E9-11713. Notice of Final Federal Agency Actions on Proposed Highways in Washington  

  • Start Preamble

    AGENCY:

    Federal Highway Administration (FHWA), DOT.

    ACTION:

    Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies.

    SUMMARY:

    This notice announces actions taken by the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the Mercer Corridor Improvements Project, located in the city of Seattle, King County, Washington. Those actions grant licenses, permits, and approvals for the project.

    DATES:

    By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before November 16, 2009. If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period still applies.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Brian Hasselbach, Area Engineer, Federal Highway Administration—Washington Division, 711 South Capitol Way, Suite 501, Olympia, WA 98501. Office hours are 8 a.m. to 4 p.m. (Pacific Time), (360) 753-9411, Brian.Hasselbach@dot.gov. You may also contact Angela Brady, Project Manager, Seattle Department of Transportation (SDOT), P.O. Box 34996, Seattle, WA 98124; telephone: 206-684-3115; and e-mail: angela.brady@seattle.gov. SDOT's regular office hours are between 8 a.m. and 5 p.m. (Pacific Time).

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Notice is hereby given that the FHWA has taken final agency actions by issuing a Finding of No Significant Impacts (FONSI) for the Mercer Corridor Improvements Project. The purpose of the project is to provide vehicular and pedestrian improvements to the Mercer Street corridor between Interstate 5 (I-5) on and off ramps and Dexter Avenue North. The project is located in the South Lake Union neighborhood of Seattle, King County, Washington.

    The actions by FHWA on this project, and the laws under which such actions were taken, are described in the December 2008 Environmental Assessment (EA); the May 2009 FONSI; and in other documents in the FHWA's administrative record for the project. The EA, FONSI, and other documents in the FHWA administrative record are available by contacting FHWA or the Seattle Department of Transportation at the addresses provided previously.

    The EA and FONSI can be viewed and downloaded from the project Web site at http://www.seattle.gov/​Transportation/​ppmp_​mercer.htm or viewed at the Seattle Public Library, as well as local neighborhood service centers within the project area. This notice applies to all Federal agency decisions on the project, as of the issuance date of this notice, and all laws under which such actions were taken, including but not limited to:

    1. General: National Environmental Policy Act [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109].

    2. Air: Clean Air Act, as amended [42 U.S.C. 7401-7671(q)].

    3. Land: Section 4(f) of the Department of Transportation Act of 1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers) [23 U.S.C. 319].

    4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544]; Anadromous Fish Conservation Act [16 U.S.C. 757(a)-757(g)]; Fish and Wildlife Coordination Act [16 U.S.C. 661-667(d)]; Magnuson-Stevenson Fishery Conservation and Management Act of 1976, as amended [16 U.S.C. 1801 et seq.].

    5. Historic and Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f) et seq.]; Archaeological Resources Protection Act of 1977 [16 U.S.C. 470(aa)-11]; Archaeological and Historic Preservation Act [16 U.S.C. 469-469(c)]; Native American Grave Protection and Repatriation Act [25 U.S.C. 3001-3013].Start Printed Page 23774

    6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Protection Policy Act [7 U.S.C. 4201-4209]; the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended [42 U.S.C. 61].

    7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251-1377 (Section 404, Section 401, Section 319); Coastal Zone Management Act [16 U.S.C. 1451-1465]; Land and Water Conservation Fund [16 U.S.C. 4601-4604]; Safe Drinking Water Act [42 U.S.C. 300(f)-300(j)(6)]; Rivers and Harbors Act of 1899 [33 U.S.C. 401-406]; TEA-21 Wetlands Mitigation [23 U.S.C. 103(b)(6)(m), 133(b)(11)]; Flood Disaster Protection Act [42 U.S.C. 4001-4128].

    8. Hazardous Materials: Comprehensive Environmental Response, Compensation, and Liability Act [42 U.S.C. 9601-9675]; Superfund Amendments and Reauthorization Act of 1986 [Pub. L. 99-499]; Resource Conservation and Recovery Act [42 U.S.C. 6901-6992(k)].

    9. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; E.O. 13175 Consultation and Coordination with Indian Tribal Governments; E.O. 11514 Protection and Enhancement of Environmental Quality; E.O. 13112 Invasive Species.

    (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.)

    Start Authority

    Authority: 23 U.S.C. 139(l)(1).

    End Authority Start Signature

    Issued on: May 14, 2009.

    Brian Hasselbach,

    Area Engineer, Olympia, Washington.

    End Signature End Supplemental Information

    [FR Doc. E9-11713 Filed 5-19-09; 8:45 am]

    BILLING CODE 4910-RY-P

Document Information

Comments Received:
0 Comments
Published:
05/20/2009
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies.
Document Number:
E9-11713
Dates:
By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before November 16, 2009. If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period still applies.
Pages:
23773-23774 (2 pages)
PDF File:
e9-11713.pdf