97-11421. Hydroelectric Applications [SomersVille HydroPower GenCo, et al.]; Notice of Applications  

  • [Federal Register Volume 62, Number 85 (Friday, May 2, 1997)]
    [Notices]
    [Pages 24103-24104]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-11421]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Project Nos. DI97-5-000, et al.]
    
    
    Hydroelectric Applications [SomersVille HydroPower GenCo, et 
    al.]; Notice of Applications
    
        Take notice that the following hydroelectric applications have been 
    filed with the Commission and are available for public inspection:
        1a. Type of Application: Declaration of Intention.
        b. Project No.: DI97-5-000.
        c. Date Filed: March 27, 1997.
        d. Applicant: SomersVille HydroPower GenCo.
        e. Name of Project: Somersville Mill Pond Dam Project.
        f. Location: Scantic River, in the Town of Somers, Tolland County, 
    Connecticut.
        g. Filed Pursuant to: Section 23(b) of the Federal Power Act, 16 
    U.S.C. 817(b).
        h. Applicant Contact: Joseph S. Cudnik, Jr., 70 Somers Hill Circle, 
    Somers, CT 06071-1927, (860) 654-9378.
        i. FERC Contact: Etta Foster, (202) 219-2679.
        j. Comment Date: May 30, 1997.
        k. Description of Project: The proposed project will consist of: 
    (1) A dam, 21.5 feet-high and 185-feet wide; (2) a spillway; (3) a 70-
    foot-long penstock, 8 feet in diameter; (4) a powerhouse containing one 
    generating unit with a rated capacity of 220 kW; (5) a tailrace; (6) a 
    reservoir with a surface area of 217,800 square feet, and a drainage 
    area of 57 square feet; (7) three transmission lines, and (8) 
    appurtenant facilities.
        When a petition for Declaratory Order is filed with the Federal 
    Energy Regulatory Commission, the Federal Power Act requires the 
    Commission to investigate and determine if the interests of interstate 
    or foreign commerce would be affected by the project. The Commission 
    also determines whether or not the project: (1) Would be located on a 
    navigable waterway; (2) would occupy or affect public lands or 
    reservations of the United States; (3) would utilize surplus water or 
    water power from a government dam; or (4) if applicable, has involved 
    or would involve any construction subsequent to 1935 that may have 
    increased or would increase the project's head or generating capacity, 
    or have otherwise significantly modified the project's pre-1935 design 
    or operation.
        l. Purpose of Project: Applicant shall negotiate a purchase 
    agreement for the sale of power generated at the project.
        m. This notice also consists of the following standard paragraphs: 
    B, C1, and D2.
        2a. Type of Application: Changes in Project Land Rights and Non-
    Project Use of Project Lands and Waters.
        b. Project Name and No.: Pillager Hydroelectric Project, FERC 
    Project No. 2663-005.
        c. Date Filed: February 14, 1997.
        d. Applicant: Minnesota Power and Light Company.
        e. Location: Lake Placid on the Crow Wing River in the Township of 
    Pillager in Morrison County, Minnesota.
        f. Filed Pursuant to: Federal Power Act, 16 U.S.C 791(a)-825(r).
        g. Applicant Contact: Mr. John J. Paulson, Minnesota Power and 
    Light Company 30 West Superior Street, Duluth, MN 55802, (218) 722-
    5642.
        h. FERC Contact: Steve Naugle, (202) 219-2805.
        i. Comment Date: June 2, 1997.
        j. Description of the Filing: Minnesota Power and Light Company 
    requests
    
    [[Page 24104]]
    
    approval to convey leases of land within the Pillager Project boundary 
    to adjacent private property owners to provide access to Lake Placid. 
    The total amount of project land proposed for lease conveyance is 26.31 
    acres. The project lands that would be leased are located adjacent to 
    lots 1 through 17 of the Tall Timbers Subdivision and lots 1 through 15 
    of the North View Shores Subdivision. The applicant proposes to convey 
    both group and individual access leases.
        k. This notice also consists of the following standard paragraphs: 
    B, C1, D2.
        3a. Type of Application: Surrender of License (Major).
        b. Project No.: 3034-008.
        c. Date Filed: February 24, 1997.
        d. Applicant: Arkansas Electric Cooperative Corporation.
        e. Name of Project: Arkansas River Lock and Dam No. 3, 
    Hydroelectric Project.
        f. Location: On the Arkansas River in Jefferson and Lincoln 
    Counties, Arkansas.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C 791(a)-825(r).
        h. Contacts: S. Maurice Robinson, Director, Engineering, 
    Construction & Operations, Arkansas Electric Cooperative Corporation, 
    P.O. Box 194208, Little Rock, AR 72219-4208, (501) 570-2200.
        i. FERC Contact: Mr. Lynn R. Miles, (202) 219-2671.
        j. Comment Date: May 28, 1997.
        k. Description of the Proposed Action: The licensee requests to 
    surrender its license for the proposed project.
        l. This notice also consists of the following standard paragraphs: 
    B, C2, and D2.
        4a. Type of Filing: Request for Extension of Time to Commence 
    Project Construction.
        b. Applicant: Adirondack Hydro Development Corporation and McGrath 
    Industries, Inc.
        c. Project No.: The proposed Waterford Hydroelectric Project, FERC 
    No. 10648-003 is to be located on the Hudson River, in Saratoga and 
    Rensselear Counties, New York.
        d. Date Filed: March 12, 1997.
        e. Pursuant to: P.L. 104-242.
        f. Applicant Contact: Keith F. Corneau, Vice President, Adirondack 
    Resource Management Associates, LLC, P.O. Box 829, Two Franklin Square, 
    Saratoga Springs, NY 12866, (518) 587-4300.
        g. FERC Contact: Mr. Lynn R. Miles, (202) 219-2671.
        h. Comment Date: May 27, 1997.
        i. Description of the Requests: The licensees request that the 
    existing deadline for the commencement of construction for FERC Project 
    No. 10648 be extended to June 9, 1999. The licensees also request that 
    the deadline for submission of an access agreement with the State of 
    New York under Article 305 be extended to 60 days prior to commencement 
    of construction of the project. Further, the licensees request that the 
    deadline to file a dam rehabilitation plan and schedule, as required by 
    article 306, be extended to June 9, 1999.
        j. This notice also consists of the following standard paragraphs: 
    B, C1, and D2.
        5a. Type of Application: Surrender of License.
        b. Project No.: 4357-016.
        c. Date Filed: April 1, 1997.
        d. Applicant: Clifton Hydro-Power Limited Partnership.
        e. Name of Project: Clifton Mills #2.
        f. Location: On the Pacolet River, in Spartansburg County, South 
    Carolina.
        g. Filed Pursuant to: Federal Power Act, 16 USC Section 791(a)--
    825(r).
        h. Applicant Contact: Paul V. Nolan, Esq., 5515 N. 17th Street, 
    Arlington, VA 22205, (703) 534-5509.
        i. FERC Contact: Regina Saizan, (202) 219-2673.
        j. Comment Date: June 9, 1997.
        k. Description of Application: The licensee seeks to surrender its 
    license because it was not able to obtain financing to complete 
    construction of the project. Only five percent of the construction work 
    to complete the project has been done.
        l. This notice also consists of the following standard paragraphs: 
    B, C2, and D2.
    
    Standard Paragraphs
    
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        C1. Filing and Service of Responsive Documents--Any filings must 
    bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
    FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as 
    applicable, and the Project Number of the particular application to 
    which the filing refers. Any of the above-named documents must be filed 
    by providing the original and the number of copies provided by the 
    Commission's regulations to: The Secretary, Federal Energy Regulatory 
    Commission, 888 First Street, NE., Washington, DC 20426. A copy of any 
    motion to intervene must also be served upon each representative of the 
    Applicant specified in the particular application.
        C2. Filing and Service of Responsive Documents--Any filings must 
    bear in all capital letters the title ``COMMENTS,'' ``RECOMMENDATIONS 
    FOR TERMS AND CONDITIONS,'' ``NOTICE OF INTENT TO FILE COMPETING 
    APPLICATION,'' ``COMPETING APPLICATION,'' ``PROTEST,'' or ``MOTION TO 
    INTERVENE,'' as applicable, and the Project Number of the particular 
    application to which the filing refers. Any of these documents must be 
    filed by providing the original and the number of copies provided by 
    the Commission's regulations to: The Secretary, Federal Energy 
    Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A 
    copy of a notice of intent, competing application, or motion to 
    intervene must also be served upon each representative of the Applicant 
    specified in the particular application.
        D2. Agency Comments--Federal, state, and local agencies are invited 
    to file comments on the described application. A copy of the 
    application may be obtained by agencies directly from the Applicant. If 
    an agency does not file comments within the time specified for filing 
    comments, it will be presumed to have no comments. One copy of an 
    agency's comments must also be sent to the Applicant's representatives.
    
        Dated: April 25, 1997, Washington, DC.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-11421 Filed 5-1-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Effective Date:
5/30/1997
Published:
05/02/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
The licensee requests to surrender its license for the proposed project.
Document Number:
97-11421
Dates:
May 30, 1997.
Pages:
24103-24104 (2 pages)
Docket Numbers:
Project Nos. DI97-5-000, et al.
PDF File:
97-11421.pdf