98-13495. Equitrans, L.P.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 98 (Thursday, May 21, 1998)]
    [Notices]
    [Page 27937]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-13495]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-530-000]
    
    
    Equitrans, L.P.; Notice of Request Under Blanket Authorization
    
    May 15, 1998.
        Take notice that on May 8, 1998, Equitrans, L.P. (Equitrans), 3500 
    Park Lane, Pittsburgh, PA 15275, filed in Docket No. CP98-530-000, a 
    request, pursuant to Sections 157.205 and 157.211 of the Commission's 
    Regulations under the Natural Gas Act (18 CFR 157.205 and 157.211), for 
    authorization to install a tap, metering, electronic flow measurement, 
    and appurtenant facilities for the delivery of transportation gas to 
    AFG Industries, Inc. (AFG) in Flemington District, Taylor County, West 
    Virginia, under Equitrans' blanket certificate authorization issued in 
    Docket No. CP83-508-000, pursuant to Section 7 of the Natural Gas Act, 
    all as more fully set forth in the request which is on file with the 
    Commission and open to public inspection.
        Specifically, Equitrans seeks authorization to install a tap 
    connection on its existing pipeline, Number GST-902. Equitrans relates 
    that it will have a ten year firm transportation agreement with AFG. 
    Equitrans states that the annual delivered volumes will be 
    approximately 1,642,000 Dth, with a peak day volume of 5,000 Dth and a 
    daily contractual obligation of 4,300 Dth. Equitrans asserts that all 
    volumes delivered to AFG will be within contractually permissible 
    levels.
        Equitrans states that this change is not prohibited by an existing 
    tariff and that it has sufficient capacity to accomplish the deliveries 
    specified without detriment or disadvantage to its other customers. 
    Equitrans estimates the cost to construct the facilities at 
    approximately $127,200, a portion of which will be reimbursed by AFG to 
    Equitrans. Equitrans has sent a copy of this request to the West 
    Virginia Public Service Commission.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file with the Federal 
    Energy Regulatory Commission, 888 First Street, NE, Washington, DC 
    20426, pursuant to Rule 214 of the Commission's Procedural Rules (18 
    CFR 385.214) a motion to intervene or notice of intervention and 
    pursuant to Section 157.205 of the Regulations under the Natural Gas 
    Act (18 CFR 157.205) a protest to the request. If no protest is filed 
    within the time allowed therefore, the proposed activity shall be 
    deemed to be authorized effective the day after the time allowed for 
    filing a protest. If a protest is filed and not withdrawn within 30 
    days after the time allowed for filing a protest, the instant request 
    shall be treated as an application for authorization pursuant to 
    Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-13495 Filed 5-20-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
05/21/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-13495
Pages:
27937-27937 (1 pages)
Docket Numbers:
Docket No. CP98-530-000
PDF File: