        Take notice that the following filings have been made with the 
    Commission:
    
    1. PacifiCorp
    
    [Docket No. ER95-1240-003]
    
        Take notice that on May 4 1999, PacifiCorp, tendered for filing in 
    accordance with 18 CFR 35 of the Commission's Rules and Regulations and 
    the Commission's Order under FERC Docket No. ER95-1240-000, dated April 
    21, 1999, an amended refund report.
        Copies of this filing were supplied to the Washington Utilities and 
    Transportation Commission and the Public Utility Commission of Oregon.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    2. Duke Energy Moss Landing, LLC
    
    [Docket No. ER98-2668-000]
    
        Take notice that on May 3, 1999, Duke Energy Moss Landing, LLC, 
    tendered for filing an addendum to its April 30, 1999, filing in the 
    above referenced docket.
        Comment date: May 21, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    [[Page 27773]]
    
    3. Monmouth Energy, Inc.
    
    [Docket No. ER99-1293-001]
    
        Take notice that on May 4, 1999, Monmouth Energy, Inc., tendered 
    for filing its amended refund report in accordance with Commission 
    Staff inquiry.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. New England Power Pool
    
    [Docket No. ER99-2707-000]
    
        Take notice that on April 30, 1999, the New England Power Pool 
    Executive Committee tendered for filing a signature page to the New 
    England Power Pool (NEPOOL) Agreement dated September 1, 1971, as 
    amended, signed by Penobscot Hydro, LLC (Penobscot). The NEPOOL 
    Agreement has been designated NEPOOL FPC No. 2.
        The Executive Committee states that the Commission's acceptance of 
    Penobscot's signature page would permit NEPOOL to expand its membership 
    to include Penobscot. NEPOOL further states that the filed signature 
    page does not change the NEPOOL Agreement in any manner, other than to 
    make Penobscot a member in NEPOOL.
        NEPOOL requests an effective date of May 1, 1999, for commencement 
    of participation in NEPOOL by Penobscot.
        Comment date: May 20, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    5. Duke Energy Trading and Marketing, L.L.C.
    
    [Docket No. ER99-2774-000]
    
        Take notice that on May 3, 1999, Duke Energy Trading and Marketing, 
    L.L.C. (DETM), tendered for filing a Notice of Succession with the 
    Federal Energy Regulatory Commission indicating that the name of NP 
    Energy Inc., has been changed to Duke Energy Trading and Marketing, 
    L.L.C., effective March 31, 1999. In accordance with Sections 35.16 and 
    131.51 of the Commission's regulations, 18 CFR 35.16, 131.51, DETM 
    adopted and ratified all applicable rate schedules filed with the FERC 
    by NP Energy Inc.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Central Power and Light Company, West Texas Utilities Company, 
    Public Service Company of Oklahoma and Southwestern Electric Power 
    Company
    
    [Docket No. ER99-2779-000]
    
        Take notice that on May 3, 1999, Central Power and Light Company, 
    West Texas Utilities Company, Public Service Company of Oklahoma, and 
    Southwestern Electric Power Company (collectively, the CSW Operating 
    Companies) tendered for filing: (1) an amendment to the unexecuted 
    Network Operating Agreement (NOA) between the CSW Operating Companies 
    and Northeast Texas Electric Cooperative, Inc. (NTEC); and (2) an 
    amendment to the unexecuted NOA between the CSW Operating Companies and 
    East Texas Electric Cooperative, Inc., (ETEC). The originally filed 
    unexecuted NOAs between the CSW Operating Companies ad NTEC and ETEC 
    have been set for hearing in Docket Nos. ER99-1659-000 and ER99-1660-
    000 (consolidated). See Central Power and Light Co., et al., 87 FERC 
    para. 61,001 (1999).
        The amendments propose a new NOA Section 3.2. This provision 
    specifies certain circumstances under which a network customer's 
    network load may be curtailed.
        The CSW Operating Companies request an effective date of July 2, 
    1999.
        The CSW Operating Companies state that a copy of this filing has 
    been served on each person listed on the official service list in 
    Docket Nos. ER99-1659-000 and ER99-1660-000 (consolidated).
        Comment date: May 21, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. Pacific Gas and Electric Company
    
    [Docket No. ER99-2780-000]
    
        Take notice that on May 3, 1999, Pacific Gas and Electric Company 
    (PG&E), tendered for filing as a supplement to PG&E Rate Schedule FERC 
    No. 85, the Interconnection Agreement between PG&E and the City of 
    Santa Clara, California (City or Santa Clara), a Letter Agreement 
    between PG&E and Santa Clara retroactively adjusting the demand rates 
    for the City for 1995 and 1996. The filing also includes a 1995 
    decision by the California Public Utilities Commission (CPUC), Decision 
    No. 95-05-043, and a calculation of the Diablo Canyon Demand True-Up 
    plus interest for the years 1995 and 1996.
        Copies of this filing were served upon City and the CPUC.
        Comment date: May 21, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. San Diego Gas & Electric Company
    
