-existing requirements under state law and does not impose any additional enforceable duty beyond that required by state law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4). This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a state rule implementing a Federal standard, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act. This rule also is not subject to Executive Order 13045 “Protection of Children from Environmental Health Risks and Safety Risks” (62 FR 19885, April 23, 1997), because it approves a state rule implementing a Federal standard. In reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
B. Submission to Congress and the Comptroller General
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This rule is not a “major rule” as defined by 5 U.S.C. 804(2).
C. Petitions for Judicial Review
EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Maryland SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for this “Identification of plan” reorganization update action for Maryland.
Start List of SubjectsList of Subjects in 40 CFR Part 52
- Environmental protection
- Air pollution control
- Carbon monoxide
- Incorporation by reference
- Intergovernmental relations
- Lead
- Nitrogen dioxide
- Ozone
- Particulate matter
- Reporting and recordkeeping requirements
- Sulfur oxides
- Volatile organic compounds
Dated: April 27, 2007.
Donald S. Welsh,
Regional Administrator, Region III.
40 CFR part 52 is amended as follows:
End Amendment Part Start PartPART 52—[AMENDED]
End Part Start Amendment Part1. The authority for citation for part 52 continues to read as follows:
End Amendment PartSubpart V—Maryland
Start Amendment Part2. Section 52.1070 is amended by revising paragraphs (b), (c), (d), and (e) to read as follows:
End Amendment PartIdentification of plan.* * * * *Start Printed Page 27959(b) Incorporation by reference. (1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after March 15, 2007 will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region III certifies that the rules/regulations provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of March 15, 2007.
(3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street, Philadelphia, PA 19103; the EPA, Air and Radiation Docket and Information Center, Room Number 3334, EPA West Building, 1301Constitution Avenue NW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
(c) EPA approved regulations.
EPA-Approved Regulations in the Maryland SIP
Code of Maryland administrative regulations (COMAR) citation Title/subject State effective date EPA approval date Additional explanation/citation at 40 CFR § 52.1100 26.11.01 General Administrative Provisions 26.11.01.01A., .01B Exceptions: .01B(3), (13), (21) through (23), (25) Definitions 10/10/01 5/28/02, 67 FR 36810 (c)(171); Additional EPA approvals are codified at §§ 52.1100(c)(119), (c)(122), (c)(143), (c)(148), (c)(158), (c)(159), and (c)(164). 26.11.01.01B(53) Definitions—definition of volatile organic compound (VOC) 9/12/05 3/31/06, 71 FR 16239 Definition reflects the version of 40 CFR 51.100(s) in effect as of 12/31/2004. 26.11.01.02 Relationship of Provisions in this Subtitle 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(1). 26.11.01.03 Delineation of Areas 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(1). 26.11.01.04 Testing and Monitoring 6/19/06 1/3/07, 72 FR 18 Paragraph .04C(2) is added. The SIP effective date is 3/6/07. 26.11.01.05 Records and Information 6/30/97, 12/10/01 5/28/02, 67 FR 36810 (c)(172). 26.11.01.05-1 Emission Statements 12/7/92 10/12/94, 59 FR 51517 (c)(109). 26.11.01.06 Circumvention 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(1). 26.11.01.07 Malfunctions and Other Temporary Increases in Emissions 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(1). 26.11.01.08 Determination of Ground Level Concentrations-Acceptable Techniques 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(5). 26.11.01.09 Vapor Pressure of Gasoline 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(5). 26.11.01.10 Continuous Emission Monitoring (CEM) Requirements 7/22/91 2/28/96, 61 FR 7418 (c)(106); TM90-01 was approved as “additional material”, but not IBR'd. 26.11.02 Permits, Approvals, and Registration 26.11.02.01 Definitions 5/8/95 2/27/03, 68 FR 9012 (c)(182); Exceptions: 26.11.02.01B(1), (1-1), (4)-(6), (10), (15), (16), (22), (29)-(33), (37), (39), (42), (46), (49), (50), (54). 26.11.02.02 General Provisions 5/8/95 2/27/03, 68 FR 9012 (c)(182); Exception: .02D. 26.11.02.03 Federally Enforceable Permits to Construct and State Permits to Operate 5/8/95 2/27/03, 68 FR 9012 (c)(182). 26.11.02.04 Duration of Permits 5/8/95 2/27/03, 68 FR 9012 (c)(182); Exception: .04C(2). 26.11.02.05 Violation of Permits and Approvals 5/8/95 2/27/03, 68 FR 9012 (c)(182). 26.11.02.06 Denial of Applications for State Permits and Approvals 5/8/95, 6/16/97 2/27/03, 68 FR 9012 (c)(182). 26.11.02.07 Procedures for Denying, Revoking, or Reopening and Revising a Permit or Approval 5/8/95 2/27/03, 68 FR 9012 (c)(182). Start Printed Page 27960 26.11.02.08 Late Applications and Delays in Acting on Applications 5/8/95 2/27/03, 68 FR 9012 (c)(182). 26.11.02.09 Sources Subject to Permits to Construct and Approvals 5/8/95, 5/4/98 2/27/03, 68 FR 9012 (c)(182). 