[Federal Register Volume 64, Number 96 (Wednesday, May 19, 1999)]
[Notices]
[Page 27251]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-12567]
[[Page 27251]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Tendered for Filing With the Commission and
Soliciting Additional Study Requests
May 13, 1999.
Take notice the following hydroelectric application has been filed
with the Commission and is available for public inspection:
a. Type of Application: Minor License.
b. Project No.: P-11730-000.
c. Date Filed: April 21, 1999.
d. Applicant: Black River Limited Partnership.
e. Name of Project: Alverno Hydroelectric Project.
f. Location: On the Black River in the Townships of Aloha, Benton,
and Grant, in Cheboygan County, Michigan.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Frank O. Christie, President, Franklin Hydro,
Inc., 8 East Main Street, Malone, New York 12953, (518) 483-1961.
i. FERC Contact: Any questions on this notice should be addressed
to John Costello, E-mail address john.costello@ferc.fed.us (202) 219-
2914.
j. Deadline for filing additional study requests: July 14, 1999.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official serve
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on the resource agency.
k. Status of Environmental Analysis: This application is not ready
for environmental analysis at this time.
l. Description of Project: The constructed project consists of a
360-foot-long earth filled dam with a power plant located on the right
riverbank and a gated spillway near the left bank. The project
impoundment extends approximately 2.5 miles upstream. The powerhouse
contains 2 horizontal turbine/generator sets.
m. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference and Files and Maintenance Branch, located at 888 First
Street, NE, Room 2A-1, Washington, DC 20426, or by calling (202) 208-
2326. A copy is also available for inspection and reproduction at the
Cheboygan Public Library, 107 South Ball Street, Cheboygan, Michigan.
n. With this notice, we are initiating consultation with the
Michigan State Historic Preservation Officer (SHPO), as required by
section 106, National Historic Preservation Act, and the regulations of
the Advisory Council on Historic Preservation, 36 CFR 800.4.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-12567 Filed 5-18-99; 8:45 am]
BILLING CODE 6717-01-M