[Federal Register Volume 62, Number 96 (Monday, May 19, 1997)]
[Notices]
[Page 27245]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-13006]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER97-2744-000]
Tampa Electric Company; Notice of Filing
May 13, 1997.
Take notice that on April 30, 1997, Tampa Electric Company (Tampa
Electric), tendered for filing cost support schedules showing an
updated daily capacity charge for its scheduled/short-term firm
interchange service provided under interchange contracts with Florida
Power Corporation, Florida Power & Light Company, Florida Municipal
Power Agency, Fort Pierce Utilities Authority, Jacksonville Electric
Authority, Kissimmee Utility Authority, Oglethorpe Power Corporation,
Orlando Utilities Commission, Reedy Creek, Improvement District, St.
Cloud Electric Utilities, Seminole Electric Cooperative, Inc.,
Utilities Commission of the City of New Smyrna Beach, Utility Board of
the City of Key West, and the Cities of Gainesville, Homestead, Lake
Worth, Lakeland, Starke, Tallahassee, and Vero Beach, Florida. Tampa
Electric also tendered for filing updated caps on the charges for
emergency and scheduled/short-term firm interchange transactions under
the same contracts.
In addition, Tampa Electric tendered for filing a revised
transmission loss factor, and revised open access transmission service
tariff sheets on which the transmission loss factor is stated.
Tampa Electric requests that the updated daily capacity charge and
caps on charges, and the revised transmission loss factor and tariff
sheets, be made effective as of May 1, 1997, and therefore requests
wavier of the Commission's notice requirement.
Tampa Electric states that a copy of the filing has been served
upon each of the above-named parties to the interchange contracts with
Tampa Electric and each party to a service agreement under Tampa
Electric's open access tariff, as well as the Florida and Georgia
Public Service Commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protest should be filed on or before May 28, 1997. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding.
Any person wishing to become a party must file a motion to
intervene. Copies of this filing are on file with the Commission and
are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-13006 Filed 5-16-97; 8:45 am]
BILLING CODE 6717-01-M