26.11.02.10 Sources Exempt from Permits to Construct and Approvals 5/8/95, 6/16/97, 9/22/97, 3/22/99 2/27/03, 68 FR 9012 (c)(182). 26.11.02.11 Procedures for Obtaining Permits to Construct Certain Significant Sources 5/8/95, 6/16/97 2/27/03, 68 FR 9012 (c)(182); Exception: .11C. 26.11.02.12 Procedures for Obtaining Approvals of PSD Sources and NSR Sources, Permits to Construct, Permits to Construct MACT Determinations on a Case-by-Case Basis in Accordance with 40 CFR Part 63, Subpart B, and Certain 100-Ton Sources 5/8/95 2/27/03, 68 FR 9012 (c)(182). 26.11.02.13 Sources subject to State Permits to Operate 5/8/95 2/27/03, 68 FR 9012 (c)(182). 26.11.02.14 Procedures for Obtaining State Permits to Operate and Permits to Construct Certain Sources and Permits to Construct Control Equipment on Existing Sources 5/8/95, 6/16/97 2/27/03, 68 FR 9012 (c)(182). 26.11.04 Ambient Air Quality Standards 26.11.04.02 State-Adopted National Ambient Air Quality Standards 5/8/95 8/20/01, 66 FR 43485 (c)(165). 26.11.04.03 Definitions, Reference Conditions, and Methods of Measurement 2/28/05 6/14/06, 71 FR 34257 26.11.04.04 Particulate Matter 2/28/05 6/14/06, 71 FR 34257 Addition of ambient air quality standard for PM2.5. 26.11.04.05 Sulfur Oxides 2/28/05 6/14/06, 71 FR 34257 26.11.04.06 Carbon Monoxide 1/5/88; recodified 8/1/88 4/7/93, 58 FR 18010 (c)(92). 26.11.04.07 Ozone 2/28/05 6/14/06, 71 FR 34257 Addition of an 8-hour ambient air quality standard for ozone. 26.11.04.08 Nitrogen Dioxide 2/28/05 6/14/06, 71 FR 34257 26.11.04.09 Lead 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(3). 26.11.05 Air Quality Episode System 26.11.05.01 Definitions 6/18/90 4/14/94, 59 FR 17698 (c)(100). 26.11.05.02 General Requirements 6/18/90 4/14/94, 59 FR 17698 (c)(100). 26.11.05.03 Air Pollution Episode Criteria 6/18/90 4/14/94, 59 FR 17698 (c)(100). 26.11.05.04 Standby Emissions Reduction Plan 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(4). 26.11.05.05 Control Requirements and Standby Orders 6/18/90 4/14/94, 59 FR 17698 (c)(100). 26.11.05.06 Tables 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(4). 26.11.06 General Emissions Standards, Prohibitions, and Restrictions 26.11.06.01 Definitions 5/8/91 11/29/94, 59 FR 60908 (c)(102)(i)(B)(14). 26.11.06.02 [Except: .02A(1)(e), (1)(g), (1)(h), (1)(i)] Visible Emissions 11/11/02 8/6/03, 68 FR 46487 (c)(181). 26.11.06.03 Particulate Matter 11/11/02 86/03, 68 FR 46487 (c)(181). Start Printed Page 27961 26.11.06.04 Carbon Monoxide in Areas III and IV 1/5/88; recodified 8/1/88 4/7/93, 58 FR 18010 (c)(92). 26.11.06.05 Sulfur Compounds from Other than Fuel Burning Equipment 11/11/02 8/6/03, 68 FR 46487 (c)(181). 26.11.06.06 Volatile Organic Compounds 9/22/97 5/7/01, 66 FR 22924 (c)(156). Note: On 2/27/03 (68 FR 9012), EPA approved a revised rule citation with a State effective date of 5/8/95 [(c)(182)(i)(C)]. 26.11.06.10 Refuse Burning Prohibited in Certain Installations 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(5). 26.11.06.14 Control of PSD sources 10/10/01 5/28/02, 67 FR 36810 (c)(171). 26.11.06.15 Nitrogen Oxides from Nitric Acid Plants 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(5). 26.11.06.16 Tables 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(5). 26.11.07 Open Fires 26.11.07.01 Definitions 5/22/95 6/11/02, 67 FR 39856 (c)(173). 26.11.07.02 General 5/22/95 2/25/97, 62 FR 8380 (c)(120). 26.11.07.03 Control Officer May Authorize Certain Open Fires 8/11/97 6/11/02, 67 FR 39856 (c)(173). 26.11.07.04 Public Officers May Authorize Certain Fires 5/22/95 2/25/97, 62 FR 8380 (c)(120). 26.11.07.05 Open Fires Allowed Without Authorization of Control Officer or Public Officer 5/22/95 2/25/97, 62 FR 8380 (c)(120), .05A(3) & (4), and .05B(3) are State-enforceable only. 26.11.07.06 Safety Determinations at Federal Facilities 8/11/97 6/11/02, 67 FR 39856 (c)(173). 10.18.08 Control of Incinerators 10.18.08.01 Definitions 3/25/84 7/2/85, 50 FR 27245 (c)(82). 10.18.08.02 Applicability 7/18/80 8/5/81, 46 FR 39818 (c)(45). 10.18.08.03 Prohibition of Certain Incinerators in Areas III and IV 6/8/81 5/11/82, 47 FR 20126 (c)(58). 10.18.08.04 Visible Emissions 3/25/84 7/2/85, 50 FR 27245 (c)(82). 10.18.08.05 Particulate Matter 3/25/84 7/2/85, 50 FR 27245 (c)(82). 10.18.08.06 Prohibition of Unapproved Hazardous Waste Incinerators 3/25/84 7/2/85, 50 FR 27245 (c)(82). 26.11.09 Control of Fuel Burning Equipment and Stationary Internal Combustion Engines, and Certain Fuel-Burning Installations 26.11.09.01 Definitions 9/12/05 6/13/06, 71 FR 34014 Revised definition of “interruptible gas service” in 26.11.09.01B(4). 26.11.09.02 Applicability 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(7). 26.11.09.03 General Conditions for Fuel Burning Equipment 6/21/04 7/6/05, 70 FR 38774 Revised paragraphs 26.11.09.03C(1) and .03C(2). 26.11.09.04 Prohibition of Certain New Fuel Burning Equipment 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(7). 26.11.09.05 Visible Emissions 11/11/02 5/1/03, 68 FR 23206 (c)(183). 26.11.09.06 Control of Particulate Matter 6/21/04 7/6/05, 70 FR 38774 Addition of paragraph 26.11.09.06C. 26.11.09.07 Control of Sulfur Oxides from Fuel Burning Equipment 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(7). 