06-4668. Drawbridge Operation Regulations; Chelsea River, Chelsea, MA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Temporary final rule.

    SUMMARY:

    The Coast Guard has temporarily changed the drawbridge operation regulations that govern the P.J. McArdle Bridge, across the Chelsea River at mile 0.3, between East Boston and Chelsea, Massachusetts. This temporary final rule allows the bridge to remain closed from 9 a.m. to 5 p.m. on June 17, 2006, to facilitate the Third Annual Chelsea River Revel Festival and the running of the Chelsea River Revel 5K Road Race. Vessels that can pass under the bridge without a bridge opening may do so at all times.

    DATES:

    This temporary rule is effective from 9 a.m. to 5 p.m. on June 17, 2006.

    ADDRESSES:

    Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, are part of docket [CGD01-06-024] and are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. John McDonald, Project Officer, First Coast Guard District, (617) 223-8364.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Regulatory Information

    On April 6, 2006, we published a notice of proposed rulemaking (NPRM) entitled “Drawbridge Operation Regulations; Chelsea River, Chelsea, MA”, in the Federal Register (71 FR 17397). We received no comments in response to the notice of proposed rulemaking. No public hearing was requested and none was held.

    Background and Purpose

    The P.J. McArdle Bridge across the Chelsea River at mile 0.3, has a vertical clearance of 21 feet at mean high water and 30 feet at mean low water in the closed position. The existing drawbridge operation regulations listed at 33 CFR 117.593 require the bridge to open on signal at all times.

    On March 6, 2006, the Chelsea Creek Action Group (CCAG) requested a temporary change to the regulation that governs the operation of the P.J. McArdle Bridge. The temporary regulation allows the bridge to remain closed to vessel traffic from 9 a.m. to 5 p.m. on Saturday, June 17, 2006, in the interest of public safety during the Third Annual Chelsea River Revel Festival and 5K Road Race.

    Vessels that can pass under the bridge without a bridge opening may do so at all times.

    Discussion of Comments and Changes

    The Coast Guard received no comments in response to the notice of proposed rulemaking and, as a result, no changes have been made to this temporary final rule.

    Regulatory Evaluation

    This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3), of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Homeland Security (DHS).

    This conclusion is based on the fact that the bridge will only be closed for 8 hours in the interest of public safety during the running of the 5k Road Race on June 17, 2006.

    Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations less than 50,000.

    The Coast Guard certifies under 5 U.S.C. 605(b), that this rule will not have a significant economic impact on a substantial number of small entities.

    This conclusion is based on the fact that the bridge will only be closed for only 8 hours in the interest of public safety during the running of the 5k Road Race on June 17, 2006.

    Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Public Law 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process.

    No small entities requested Coast Guard assistance and none was given.

    Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Start Printed Page 29080Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).

    Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    Taking of Private Property

    This rule will not effect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not concern an environmental risk to health or risk to safety that may disproportionately affect children.

    Indian Tribal Governments

    This final rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    Technical Standards

    The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies. This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    Environment

    We have analyzed this rule under Commandant Instruction M16475.1D, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that there are no factors in this case that would limit the use of a categorical exclusion under section 2.B.2 of the Instruction. Therefore, this rule is categorically excluded, under figure 2-1, paragraph (32)(e), of the Instruction, from further environmental documentation considering that it relates to the promulgation of operating regulations or procedures for drawbridges. Under figure 2-1, paragraph (32)(e), of the instruction, an “Environmental Analysis Check List” and a “Categorical Exclusion Determination” are not required for this rule.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects

    Regulations

    Start Amendment Part

    For the reasons set out in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

    End Amendment Part Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 117 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 499; 33 CFR 1.05-1(g); Department of Homeland Security Delegation No. 0170.1; section 117.255 also issued under the authority of Public Law 102-587, 106 Stat. 5039.

    End Authority Start Amendment Part

    2. On June 17, 2006, from 9 a.m. to 5 p.m., § 117.593 is suspended and a new § 117.T594 is added to read as follows:

    End Amendment Part
    Chelsea River

    (a) All drawbridges across the Chelsea River shall open on signal; except that the P.J. McArdle Bridge, mile 0.3, need not open for the passage of vessel traffic from 9 a.m. to 5 p.m. on June 17, 2006.

    (b) The opening signal for each drawbridge is two prolonged blasts followed by two short blasts and one prolonged blast. The acknowledging signal is three prolonged blasts when the draw can be opened immediately and two prolonged blasts when the draw cannot be opened or is open and must be closed.

    Start Signature

    Dated: May 10, 2006.

    Mark J. Campbell,

    Captain, U.S. Coast Guard, Acting Commander, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 06-4668 Filed 5-18-06; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
6/17/2006
Published:
05/19/2006
Department:
Coast Guard
Entry Type:
Rule
Action:
Temporary final rule.
Document Number:
06-4668
Dates:
This temporary rule is effective from 9 a.m. to 5 p.m. on June 17, 2006.
Pages:
29079-29080 (2 pages)
Docket Numbers:
CGD01-06-024
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
Topics:
Bridges
PDF File:
06-4668.pdf
CFR: (1)
33 CFR 117.T594