DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER95-835-002, et al.]
Yankee Atomic Electric Company, et al. Electric Rate and
Corporate Regulation Filings
May 15, 1998.
Take notice that the following filings have been made with the
Commission:
1. Yankee Atomic Electric Company
[Docket No. ER95-835-002]
Take notice that on April 8, 1997, Yankee Atomic Electric Company
tendered for filing an amended compliance report in the above-
referenced docket.
Comment date: May 26, 1998, in accordance with Standard Paragraph E
at the end of this notice.
2. Stratton Energy Associates, (a New York limited partnership)
[Docket Nos. EC98-42-000 and ER98-2931-000]
Take notice that on May 6, 1998, Stratton Energy Associates (SEA),
a New York limited partnership, submitted petition for waiver of the
Commission's rule restricting the filing of rate schedules to a period
no less than 60 days, but not more than 120 days, prior to the date on
which electric service is scheduled to commence and become effective
under the rate schedule. 18 CFR 35.3. This request is made with regard
to SEA's Rate Schedule No. 2, which is being filed simultaneously with
such petition.
SEA further requests that the Commission waive its cost-of-service
filing requirements applicable to initial rate filings, 18 CFR
35.12(b)(5), and to accept the SEA Rate Schedule No. 2 as filed. SEA
also petitions the Commission to waive certain Commission rules that
the Commission has previously determined not to be appropriately
applicable to qualifying facilities such as the SEA facility.
Finally, SEA requests that the Commission find that the SEA Rate
Schedule No. 2 constitutes a formula rate. Therefore, upon any
acceptance of this rate by the Commission, any changes in charges due
to the operation of the formula need not be filed with the Commission
as a change in a rate schedule. See 13 CFR 35.13.
SEA Rate Schedule No. 2 governs the sale of electricity from a 45
megawatt biomass fired electric generation facility located in the Town
of Eustis, Maine (the Project).
The purpose of these filings is to allow for the closing and
implementation of a series of transactions that will provide savings to
the ratepayers of CMP, to the extent determined by the Maine Public
Utilities Commission. SEA Rate Schedule No. 2 will replace an existing
high cost wholesale power sales agreement between SEA and Central Maine
Power Company (CMP). The effective date of SEA Rate Schedule No. 2, and
closing on associated transactions, is subject to final approval by the
Maine Public Service Commission. The transactions do not require and
will not result in the withdrawal of any capacity from the market.
SEA requests that the Commission expedite public review of the
filing, in light of the fact that the Maine Public Utilities Commission
is reviewing the actual ratepayer impact of the forgoing transactions
in a concurrent docket. The Commission ordinarily allows 60 days after
the date of such a filing before final action can be taken.
Comment date: June 15, 1998, in accordance with Standard Paragraph
E at the end of this notice.
3. Atlantic City Electric Company, Inc.
[Docket No. ER97-3189-013]
Take notice that on March 27, 1998, Public Service Electric and Gas
Company submitted an amendment to the compliance filing it submitted on
January 26, 1998 in compliance with Ordering Paragraph (P) and (T) of
the Commission's Order in Pennsylvania-New Jersey-Maryland
Interconnection, et al., 81 FERC para. 61,257 (1997). PSE&G states that
this amendment is required to conform the rates in the January 26,
1998, compliance filing with the revised transmission rates filed in
response to the Commission's order on clarification in Pennsylvania-New
Jersey-Maryland Interconnection, et al., 82 FERC para. 61,068 (1998).
Comment date: May 26, 1998, in accordance with Standard Paragraph E
at the end of this notice.
4. Central Power and Light Company, West Texas Utilities Company,
Public Service Company of Oklahoma, and Southwestern Electric Power
Company
[Docket No. ER98-857-000]
Take notice that on May 12, 1998, Central Power and Light Company,
West Texas Utilities Company, Public Service Company of Oklahoma, and
Southwestern Electric Power Company (collectively, the CSW Operating
Companies) gave notice of the withdrawal of their filing in the above
captioned proceeding. The CSW Operating Companies state that the
Commission's December 10 order issued in Docket No. OA97-24-000 and the
submission of a revised open access transmission tariff on February 17,
1998 in response to that order, renders the submission of their filing
in this proceeding unnecessary.
The CSW Operating Companies state that a copy of this filing has
been served on the Public Utility Commission of Texas, the Louisiana
Public Service Commission, the Arkansas Public Service Commission, the
Oklahoma Corporation Commission and all parties to this proceeding.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
5. PJM Interconnection, L.L.C.
[Docket No. ER98-1386-000]
Take notice that on April 17, 1998, the PJM Interconnection, L.L.C.