26.11.09.08 Control of NOX Emissions for Major Stationary Sources 11/24/03 9/20/04, 69 FR 56170 (c)(191). 26.11.09.09 Tables and Diagrams 11/11/02 5/1/03, 68 FR 23206 (c)(183); Revised Table 1. Start Printed Page 27962 26.11.10 Control of Iron and Steel Production Installations 26.11.10.01 Definitions 12/25/00 11/7/01, 66 FR 56222 (c)(163). 26.11.10.02 Applicability 11/2/98 9/7/01, 66 FR 46727 (c)(153). 26.11.10.03 Visible Emissions 11/2/98 9/7/01, 66 FR 46727 (c)(153). 26.11.10.04 Control of Particulate Matter 11/2/98 9/7/01, 66 FR 46727 (c)(153). 26.11.10.05 Sulfur Content Limitations for Coke Oven Gas 11/2/98 9/7/01, 66 FR 46727 (c)(153). 26.11.10.06[1] Control of Volatile Organic Compounds from Iron and Steel Production Installations 12/25/00 11/7/01, 66 FR 56222 (c)(163). 26.11.10.06[2] Carbon Monoxide 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(8). 26.11.10.07 Testing and Observation Procedures 12/25/00 11/7/01, 66 FR 56222 (c)(163). 26.11.11 Control of Petroleum Products Installations, Including Asphalt Paving, Asphalt Concrete Plants, and Use of Waste Oils 26.11.11.01 Applicability 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(9). 26.11.11.02 Asphalt Paving 4/26/93 1/6/95, 60 FR 2018 (c)(113)(i)(B)(1). 26.11.11.03 Asphalt Concrete Plants in Areas I, II, V, and VI 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(9). 26.11.11.06 Use of Waste Oils as Fuel 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(9). 26.11.12 Control of Batch Type Hot-Dip Galvanizing Installations 26.11.12.01 Definitions 5/8/95 7/25/00, 64 FR 45743 (c)(149). 26.11.12.02 Applicability 5/8/95 7/25/00, 64 FR 45743 (c)(149). 26.11.12.03 Prohibitions and Exemptions 5/8/95 7/25/00, 64 FR 45743 (c)(149). 26.11.12.04 Visible Emissions 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(10). 26.11.12.05 Particulate Matter 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(10). 26.11.12.06 Reporting Requirements 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(10). 26.11.13 Control of Gasoline and Other Volatile Organic Compound Storage and Handling 26.11.13.01 Definitions 8/11/97 12/22/98, 63 FR 70667 (c)(130). 26.11.13.02 Applicability and Exemption 4/26/93 1/6/95, 60 FR 2018 (c)(113)(i)(B)(3). 26.11.13.03 Large Storage Tanks 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(12). 26.11.13.04 Loading Operations 8/11/97 12/22/98, 63 FR 70667 (c)(132). 26.11.13.05 Gasoline Leaks from Tank Trucks 2/15/93 1/6/95, 60 FR 2018 (c)(112). 26.11.13.06 Plans for Compliance 4/26/93 1/6/95, 60 FR 2018 (c)(113)(i)(B)(5). 26.11.13.07 Control of VOC Emissions from Portable Fuel Containers 1/21/02 6/29/04, 69 FR 38848 (c)(184). 26.11.14 Control of Emissions from Kraft Pulp Mills 26.11.14.01 Definitions 1/8/01, 10/15/01 11/7/01, 66 FR 56220 (c)(170). 26.11.14.02 Applicability 1/8/01 11/7/01, 66 FR 56220 (c)(170). Start Printed Page 27963 26.11.14.06 Control of Volatile Organic Compounds 1/8/01, 10/15/01 11/7/01, 66 FR 56220 (c)(170). 26.11.17 Requirements for Major New Sources and Modifications 26.11.17.01 Definitions 11/24/03 9/20/04, 69 FR 56170 52.1070(c)(191). 26.11.17.02 Applicability 4/26/93, 10/2/00 2/12/01, 66 FR 9766 52.1070(c)(148). 26.11.17.03 General Conditions 4/26/93, 10/2/00 2/12/01, 66 FR 9766 52.1070(c)(191). 26.11.17.04 Baseline for Determining Credit for Emission and Air Quality Offsets 4/26/93, 10/2/00 2/12/01, 66 FR 9766 52.1070(c)(148). 26.11.17.05 Administrative Procedures 4/26/93, 10/2/00 2/12/01, 66 FR 9766 52.1070(c)(148). 26.11.19 Volatile Organic Compounds from Specific Processes 26.11.19.01 Definitions 6/5/95 9/2/97, 62 FR 46199 (c)(126). Note: On 5/13/1998 (63 FR 26462), EPA approved the revised definition of “major stationary source of VOC” with a State effective date of 5/8/1995 [(c)(128)]. 26.11.19.02 Applicability, Determining Compliance, Reporting, and General Requirements 5/4/98, 12/10/01 2/3/03, 68 FR 5228 (c)(174), (c)(175). 1. Limited approval of paragraph .02G (9/4/98, 63 FR 47174) [(c)(131)( (c)(133)]. 2. On 2/27/03 (68 FR 9012), EPA approved a revised rule citation with a State effective date of 5/8/95 [(c)(182)(i)(D)]. 26.11.19.03 Automotive and Light-Duty Truck Coating 9/22/97 11/5/98, 63 FR 59720 (c)(140). 26.11.19.04 Can Coating 8/1/88 11/3/92, 57 FR 49651 (C)(90)(i)(B)(12). 26.11.19.05 Coil Coating 8/1/88 11/3/92, 57 FR 49651 (C)(90)(i)(B)(12). 26.11.19.06 Large Appliance Coating 8/1/88 11/3/92, 57 FR 49651 (C)(90)(i)(B)(12). 26.11.19.07 Paper, Fabric, Vinyl and Other Plastic Parts Coating 8/24/98 1/14/2000, 64 FR 2334 (c)(147). 26.11.19.07-1 Control of VOC Emissions from solid Resin Decorative Surface Manufacturing 6/15/98 6/17/99, 64 FR 32415 (c)(142). 26.11.19.08 Metal Furniture Coating 8/1/88 11/3/92, 57 FR 49651 (C)(90)(i)(B)(12). 26.11.19.09 Control of Volatile Organic Compounds (VOC) Emissions from cold and Vapor Degreasing 6/5/95 8/4/97, 62 FR 41853 (c)(123). 26.11.19.10 Flexographic and Rotogravure Printing 6/5/95 9/2/97, 62 FR 46199 (c)(126). 26.11.19.11 Control of Volatile Organic Compounds (VOC) Emissions from Sheet-Fed and Web Lithographic Printing 6/5/95 9/2/97, 62 FR 46199 (c)(126). 26.11.19.12 Dry Cleaning Installations 9/22/97 9/2/98, 63 FR 46662 (c)(131). 26.11.19.13 Miscellaneous Metal Coating 5/8/91 11/29/94, 59 FR 60908 (c)(102)(i)(B)(6). 