    [Docket No. ER99-2789-000]
    
        Take notice that on May 3, 1999, San Diego Gas & Electric Company 
    (SDG&E), tendered for filing a Notice of Cancellation of Service 
    Agreement Nos. 1 though 7, including Supplement No. 1 of FERC Electric 
    Tariff Original Volume No. 5, by which SDG&E obtains wholesale 
    distribution service under SDG&E's Open Access Distribution Tariff (the 
    OADT) for its combustion turbines.
        SDG&E requests that these notices of cancellation be made effective 
    on the date as of which completion of the transfer of title from SDG&E 
    to Cabrillo Power II LLC (Cabrillo Power II)--the purchaser and new 
    owner of these combustion turbines--takes place. The closing of this 
    transfer of title currently is anticipated to occur on or about May 14, 
    1999.
        Copies of this filing have been served upon the California Public 
    Utilities Commission and Cabrillo Power II.
        Comment date: May 21, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    9. San Diego Gas & Electric Company
    
    [Docket No. ER99-2790-000]
    
        Take notice that on May 3, 1999, San Diego Gas & Electric Company 
    (SDG&E), tendered for filing executed Service Agreements between SDG&E 
    and Cabrillo Power II LLC (Cabrillo Power II) for service under SDG&E 
    Open Access Distribution Tariff (OATD). SDG&E states that it tenders 
    the Service Agreements to assure that service under the OATD is 
    available to Cabrillo Power II by the date on which Cabrillo Power 
    takes title to SDG&E's combustion turbines located in SDG&E's service 
    area, currently anticipated to occur on May 14, 1999.
        Copies of this filing have been served upon the California Public 
    Utilities Commission and Cabrillo Power II.
        Comment date: May 21, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. Ogden Martin Systems of Union, Inc.
    
    [Docket No. ER99-2791-000]
    
        Take notice that on May 4, 1999, Ogden Martin Systems of Union, 
    Inc., tendered for filing with the Commission (1) the Power Purchase 
    and Interconnection Agreement dated April 11, 1990 between Union County 
    Utilities Authority (UCUA) and Public Service Electric and Gas Company 
    (PSE&G); (2) an Amendment to the Power Purchase and Interconnection 
    Agreement dated May 28, 1998 between UCUA and PSE&G; and (3) an 
    Assignment and Assumption of Power Purchase and Interconnection 
    Agreement dated July 22, 1998, between UCUA and Ogden Union.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    [[Page 27774]]
    
    11. Archer Daniels Midland
    
    [Docket No. ER99-2792-000]
    
        Take notice that on May 4, 1999, Archer Daniels Midland (ADM), of 
    Decatur, Illinois tendered for filing with the Commission a Power 
    Purchase Agreement with Central Illinois Light Company, under which ADM 
    would sell energy to CILCO at market-based rates.
        ADM requested an effective date of June 1, 1999.
        Copies of the filing were served on the affected customer and the 
    Illinois Commerce Commission.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. Central Maine Power Company
    
    [Docket No. ER99-2793-000]
    
        Take notice that on May 4, 1999, Central Maine Power Company (CMP), 
    tendered for filing a service agreement for Non-Firm Point-to-Point 
    Transmission service entered into with HQ Energy Services (U.S.) Inc. 
    Service will be provided pursuant to CMP's Open Access Transmission 
    Tariff, designated rate schedule CMP--FERC Electric Tariff, Original 
    Volume No. 3, as supplemented.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    13. Pacific Gas and Electric Company
    
    [Docket No. ER99-2794-000]
    
        Take notice that on May 4, 1999, Pacific Gas and Electric Company 
    (PG&E), tendered for filing Amendment No. 1 to the Interim Short Term 
    Coordination Agreement between the Sacramento Municipal Utility 
    District (SMUD) and PG&E (Agreement). Amendment No. 1, modifies certain 
    terms and provisions of the Agreement and extends its term. The filing 
    does not modify any rate levels.
        The Agreement and its appendices were originally accepted for 
    filing by the Commission in FERC Docket No. ER98-4067-000 and 
    designated as PG&E Rate Schedule FERC No. 201.
        Copies of this filing were served upon SMUD, the California 
    Independent System Operator and the California Public Utilities 
    Commission.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    14. Great Bay Power Corporation
    
    [Docket No. ER99-2796-000]
    
        Take notice that on May 4, 1999, Great Bay Power Corporation (Great 
    Bay), tendered for filing a service agreement between Cinergy Capital & 
    Trading, Inc., and Great Bay for service under Great Bay's revised 
    Tariff for Short Term Sales. This Tariff was accepted for filing by the 
    Commission on July 24, 1998, in Docket No. ER98-3470-000.
        The service agreement is proposed to be effective April 30, 1999.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    15. Alliant Energy Corporate Services, Inc.
    
