2016-10096. Rugraw, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Major Original License.

    b. Project No.: P-12496-002.

    c. Date filed: April 21, 2014.

    d. Applicant: Rugraw, LLC.

    e. Name of Project: Lassen Lodge Hydroelectric Project.

    f. Location: On the South Fork Battle Creek near the Town of Mineral in Tehama County, California. The project would be located on private lands. No federal lands or Indian reservations are located within the proposed project boundary.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Charlie Kuffner, 70 Paseo Mirasol, Tiburon, CA 94920; (415) 652-8553

    i. FERC Contact: Kenneth Hogan at (202) 502-8434; or via email at kenneth.hogan@ferc.gov.

    j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice.

    The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P-12496-002.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. This application has been accepted and is now ready for environmental analysis.

    l. The proposed Lassen Lodge Project would consist of: (1) A 6-foot-high and 94-foot-long diversion dam; (2) an impoundment of approximately 0.5 Start Printed Page 26222acre; (3) a 20-foot by 10-foot enclosed concrete intake structure; (4) a 7,258-foot-long pipeline and a 5,230-foot-long penstock with a net head of 791 feet; (5) a 50-foot by 50-foot powerhouse containing one generating unit with a 5,000-kilowatt capacity; (6) a 50-foot by 50-foot substation area; (7) a 40-foot by 35-foot switchyard; (8) 100-foot by 100-foot multipurpose area; and (9) a new 12-mile-long, 60-kilovolt transmission line. The project is estimated to produce approximately 25,000,000 kilowatt hours annually.

    m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.

    All filings must (1) bear in all capital letters the title “COMMENTS”, “REPLY COMMENTS”, “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010.

    You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission's regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice.

    o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate.

    MilestoneTarget
    Notice that application is ready for environmental analysisApril 2016.
    Filing of comments, recommendations, terms and conditions, and prescriptionsJune 2016.
    Filing of reply commentsJuly 2016.
    Notice of the availability of the draft EISOctober 2016.
    Initiate 10(j) processDecember 2016.
    Notice of the availability of the final EISMay 2017.

    p. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification.

    Start Signature

    Dated: April 25, 2016.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2016-10096 Filed 4-29-16; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
05/02/2016
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2016-10096
Pages:
26221-26222 (2 pages)
Docket Numbers:
Project No. 12496-002
PDF File:
2016-10096.pdf