26.11.19.13-1 Aerospace Coating Operations 10/2/00, 10/15/01 11/7/01, 66 FR 56220 (c)(169). 26.11.19.13-2 Control of VOC Emissions from Brake Shoe Coating Operations 8/24/98 6/17/99, 64 FR 32415 (c)(142). 26.11.19.13-3 Control of VOC Emissions from Structural Steel Coating Operations 6/29/98 6/17/99, 64 FR 32415 (c)(142). 26.11.19.14 Manufacture of Synthesized Pharmaceutical Products 5/8/91 11/29/94, 59 FR 60908 (c)(102)(i)(B)(14). Start Printed Page 27964 26.11.19.15 Paint, Resin, and Adhesive Manufacturing and Adhesive Application 5/4/98, 3/22/99 10/28/99, 64 FR 57989 (c)(145). 26.11.19.16 Control of VOC Equipment Leaks 8/19/91 9/7/94, 59 FR 46180 (c)(103)(i)(B)(9). 26.11.19.17 Control of Volatile Organic Compounds (VOC) Emissions from Yeast Manufacturing 9/12/05 3/31/06, 71 FR 16237 26.11.19.18 Control of Volatile Organic Compounds (VOC) Emissions from Screen Printing and Digital Imaging 6/10/02 1/15/03, 68 FR 1972 (c)(177). 26.11.19.19 Control of Volatile Organic Compounds (VOC) Emissions from Expandable Polystyrene Operations 10/2/00 5/7/01, 66 FR 22924 (c)(156). 26.11.19.21 Control of Volatile Organic Compounds (VOC) Emissions from Commercial Bakery Ovens 7/3/95 10/15/97, 62 FR 53544 (c)(125)(i)(B)(4). 26.11.19.22 Control of Volatile Organic Compounds (VOC) Emissions from Vinegar Generators 8/11/97 9/23/99, 64 FR 41445 (c)(137). 26.11.19.23 Control of Volatile Organic Compounds (VOC) Emissions from Vehicle Refinishing 5/22/95 8/4/97, 62 FR 41853 (c)(124). 26.11.19.24 Control of Volatile Organic Compounds (VOC) Emissions from Leather Coating Operations 8/11/97 9/23/99, 64 FR 41445 (c)(137). 26.11.19.25 Control of Volatile Organic Compounds from Explosives and Propellant Manufacturing 8/11/97 1/26/99, 64 FR 3852 (c)(141). 26.11.19.26 Control of Volatile Organic Compound Emissions from Reinforced Plastic Manufacturing 8/11/97 8/19/99, 64 FR 45182 (c)(139). 26.11.19.27 Control of Volatile Organic Compounds from Marine Vessel Coating Operations 10/20/97 9/5/01, 66 FR 46379 (c)(166). 26.11.19.28 Control of Volatile Organic Compounds from Bread and Snack Food Drying Operations 10/2/00 5/7/01, 66 FR 22924 (c)(157). 26.11.19.29 Control of Volatile Organic Compounds from Distilled Spirits Facilities 10/2/00, 10/15/01 11/7/01, 66 FR 56220 (c)(160). 26.11.19.30 Control of Volatile Organic Compounds from Organic Chemical Production and Polytetrafluoroethylene Installations 12/10/01, 11/11/02 6/3/03, 68 FR 33000 (c)(176). 26.11.19.31 Control of Volatile Organic Compounds from Medical Device Manufacturing 6/5/06 1/11/07, 72 FR 1289 26.11.20 Mobile Sources 26.11.20.02 Motor Vehicle Emission Control Devices 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i)(B)(13) [as 26.11.20.06]. 26.11.20.03 Motor Vehicle Fuel Specifications 10/26/92 6/10/94, 59 FR 29957 (c)(101)(i)(B)(3). 26.11.20.04 National Low Emission Vehicle Program 3/22/99 12/28/99, 64 FR 72564 (c)(146). 26.11.24 Stage II Vapor Recovery at Gasoline Dispensing Facilities 26.11.24.01 Definitions 4/15/02 5/7/03, 68 FR 24363 (c)(178). 26.11.24.01-1 Incorporation by Reference 4/15/02 5/7/03, 68 FR 24363 (c)(178). 26.11.24.02 Applicability, Exemptions, and Effective Date 4/15/02 5/7/03, 68 FR 24363 (c)(178). 26.11.24.03 General Requirements 4/15/02 5/7/03, 68 FR 24363 (c)(178). Start Printed Page 27965 26.11.24.04 Testing Requirements 02/28/05 5/8/06, 71 FR 26688 26.11.24.05 Inspection Requirements 2/15/93 6/9/94, 59 FR 29730 (c)(107). 26.11.24.06 Training Requirements for Operation and Maintenance of Approved Systems 2/15/93 6/9/94, 59 FR 29730 (c)(107). 26.11.24.07 Record-Keeping and Reporting Requirements 2/28/05 5/8/06, 71 FR 26688 26.11.24.08 Instructional Signs 2/15/93 6/9/94, 59 FR 29730 (c)(107). 26.11.24.09 Sanctions 2/15/93 6/9/94, 59 FR 29730 (c)(107). 26.11.25 Control of Glass Melting Furnaces 26.11.25.01 Definitions 10/5/98 10/19/05, 70 FR 60738 26.11.25.02 Applicability and Exemptions 10/5/98 10/19/05, 70 FR 60738 26.11.25.03 Visible Emissions from Glass Melting Furnaces 10/5/98 10/19/05, 70 FR 60738 26.11.25.04 Particulate Matter Emissions from Glass Melting Furnaces 10/5/98 10/19/05, 70 FR 60738 26.11.26 Conformity 26.11.26.01 Definitions 5/15/95, 6/5/95 12/9/98, 63 FR 67782 (c)(136); definitions of Applicable implementation plan, Governor, State, and State air agency. 26.11.26.03 General Conformity 5/15/95, 6/5/95 12/9/98, 63 FR 67782 (c)(136); current COMAR citation is 26.11.26.04. 26.11.29 NOXReduction and Trading Program 26.11.29.01 Definitions 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.02 Incorporation by Reference 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.03 Scope and Applicability 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.04 General Requirements for Affected Trading Sources 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.05 NOX Allowance Allocations 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.06 Compliance Supplement Pool 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.07 Allowance Banking 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.08 Emission Monitoring 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.09 Requirements for New Sources and Set-Aside Pool 11/24/03 3/22/04, 69 FR 13236 (c)(184)(i)(C)(1)-(5). 