[Federal Register Volume 59, Number 96 (Thursday, May 19, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-12242]
[[Page Unknown]]
[Federal Register: May 19, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Office of the Secretary of the Army
Intent To Prepare a Programmatic Draft Environmental Impact
Statement (PDEIS) for the Master Plan Update at United State Army
Intelligence Center and Fort Huachuca, Arizona
AGENCY: Department of Army, DoD
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: United States Army Intelligence Center and Fort Huachuca
provides year-round program development and testing facilities,
administration, and logistical support to both active and reserve
component units from all branches of the armed services. The proposed
master plan formalizes the United States Army Intelligence Center and
For Huachuca's priorities for intelligence development and testing
programs, and developing training ranges, maneuver areas, and
facilities over a twenty year period. This plan will prepare the United
States Army Intelligence Center and Fort Huachuca to enter the 21st
century with the assets required for program development, and to
conduct highly realistic, challenging, and safe training to Army
Training and Evaluation Program (ARTEP) standards.
The installation real property master plan is being updated and
requires a supporting PDEIS for the following reasons:
a. The master plan update identifies major changes in development
for the installation.
b. Several projects identified in the master plan update would
require individual EIS's because they will potentially cause
unavoidable significant impacts to the environment.
c. An EA prepared for the installation ongoing mission developed in
1976 is inadequate and in need of revision to reflect current and
projected activities.
Alternatives
a. No action. Installation ongoing operations, development and
training would continue at current levels.
b. Master plan and component plans would be implemented and current
development and testing and training levels would be maintained.
Construction listed in the master plan would be implemented.
c. Master plan and component plans would be expanded. Development
and testing programs would be expanded. Training would be expanded.
Construction above the level outlined in the master plan would be
implemented to meet total requirements. The installation master plan
for intelligence development and testing programs, and training, will
be evaluated as occurrences under each of the above alternatives.
Lead Agency
United States Army Intelligence Center and Fort Huachuca, AZ.
Scoping
Comments received as a result of this notice will be used to assist
in evaluating the impacts of the master plan on the environment,
social, historical, archaeological and socioeconomic aspects of the
United States Army Intelligence Center and Fort Huachuca and the
surrounding area. A scoping meeting will be held in the vicinity of the
United States Army Intelligence Center and Fort Huachuca within 30 days
of the publication of this NOI.
ADDRESSES: Contact Tom Cochran at (602) 544-3120, or at the following
address: Commander, U.S. Army Garrison, ATTN: ATZS-EHB (Tom Cochran),
Fort Huachuca, AZ 85613-6000.
Dated: May 16, 1994.
Lewis D. Walker,
Deputy Assistant Secretary of the Army (Environment, Safety and
Occupational Health), OASA (I, L&E).
[FR Doc. 94-12242 Filed 5-18-94; 8:45 am]
BILLING CODE 3710-08-M