(PJM), tendered for filing a letter stating that MidCon and MC2 rescind
their request to withdraw from membership in PJM.
Comment date: May 27, 1998, in accordance with Standard Paragraph E
at the end of this notice.
6. The Washington Water Power Co.
[Docket No. ER98-2434-000]
Take notice that on May 12, 1998, The Washington Water Power
Company (WWP), filed notice of withdrawal of its filing with the
Federal Energy Regulatory Commission of a Long-Term Firm Point-To-Point
Transmission Service Agreement with Avista Energy, Inc.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
7. Minnesota Power & Light Company
[Docket No. ER98-2628-000]
Take notice that on April 24, 1998, Minnesota Power & Light Company
tendered for filing an amendment in the above-referenced docket.
Comment date: May 27, 1998, in accordance with Standard Paragraph E
at the end of this notice.
8. Oeste Power Generation, L.L.C.
[Docket No. ER98-2961-000]
Take notice that on May 12, 1998, Oeste Power Generation, L.L.C.
(Oeste Power), tendered for filing a service agreement establishing
NorAm Energy Services, Inc. (NES), as a customer under Oeste Power's
market-based rate sales tariff. Oeste Power requests an effective date
of April 13, 1998, for the service agreement.
Oeste Power states that a copy of the filing was served on NES.
[[Page 27949]]
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
9. Alta Power Generation, L.L.C.
[Docket No. ER98-2962-000]
Take notice that on May 12, 1998, Alta Power Generation, L.L.C.
(Alta Power), tendered for filing a service agreement establishing
NorAm Energy Services, Inc. (NES), as a customer under Alta Power's
market-based rate sales tariff. Alta Power requests an effective date
of April 13, 1998, for the service agreement.
Alta Power states that a copy of the filing was served on NES.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
10. Ocean Vista Power Generation, L.L.C.
[Docket No. ER98-2963-000]
Take notice that on May 12, 1998, Ocean Vista Power Generation,
L.L.C. (Ocean Vista), tendered for filing a service agreement
establishing NorAm Energy Services, Inc. (NES), as a customer under
Ocean Vista's market-based rate sales tariff. Ocean Vista requests an
effective date of April 13, 1998, for the service agreement.
Ocean Vista states that a copy of the filing was served on NES.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
11. Mountain Vista Power Generation, L.L.C.
[Docket No. ER98-2964-000]
Take notice that on May 12, 1998, Mountain Vista Power Generation,
L.L.C. (Mountain Vista), tendered for filing a service agreement
establishing NorAm Energy Services, Inc. (NES), as a customer under
Mountain Vista's market-based rate sales tariff. Mountain Vista
requests an effective date of April 13, 1998 for the service agreement.
Mountain Vista states that a copy of the filing was served on NES.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
12. Consumers Energy Company
[Docket No. ER98-2965-000]
Take notice that on May 12, 1998, Consumers Energy Company
(Consumers) tendered for filing an executed Service Agreement for
Network Integration Transmission Service pursuant to Consumers' Open
Access Transmission Service Tariff and a Network Operating Agreement.
Both were with the Cannon-Muskegon Corporation and have effective dates
of May 1, 1998.
Copies of the filed agreement were served upon the Michigan Public
Service Commission and the customer.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
13. FirstEnergy System
[Docket No. ER98-2966-000]
Take notice that on May 12, 1998, FirstEnergy System filed a
Service Agreement to provide Non-Firm Point-to-Point Transmission
Service for Merchant Energy Group of the Americas, the Transmission
Customer. Services are being provided under the FirstEnergy System Open
Access Transmission Tariff submitted for filing by the Federal Energy
Regulatory Commission in Docket No. ER97-412-000. The proposed
effective date under this Service Agreement is April 27, 1998.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
14. Alliant Service, Inc.
[Docket No. ER98-2967-000]
Take notice that on May 12, 1998, Alliant Services, Inc., tendered
for filing an executed Service Agreements for firm and non-firm point-
to-point transmission service, establishing Northern States Power
Company as a point-to-point Transmission Customer under the terms of
the Alliant Services, Inc., transmission tariff.
Alliant Services, Inc., requests an effective date of April 17,
1998, and accordingly, seeks waiver of the Commission's notice
requirements. A copy of this filing has been served upon the Public
Service Commission of Wisconsin.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
15. Montaup Electric Company
[Docket No. ER98-2968-000]
Take notice that on May 12, 1998, Montaup Electric Company
(Montaup), tendered for filing certain revisions to the service
agreements between Montaup and its two retail affiliates doing business
in Rhode Island, Blackstone Valley Electric Company and Newport
Electric Corporation, and between Montaup and its retail affiliate
doing business in the Commonwealth of Massachusetts, Eastern Edison
Company. Montaup requests that these service agreements be accepted and
allowed to be made effective as of June 11, 1998.