26.11.29.10 Reporting 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.11 Record Keeping 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.12 End-of-Season Reconciliation 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.13 Compliance Certification 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.14 Penalties 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.29.15 Requirements for Affected Nontrading Sources 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(1). 26.11.30 Policies and Procedures Relating to Maryland's NOXReduction and Trading Program 26.11.30.01 Scope and Applicability 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). Start Printed Page 27966 26.11.30.02 Definitions 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). 26.11.30.03 Procedures Relating to Compliance Accounts and Overdraft Accounts 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). 26.11.30.04 Procedures Relating to General Accounts 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). 26.11.30.05 Allowance Banking 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). 26.11.30.06 Allowance Transfers 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). 26.11.30.07 Early Reductions 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). 26.11.30.08 Opt-In Procedures 5/1/00 1/10/01, 66 FR 1866 (c)(154)(i)(B)(2). 26.11.30.09 Allocation of Allowances 6/19/06 11/03/06, 71 FR 64647 New column for 2008 allocations. 26.11.32 Control of Emissions of Volatile Organic Compounds from Consumer Products 26.11.32.01 Applicability and Exemptions 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.02 Incorporation by Reference 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.03 Definitions 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.04 Standards(General 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.05 Standards—Requirements for Charcoal Lighter Materials 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.06 Standards—Requirements for Aerosol Adhesives 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.07 Standards—Requirements for Floor Wax Strippers 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.08 Innovative Products—CARB Exemption 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.09 Innovative Products—Department Exemption 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.10 Administrative Requirements 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.11 Reporting Requirements 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.12 Variances 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.13 Test Methods 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.14 Alternative Control Plan (ACP) 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.15 Approval of an ACP Application 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.16 Record Keeping and Availability of Requested Information 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.17 Violations 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.18 Surplus Reductions and Surplus Trading 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.19 Limited-Use Surplus Reduction Credits for Early Reformulations of ACP Products 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.20 Reconciliation of Shortfalls 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.21 Modifications to an ACP 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.22 Cancellation of an ACP 8/18/03 12/9/03, 68 FR 68523 (c)(185). 26.11.32.23 Transfer of an ACP 8/18/03 12/9/03, 68 FR 68523 (c)(185). Start Printed Page 27967 26.11.33 Architectural Coatings 26.11.33.01 Applicability and Exemptions 3/29/04 5/12/05, 70 FR 24979 26.11.33.02 Test Methods—Incorporation by Reference 3/29/04 5/12/05, 70 FR 24979 26.11.33.03 Definitions 3/29/04 5/12/05, 70 FR 24979 26.11.33.04 General Standard—VOC Content Limits 3/29/04 5/12/05, 70 FR 24979 26.11.33.05 VOC Content Limits 3/29/04 5/12/05, 70 FR 24979 26.11.33.06 Most Restrictive VOC Limit 2/28/05 10/19/05, 70 FR 60740 Addition of sections B(15) through B(19). 26.11.33.07 Painting Restrictions 3/29/04 5/12/05, 70 FR 24979 26.11.33.08 Thinning 3/29/04 5/12/05, 70 FR 24979 26.11.33.09 Rust Preventive Coatings 3/29/04 5/12/05, 70 FR 24979 26.11.33.10 Coatings Not Listed in Regulation .05 2/28/05 10/19/05, 70 FR 60740 26.11.33.11 Lacquers 3/29/04 5/12/05, 70 FR 24979 26.11.33.12 Container Labeling Requirements 2/28/05 10/19/05, 70 FR 60740 Deleted section K. 26.11.33.13 Recordkeeping Requirements 2/28/05 10/19/05, 70 FR 60740 26.11.33.14 Compliance Provisions and Test Methods 3/29/04 5/12/05, 70 FR 24979 11.14.08 Vehicle Emissions Inspection Program 11.14.08.01 Title 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.02 Definitions 1/02/95, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.03 Applicability 6/10/02 1/16/03, 68 FR 2208 (c)(179). 11.14.08.04 Exemptions 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.05 Schedule of the Program 1/02/95, 12/16/96 10/29/99, 64 FR 58340 (c)(144). 11.14.08.06 Certificates 6/10/02 1/16/03, 68 FR 2208 (c)(179). 11.14.08.07 Extensions 1/02/95, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.08 Enforcement 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.09 Inspection Standards 6/10/02 1/16/03, 68 FR 2208 (c)(179). 