98-13508. Vermont Yankee Nuclear Power Corporation, Vermont Yankee Nuclear Power Station; Receipt of Petition for Director's Decision Under 10 CFR 2.206  

  • [Federal Register Volume 63, Number 98 (Thursday, May 21, 1998)]
    [Notices]
    [Page 28015]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-13508]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket No. 50-271]
    
    
    Vermont Yankee Nuclear Power Corporation, Vermont Yankee Nuclear 
    Power Station; Receipt of Petition for Director's Decision Under 10 CFR 
    2.206
    
        Notice is hereby given that by Petition dated April 9, 1998, Mr. 
    Michael J. Daley, on behalf of the New England Coalition on Nuclear 
    Pollution, Inc. (or Petitioner), requested that the U.S. Nuclear 
    Regulatory Commission (NRC) take immediate action with regard to the 
    Vermont Yankee Nuclear Power Station. The Petitioner requests that the 
    NRC issue an order requiring that the licensee's administrative limits, 
    which preclude Vermont Yankee Nuclear Power Station from operating with 
    a torus water temperature above 80  deg.F or with service water 
    injection temperature greater than 50  deg.F, shall remain in force 
    until certain conditions are met. The requested conditions include a 
    complete reconstitution of the licensing basis for the maximum torus 
    water temperature, submittal to the NRC of a technical specifications 
    amendment request establishing the correct maximum torus water 
    temperature, and completion of NRC review of the amendment request.
        As the basis for this request, the Petitioner states that the 
    licensee has been unable to demonstrate an ability to either justify 
    the operational limits for the maximum torus water temperature or 
    maintain operations within existing administrative limits (torus water 
    temperature is critical to the proper functioning of the containment). 
    The Petitioner also states that the NRC must move from a ``wait and 
    see'' posture to active intervention, with immediate imposition of the 
    order as a necessary first step.
        The request is being treated pursuant to 10 CFR 2.206 of the 
    Commission's regulations. The request has been referred to the Director 
    of the Office of Nuclear Reactor Regulation. As provided by Sec. 2.206, 
    appropriate action will be taken on this petition within a reasonable 
    time.
        By letter dated May 13, 1998, the Director denied Petitioner's 
    request for immediate action at Vermont Yankee Nuclear Power Station.
        A copy of the petition is available for inspection at the 
    Commission's Public Document Room at 2120 L Street, NW., Washington, 
    DC. 20555-0001 and at the local public document room located at Brooks 
    Memorial Library, 224 Main Street, Brattleboro, VT 05301.
    
        Dated at Rockville, MD, this 13th day of May, 1998.
    
        For the Nuclear Regulatory Commission.
    Samuel J. Collins,
    Director, Office of Nuclear Reactor Regulation.
    [FR Doc. 98-13508 Filed 5-20-98; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
05/21/1998
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
98-13508
Pages:
28015-28015 (1 pages)
Docket Numbers:
Docket No. 50-271
PDF File:
98-13508.pdf