Start Preamble
1. By letter filed March 26, 2014, Northline Energy, LLC informed the Commission that the exemption from licensing for the Seneca Hydroelectric Project, FERC No. 4296, originally issued February 17, 1982,[1] has been transferred to Northline Energy, LLC. The project is located on the Seneca River in Onondaga County, New York. The transfer of an exemption does not require Commission approval.
2. Northline Energy, LLC, located at 15 School Lane, P.O. Box 656, Au Sable Forks, NY 12912, is now the exemptee of the Seneca Hydroelectric Project, FERC No. 4296.
Start SignatureDated: April 28, 2014.
Kimberly D. Bose,
Secretary.
Footnotes
1. 18 FERC ¶ 62,227, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 Megawatts or Less.
Back to Citation[FR Doc. 2014-10095 Filed 5-1-14; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 05/02/2014
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2014-10095
- Pages:
- 25129-25129 (1 pages)
- Docket Numbers:
- Project No. 4296-010
- PDF File:
- 2014-10095.pdf