11.14.08.10 General Requirements for Inspection and Preparation for Inspection 1/02/95, 12/16/96, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.11 Idle Exhaust Emissions Test and Equipment Checks 10/18/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.11-1 Transient Exhaust Emissions Test and Evaporative Purge Test Sequence 12/16/96, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.12 Evaporative Integrity Test, Gas Cap Leak Test, and On-Board Diagnostics Interrogation Procedures 6/10/02 1/16/03, 68 FR 2208 (c)(179). 11.14.08.13 Failed Vehicle and Reinspection Procedures 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.14 Dynamometer System Specifications 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.15 Constant Volume Sampler, Analysis System, and Inspector Control Specifications 1/02/95, 10/19/98 10/29/99, 64 FR 58340 (c)(144). Start Printed Page 27968 11.14.08.16 Evaporative Test Equipment, Gas Cap Leak Test Equipment, and on-Board Diagnostics Interrogation Equipment Specifications 6/10/02 1/16/03, 68 FR 2208 (c)(179). 11.14.08.17 Quality Assurance and Maintenance—General Requirements 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.18 Test Assurance Procedures 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.19 Dynamometer Periodic Quality Assurance Checks 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.20 Constant Volume Sampler Periodic Quality Assurance Checks 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.21 Analysis System Periodic Quality Assurance Checks 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.22 Evaporative Test Equipment, Gas Cap Leak Test Equipment and On-board Diagnostics Interrogation Equipment Periodic Quality Assurance Checks 1/02/95, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.23 Overall System Performance quality Assurance 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.24 Control Charts 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.25 Gas Specifications 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.26 Vehicle Emissions Inspection Station 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.27 Technician's Vehicle Report 1/02//95, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.28 Feedback Reports 1/02/95, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.29 Certified Emissions Technicians 1/02/95, 12/16/96 10/29/99, 64 FR 58340 (c)(144). 11.14.08.30 Certified Emissions Repair Facility 1/02/95, 12/16/96 10/29/99, 64 FR 58340 (c)(144). 11.14.08.31 On-Highway Emissions Test 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.32 Fleet Inspection Station 1/02/95, 12/16/96, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 11.14.08.33 Fleet Inspection Standards 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.34 Fleet Inspection and Reinspection Methods 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.35 Fleet Equipment and Quality Assurance Requirements 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.36 Fleet Personnel Requirements 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.37 Fleet Calibration Gas Specifications and Standard Reference Materials 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.38 Fleet Record-Keeping Requirements 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.39 Fleet Fees 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.40 Fleet License Suspension and Revocation 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.41 Audits 1/02/95 10/29/99, 64 FR 58340 (c)(144). 11.14.08.42 Fleet Inspection After 1998 1/02/95, 2/16/96, 10/19/98 10/29/99, 64 FR 58340 (c)(144). 03.03.05 Motor Fuel Inspection [Contingency SIP Measure] 03.03.05.01 Definitions 12/18/95 1/30/96, 61 FR 2982 (c)(101)(i)(B)(4); Approved as a contingency SIP measure as part of the CO Maintenance Plans for Baltimore and DC. [(c)(117) and (c)(118)]. Start Printed Page 27969 03.03.05.01-1 Standard Specifications for Gasoline 12/18/95 1/30/96, 61 FR 2982 03.03.05.02-1 Other Motor Vehicle Fuels 10/26/92 6/10/94, 58 FR 29957 03.03.05.05 Labeling of Pumps 12/18/95 1/30/96, 61 FR 2982 03.03.05.08 Samples and Test Tolerance 10/26/92 6/10/94, 58 FR 29957 03.03.05.15 Commingled Products 10/26/92 6/10/94, 58 FR 29957 03.03.06 Emissions Control Compliance [Contingency SIP Measure] 03.03.06.01 Definitions 12/18/95 1/30/96, 61 FR 2982 (c)(101)(i)(B)(5); Approved as a contingency SIP measure as part of the CO Maintenance Plans for Baltimore and DC. [(c)(117) and (c)(118)]. 03.03.06.02 Vapor Pressure Determination 10/26/92 6/10/94, 58 FR 29957 03.03.06.03 Oxygen Content Determination 12/18/95 1/30/96, 61 FR 2982 03.03.06.04 Registration 10/26/92 6/10/94, 58 FR 29957 03.03.06.05 Recordkeeping 10/26/92 6/10/94, 58 FR 29957 03.03.06.06 Transfer Documentation 12/18/95 1/30/96, 61 FR 2982 TM Technical Memoranda TM81-04 Procedures for Observing and Evaluating Visible Emissions from Stationary Sources 5/1/81 6/18/82, 47 FR 26381 (c)(67). TM83-05 Stack Test Methods for Stationary Sources 6/1/83 2/23/85, 50 FR 7595 (c)(80). TM91-01 [Except Methods 1004A through E] Test Methods and Equipment Specifications for Stationary Sources 11/2/98 9/7/01, 66 FR 46727 (c)(153)(i)(D)(5) (Supplement 3 is added). (d) EPA approved state source-specific requirements.
