99-12610. Drawbridge Operating Regulation; Gulf Intracoastal Waterway, TX  

  • [Federal Register Volume 64, Number 96 (Wednesday, May 19, 1999)]
    [Rules and Regulations]
    [Page 27179]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-12610]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD08-99-034]
    
    
    Drawbridge Operating Regulation; Gulf Intracoastal Waterway, TX
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Commander, Eighth Coast Guard District has issued a 
    temporary deviation from the regulation in 33 CFR 117.977 governing the 
    operation of the Pelican Island Causeway bascule drawbridge across the 
    Gulf Intracoastal Waterway, mile 356.1 at Galveston, Galveston County, 
    Texas. This deviation allows the Galveston County Navigation District 
    to maintain the bridge in the closed-to-navigation position from 7 a.m. 
    until 7 p.m. from Monday, May 17, 1999, until Friday, June 4, 1999. 
    Additionally, the bridge may remain in the closed-to-navigation 
    position continuously from 7 a.m. on Thursday, May 20, 1999, until 7 
    p.m. on Sunday, May 23, 1999. At all other times, the bridge will 
    operate normally for the passage of vessels. This temporary deviation 
    is issued to allow for the replacement of the bridge fendering system.
    
    DATES: This deviation is effective from 7 a.m. on Monday, May 17, 1999, 
    until 7 p.m. on Friday, June 4, 1999.
    
    FOR FURTHER INFORMATION CONTACT:
    Mr. David Frank, Bridge Administration Branch, Commander (ob), Eighth 
    Coast Guard District, 501 Magazine Street, New Orleans, Louisiana 
    70130-3396, telephone number 504-589-2965.
    
    SUPPLEMENTARY INFORMATION: Navigation on the waterway consists of tugs 
    with tows, fishing vessels, sailing vessels, and other recreational 
    craft. The Galveston County Navigation District requested a temporary 
    deviation from the normal operation of the bridge in order to 
    accommodate the replacement of the fender system of the bridge. The 
    fender system will be replaced in-kind.
        This deviation allows the draw of the Pelican Island Causeway 
    bascule span drawbridge across the Gulf Intracoastal Waterway, mile 
    356.1 at Galveston, Galveston County, Texas, to remain in the closed-
    to-navigation position from 7 a.m. until 7 p.m. from Monday, May 17, 
    1999, until Friday, June 4, 1999. Additionally, the bridge may remain 
    in the closed-to-navigation position continuously from 7 a.m. on 
    Thursday, May 20, 1999, until 7 p.m. on Sunday, May 23, 1999. At all 
    other times, the bridge will operate normally for the passage of 
    vessels. Presently, the draw opens on signal for the passage of 
    vessels; except that, from 7 a.m. to 8:30 a.m., 12 noon to 1 p.m., and 
    4:15 p.m. to 5:15 p.m. Monday through Friday, except Federal holidays, 
    the draw need not open for the passage of vessels. Public vessels of 
    the United States and vessels in distress shall be passed at any time.
    
        Dated: May 12, 1999.
    A. L. Gerfin, Jr.,
    Captain, U.S. Coast Guard Commander, 8th Coast Guard Dist., Acting.
    [FR Doc. 99-12610 Filed 5-18-99; 8:45 am]
    BILLING CODE 4310-15-M
    
    
    

Document Information

Effective Date:
5/17/1999
Published:
05/19/1999
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
99-12610
Dates:
This deviation is effective from 7 a.m. on Monday, May 17, 1999, until 7 p.m. on Friday, June 4, 1999.
Pages:
27179-27179 (1 pages)
Docket Numbers:
CGD08-99-034
PDF File:
99-12610.pdf
CFR: (1)
33 CFR 117