According to Montaup, the purpose of its filing is to effectuate a
reduction in Montaup's Installed Capability Responsibility as that term
is defined in Section 12.2 of the New England Power Pool Tariff on file
with the Commission.
Copies of the filing were served upon Montaup's jurisdictional
customers and upon affected state agencies.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
16. FirstEnergy System
[Docket No. ER98-2969-000]
Take notice that on May 12, 1998, FirstEnergy System filed Service
Agreements to provide Firm Point-to-Point Transmission Service for
Merchant Energy Group of the Americas and AYP Energy, Incorporated, the
Transmission Customers. Services are being provided under the
FirstEnergy System Open Access Transmission Tariff submitted for filing
by the Federal Energy Regulatory Commission in Docket No. ER97-412-000.
The proposed effective dates under the Service Agreements are April 27,
1998 and May 1, 1998 respectively, for the above mentioned Service
Agreements in this filing.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
17. Delmarva Power & Light Company
[Docket No. ER98-2970-000]
Take notice that on May 16, 1998, Delmarva Power & Light Company
(Delmarva), tendered for filing executed umbrella service agreements
with Continental Energy Services, L.L.C., VTEC Energy, Inc., SCANA
Energy Marketing, Inc., and Southern Company Energy Marketing L.P.,
under Delmarva's market rate sales tariff, FERC Electric Tariff,
Original Volume No. 14, that was filed by Delmarva in Docket No. ER96-
2571-000. Delmarva requests that the Commission make the agreements
effective as of their respective execution dates.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
18. El Segundo Power, LLC
[Docket No. ER98-2971-000]
Take notice that on May 12, 1998, El Segundo Power, LLC, tendered
for filing pursuant to Section 205 of the Federal Power Act an
amendment to its Electric Rate Schedule FERC No. 1, which would allow
El Segundo Power, LLC to sell ancillary services at market-based rates.
El Segundo Power, LLC, has requested an effective date of April 15,
1998.
[[Page 27950]]
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
19. Long Beach Generation LLC
[Docket No. ER98-2972-000]
Take notice that on May 12, 1998, Long Beach Generation LLC
tendered for filing pursuant to Section 205 of the Federal Power Act an
amendment to its Electric Rate Schedule FERC No. 1, which would allow
Long Beach Generation LLC to sell ancillary services at market-based
rates. Long Beach Generation LLC has requested an effective date of
April 14, 1998.
Comment date: June 1, 1998, in accordance with Standard Paragraph E
at the end of this notice.
20. Lyon Rural Electric Cooperative
[Docket No. ES98-32-000]
Take notice that on May 7, 1998, Lyon Rural Electric Cooperative
(Lyon), filed an application with the Federal Energy Regulatory
Commission, under Section 204 of the Federal Power Act, requesting an
order authorizing the issuance of up to $3,500,000] in long-term debt,
over a two-year period commencing June 30, 1998. Lyon also requests to
be granted a waiver of the Commission's competitive bid or negotiated
placement requirement, under 18 CFR 34.2, pursuant to the authorization
requested in this docket.
Comment date: June 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
21. Tampa Electric Company
[Docket Nos. OA96-116-002 and ER95-1775-002]
Take notice that on April 20, 1998, Tampa Electric Company tendered
for filing corrected tariff sheets for the Settlement Agreement filed
on January 20, 1998 in the above-referenced dockets.
Comment date: May 27, 1998, in accordance with Standard Paragraph E
at the end of this notice.
22. Westmoreland-LG&E Partners (Roanoke Valley)
[Docket Nos. QF92-180-004, EL98-47-000, Docket Nos. EL94-10-002, QF86-
177-003]
Take notice that on May 11, 1998, Westmoreland-LG&E Partners (the
Partnership) submitted a Petition for Declaratory Order or, in the
Alternative, Request for Waiver of QF Ownership Standard. The
Partnership is the owner of a 45.1 MW topping-cycle cogeneration
facility that has previously been certified by the Commission as a
qualifying cogeneration facility, see Westmoreland-LG&E Partners
(Roanoke Valley II), 60 FERC para. 62,215 (1992); Westmoreland-LG&E
Partners (Roanoke Valley II), 64 FERC para. 62,215 (1993).
Comment date: June 15, 1998, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of these filings are on file with
the Commission and are available for public inspection.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-13559 Filed 5-20-98; 8:45 am]
BILLING CODE 6717-01-P