Name of source Permit No./type State effective date EPA approval date Additional explanation (PEPCO)—Chalk Point Units #1 and #2 #49352 Amended Consent Order 1/27/78 4//2/79, 44 FR 19192 52.1100(c) (22); FRN republished 5/3/79 (44 FR 25840). Beall Jr./Sr. High School Consent Order 1/30/79 3/18/80, 45 FR 17144 52.1100(c)(26). Mt. Saint Mary's College Consent Order 3/8/79 3/18/80, 45 FR 17144 52.1100(c)(26). Potomac Electric Power Company (PEPCO)—Chalk Point Secretarial Order 7/19/79 9/3/80, 45 FR 58340 52.1100(c)(34). Maryland Slag Co Consent Agreement (Order) 10/31/80 9/8/81, 41 FR 44757 52.1100(c)(49). Northeast Maryland Waste Disposal Authority Secretarial Order 11/20/81 7/7/82, 47 FR 29531 52.1100(c)(65) (Wheelabrator-Frye, Inc.). Northeast Maryland Waste Disposal Authority and Wheelabrator-Frye, Inc. and the Mayor and City Council of Baltimore and BEDCO Development Corp Secretarial Order 2/25/83 8/24/83, 45 FR 55179 52.1100(c)(70) (Shutdown of landfill for offsets). Westvaco Corp Consent Order 9/6/83, Rev. 1/26/84 12/20/84, 49 FR 49457 52.1100(c)(74). Potomac Electric Power Company (PEPCO) Administrative Consent Order 9/13/99 12/15/00, 65 FR 78416 52.1100(c)(151). Thomas Manufacturing Corp. Consent Decree 2/15/01 11/15/01, 66 FR 57395 52.1100(c)(167). Start Printed Page 27970 Constellation Power Source Generation, Inc.—Brandon Shores Units #1 & 2; Gould Street Unit #3; H.A. Wagner Units #1, 2, 3 & 4; C.P. Crane Units #1 & 3; and Riverside Unit #4 Consent Order and NOX RACT Averaging Plan Proposal 4/25/01 2/27/02, 67 FR 8897 52.1100(c)(168). Kaydon Ring and Seal, Inc Consent Order 3/5/04 8/31/04, 69 FR 53002 (c)(190); SIP effective date is 11/1/04. Perdue Farms, Inc Consent Order 2/1/05 1/11/07, 72 FR 1291 52.1070(d)(1). (e) EPA-approved nonregulatory and quasi-regulatory material.
Name of non-regulatory SIP revision Applicable geographic area State submittal date EPA approval date Additional explanation Base Year Emissions Inventory Metropolitan Baltimore Ozone Nonattainment Area 1990 9/20/95 10/30/95, 60 FR 55321 52.1075(a) CO. 1990 Base Year Emissions Inventory Metropolitan Washington Ozone Nonattainment Area 3/21/94, 10/12/95 1/30/96, 61 FR 2931 52.1075(b), CO. 1990 Base Year Emissions Inventory All ozone nonattainment areas 3/21/94 9/27/96, 61 FR 50715 52.1075(c), VOC, NOX, CO. 1990 Base Year Emissions Inventory Kent & Queen Anne's Counties 3/21/94 4/23/97, 62 FR 19676 52.1075(d), VOC, NOX, CO. 1990 Base Year Emissions Inventory Metropolitan Washington Ozone Nonattainment Area 3/21/94 4/23/97, 62 FR 19676 52.1075(e), VOC, NOX, CO. 1990 Base Year Emissions Inventory Metropolitan Washington Ozone Nonattainment Area 12/24/97 7/8/98, 63 FR 36854 52.1075(f), VOC, NOX. 1990 Base Year Emissions Inventory Metropolitan Baltimore Ozone Nonattainment Area 12/24/97 2/3/00, 63 FR 5245 52.1075(g), VOC, NOX. 1990 Base Year Emissions Inventory Philadelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County) 12/24/97, 4/29/98, 12/21/99, 12/28/00 2/3/00, 63 FR 5252 9/19/01, 66 FR 44809 52.1075(h), VOC, NOX. 15% Rate of Progress Plan Philadelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County) 7/12/95, #95-20 7/29/97, 62 FR 40457 52.1076(a). Stage II Vapor Recovery Comparability Plan Western Maryland & Eastern Shore Counties 11/5/97 12/9/98, 63 FR 67780 52.1076(b). 15% Rate of Progress Plan Metropolitan Baltimore Ozone Nonattainment Area 10/7/98 2/3/00, 65 FR 5245 52.1076(c). 15% Rate of Progress Plan Metropolitan Washington Ozone Nonattainment Area 5/5/98 7/19/00, 65 FR 44686 52.1076(d). Post-1996 Rate of Progress Plan & contingency measures Philadelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County) 12/24/97, 4/24/98, 8/18/98, 12/21/99, 12/28/00, 3/8/04 2/3/00, 63 FR 5252 9/19/01, 66 FR 44809 4/15/04, 69 FR 19939 52.1076(f). 52.1076(f)(3). Ozone Attainment Plan Philadelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County) 4/29/98, 8/18/98, 12/21/99, 12/28/00, 8/31/01 10/29/01, 66 FR 54578 52.1076(h). 9/2/03 10/27/03, 68 FR 61103 Transportation Conformity Budgets Philadelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County) 4/29/98, 8/18/98, 12/21/99, 12/28/00 10/29/01, 66 FR 54578 52.1076(i). Post-1996 Rate of Progress Plan & contingency measures Metropolitan Baltimore Ozone Nonattainment Area 12/24/97, 4/24/98, 8/18/98, 12/21/99, 12/28/00 9/26/01, 66 FR 49108 52.1076(j). Ozone Attainment Plan Metropolitan Baltimore Ozone Nonattainment Area 4/29/98, 8/18/98, 12/21/99, 12/28/00, 8/31/01 10/30/01, 66 FR 54666 52.1076(k). 