[Federal Register Volume 59, Number 83 (Monday, May 2, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-10344]
[[Page Unknown]]
[Federal Register: May 2, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER92-850-005, et al.]
Louis Dreyfus Electric Power, et al.; Electric Rate and Corporate
Regulation Filings
April 21, 1994.
Take notice that the following filings have been made with the
Commission:
1. Louis Dreyfus Electric Power
[Docket No. ER92-850-005]
Take notice that on April 11, 1994, Louis Dreyfus Electric Power
Inc. (Dreyfus) filed certain information as required by the
Commission's December 2, 1992, letter order in this proceeding. 61 FERC
61,303 (1992). Copies of Dreyfus' informational filing are on file
with the Commission and are available for public inspection, with the
exception of certain data which Dreyfus claims is privileged pursuant
to 388.112 of the Commission's regulations.
2. Western Resources, Inc.
[Docket Nos. ER93-523-000 and ER93-533-000]
Take notice that on March 31, 1994, Western Resources, Inc.
tendered for filing a letter and its enclosures on its case in chief on
test year ending December 31, 1994.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
3. Montana Power Co.
[Docket No. ER94-579-000]
Take notice that on April 15, 1994, Montana Power Company tendered
for filing an amendment to its December 29, 1993, filing in the above-
referenced docket.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
4. Pacific Gas and Electric Co.
[Docket No. ER94-941-000]
Take notice that on March 30, 1994, Pacific Gas and Electric
Company (PG&E) tendered a revision to its filing in Docket No. ER94-
941-000, regarding Agreement No. 93-SAO-0018 (Agreement) among PG&E,
the federal Western Area Power Administration (Western) and the U.S.
Department of Energy, San Francisco Operations Office (DOE/SF). The
revised filing is being made to implement FERC Staff's requested
changes to Section 7.5 and Exhibit C of the Agreement, affecting
service charges under the Agreement.
Copies of this filing have been served upon Western, DOE/SF, the
Northern California Power Agency and the California Public Utilities
Commission.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
5. Baltimore Gas and Electric Co.
[Docket No. ER94-997-000]
Take notice that on April 15, 1994, Baltimore Gas and Electric
Company tendered for filing an amendment to its February 28, 1994,
filing in the above-referenced docket.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
6. Midwest Power Systems Inc.
[Docket No. ER94-1124-000]
Take notice that on April 1, 1994, Midwest Power Systems Inc.
(MPSI) tendered for filing a Firm Transmission Service, Exhibit A with
Western Area Power Agency (Western) and Iowa Public Service Company n/
k/a MPSI. This Exhibit A allows Western to increase its schedule power
over the MPSI system for delivery to the OPPD system in accordance with
Section 6 of Contract No. 89-BAO-337, dated January 18, 1989.
MPSI respectfully requests that the change in schedule of firm
transmission service be approved effective December 1, 1992. MPSI
states that copies of this filing were served on Western, OPPD and the
Iowa Utilities Board.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
7. Interstate Power Co.
[Docket No. ER94-1143-000]
Take notice that on April 4, 1994, Interstate Power Company
tendered for filing a Notice of Cancellation of its Rate Schedule FERC
No. 0116.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
8. Commonwealth Electric Co.
[Docket No. ER94-1144-000]
Take notice that on April 8, 1994, Commonwealth Electric Company
(Commonwealth) tendered for filing, pursuant to Section 35.12 of the
Commission's Regulations, System Power Sale agreements governing the
sale by Commonwealth of System Power (as defined therein) to Green
Mountain Power Corporation (GMP), Fitchburg Gas and Electric Light
Company (FG&E), and Montaup Electric Company (Montaup). GMP, FG&E and
Montaup are collectively referred to herein as the ``Buyers''.
By the provisions of this agreement, Commonwealth proposes to sell
to the Buyers electric power upon terms and conditions and in amounts
mutually acceptable to each respective party.
A copy of this filing has been served upon the Buyers and upon the
Massachusetts Department of Public Utilities.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
9. Entergy Services, Inc.
[Docket No. ER94-1148-000]
Take notice that on April 11, 1994, Entergy Services, Inc. (Entergy
Services) filed a letter notifying the Commission of its resignation
and withdrawal from membership in the Interregional Transmission
Coordination Forum (ITCF) on April 7, 1994. Entergy Services requests
that the Commission make this resignation and withdrawal from
membership effective on April 7, 1994. Entergy Services states that it
has served a copy of this filing on the Administrator of the ITCF.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
10. New England Power Co.
[Docket No. ER94-1155-000]
Take notice that New England Power Company (NEP), on April 14,
1994, tendered for filing a preliminary agreement and certificate of
concurrence with Nantucket Electric Company and seeks an effective date
of sixty days from this filing.
Comment date: May 5, 1994, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-10344 Filed 4-29-94; 8:45 am]
BILLING CODE 6717-01-P