9/2/03 10/27/03, 68 FR 61103 52.1076(k). Start Printed Page 27971 Mobile budgets Metropolitan Baltimore Ozone Nonattainment Area 8/31/01 9/2/03 10/30/01, 66 FR 54666 10/27/03, 68 FR 61103 52.1076(l) Mobile budgets (2005) Metropolitan Baltimore Ozone Nonattainment Area Piladelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil County) 9/2/03 10/27/03, 68 FR 61103 52.1076(m). Mobile budgets (2005 Rate of Progress Plan) Metropolitan Baltimore Ozone Nonattainment Area 11/3/03 2/13/04, 69 FR 7133 52.1076(n). Extension for incorporation of the on-board diagnostics (OBD) testing program into the Maryland I/M SIP All ozone nonattainment areas 7/9/02 1/16/03, 68 FR 2208 52.1078(b). Photochemical Assessment Monitoring Stations (PAMS) Program Metropolitan Baltimore and Metropolitan Washington Ozone Nonattainment Areas 3/24/94 9/11/95, 60 FR 47081 52.1080. Consultation with Local Officials (CAA Sections 121 & 127) All nonattainment & PSD areas 10/8/81 4/8/82, 47 FR 15140 52.1100(c)(63). Lead (Pb) SIP City of Baltimore 10/23/80 2/23/82, 47 FR 7835 52.1100(c)(60), (61). TM#90-01-“Continuous Emission Monitoring Policies and Procedures”-October 1990 Statewide 9/18/91 2/28/96, 61 FR 7418 52.1100(c)(106); approved into SIP as “additional material”, but not IBR'd. Carbon Monoxide Maintenance Plan City of Baltimore—Regional Planning District 118 9/20/95 10/31/95, 60 FR 55321 52.1100(c)(117). 7/15/04 04/04/05, 70 FR 16958 Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6. Carbon Monoxide Maintenance Plan Montgomery County Election Districts 4, 7, and 13; Prince Georges County Election Districts 2, 6, 16, 17 and 18 10/12/95 1/30/96 61 FR 2931 52.1100(c)(118). 3/3/04 04/04/05, 70 FR 16958 Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6. Ozone Maintenance Plan Kent and Queen Anne's Counties 2/4/04 10/21/04, 69 FR 61766 52.1100(c)(187); SIP effective date is 11/22/04. 1996-1999 Rate-of-Progress Plan SIP and the Transportation Control Measures (TCMs) in Appendix H Washington DC 1-hour ozone nonattainment area 12/20/97, 5/20/99 5/16/05, 70 FR 25688 Only the TCMs in Appendix H of the 5/20/1999 revision. 1999 motor vehicle emissions budgets of 128.5 tons per day (tpy) of VOC and 196.4 tpy of NOX. 1990 Base Year Inventory Revisions Washington DC 1-hour ozone nonattainment area 9/2/03, 2/24/04 5/16/05, 70 FR 25688 1999-2005 Rate-of-Progress Plan SIP Revision and the Transportation Control Measures (TCMs) in Appendix J Washington DC 1-hour ozone nonattainment area 9/2/03, 2/24/04 5/16/05, 70 FR 25688 Only the TCMs in Appendix J of the 2/24/2004 revision. 2002 motor vehicle emissions budgets (MVEBs) of 125.2 tons per day (tpy) for VOC and 290.3 tpy of NOX, and, 2005 MVEBs of 97.4 tpy for VOC and 234.7 tpy of NOX. Start Printed Page 27972 VMT Offset SIP Revision Washington DC 1-hour ozone nonattainment area 9/2/03, 2/24/04 5/16/05, 70 FR 25688 Contingency Measure Plan Washington, DC Area 9/2/03, 2/24/04 5/16/05, 70 FR 25688 1-hour Ozone Modeled Demonstration of Attainment Washington DC 1-hour ozone nonattainment area 9/2/03, 2/24/04 5/16/05, 70 FR 25688 Attainment Demonstration and Early Action Plan for the Washington County Ozone Early Action Compact Area Washington County 12/20/04, 2/28/05 8/17/05, 70 FR 48283 1-hour Ozone Attainment Plan Washington DC 1-hour ozone nonattainment area 9/2/2003, 2/24/2004 11/16/05, 70 FR 69440 8-hour Ozone Maintenance Plan for the Kent and Queen Anne's Area Kent and Queen Anne's Counties 05/2/06, 05/19/06 12/22/06, 71 FR 76920 [FR Doc. E7-9518 Filed 5-17-07; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Effective Date:
- 5/18/2007
- Published:
- 05/18/2007
- Department:
- Environmental Protection Agency
- Entry Type:
- Rule
- Action:
- Final rule; Notice of administrative change.
- Document Number:
- E7-9518
- Dates:
- This action is effective May 18, 2007.
- Pages:
- 27957-27972 (16 pages)
- Docket Numbers:
- MD201-3117, FRL-8313-2
- Topics:
- Air pollution control, Carbon monoxide, Environmental protection, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds
- PDF File:
- e7-9518.pdf
- CFR: (1)
- 40 CFR 52.1070