    [Docket No. ER99-2797-000]
    
        Take notice that on May 4, 1999, Alliant Energy Corporate Services, 
    Inc., tendered for filing an executed Service Agreement for short-term 
    firm point-to-point transmission service, establishing The Energy 
    Authority, Inc., as a point-to-point Transmission Customer under the 
    terms of the Alliant Energy Corporate Services, Inc., transmission 
    tariff.
        Alliant Energy Corporate Services, Inc., requests an effective date 
    of April 26, 1999, and accordingly, seeks waiver of the Commission's 
    notice requirements.
        A copy of this filing has been served upon the Illinois Commerce 
    Commission, the Minnesota Public Utilities Commission, the Iowa 
    Department of Commerce, and the Public Service Commission of Wisconsin.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. Sierra Pacific Power Company
    
    [Docket No. ER99-2798-000]
    
        Take notice that on May 4, 1999, Sierra Pacific Power Company 
    (Sierra), tendered for filing Service Agreements (Service Agreements) 
    with Energy Transfer Group, L.L.C., for both Short-Term Firm and Non-
    Firm Point-to-Point Transmission Service under Sierra's Open Access 
    Transmission Tariff (Tariff).
        Sierra filed the executed Service Agreements with the Commission in 
    compliance with Sections 13.4 and 14.4 of the Tariff and applicable 
    Commission regulations. Sierra also submitted revised Sheet No. 148 
    (Attachment E) to the Tariff, which is an updated list of all current 
    subscribers.
        Sierra requests waiver of the Commission's notice requirements to 
    permit and effective date of May 5, 1999, for Attachment E, and to 
    allow the Service Agreements to become effective according to their 
    terms.
        Copies of this filing were served upon the Public Service 
    Commission of Nevada, the Public Utilities Commission of California and 
    all interested parties.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Maine Electric Power Company Inc.
    
    [Docket No. ER99-2800-000]
    
        Take notice that on May 4, 1999, Maine Electric Power Company, Inc. 
    (MEPCO), tendered for filing a service agreement for Non-Firm Point-to-
    Point transmission service entered into with Florida Power & Light 
    Company (FPLEMT). Service will be provided pursuant to MEPCO's Open 
    Access Transmission Tariff, designated rate schedule MEPCO--FERC 
    Electric Tariff, Original Volume No. 1, as supplemented.
        MEPCO respectfully requests that the Commission accept this Service 
    Agreement for filing and requests waiver of the Commission's notice 
    requirements to permit service under the agreement to begin effective 
    as of May 4, 1999.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. Maine Electric Power Company Inc.
    
    [Docket No. ER99-2801-000]
    
        Take notice that on May 4, 1999, Maine Electric Power Company, Inc. 
    (MEPCO), tendered for filing a service agreement for Umbrella Non-Firm 
    Point-to-Point transmission service entered into with Constellation 
    Power Source, Inc. Service will be provided pursuant to MEPCO's Open 
    Access Transmission Tariff, designated rate schedule MEPCO--FERC 
    Electric Tariff, Original Volume No. 1, as supplemented.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    19. Maine Electric Power Company Inc.
    
    [Docket No. ER99-2802-000]
    
        Take notice that on May 4, 1999, Maine Electric Power Company, Inc. 
    (MEPCO), tendered for filing a service agreement for Short-Term Firm 
    Point-to-Point transmission service entered into with Constellation 
    Power Source, Inc. Service will be provided pursuant to MEPCO's Open 
    Access Transmission Tariff, designated rate schedule MEPCO--FERC 
    Electric Tariff, Original Volume No. 1, as supplemented.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. Montaup Electric Company
    
    [Docket No. ER99-2804-000]
    
        Take notice that on May 4, 1999, Montaup Electric Company 
    (Montaup), tendered for filing an executed service
    
    [[Page 27775]]
    
    agreements under Montaup's market-based power sales tariff, FERC 
    Electric Tariff, Original Volume No. 8, between Montaup and the 
    following companies:
    
    Baltimore Gas & Electric Co. (BG&E)
    DukeSolutions, Inc. (DukeSolutions)
    Enserch Energy Services, Inc. (EESI)
    FPL Energy Power Marketing, Inc. (FPL EPMI)
    
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Storm Lake Power Partners I LLC
    
    [Docket No. ER99-2805-000]
    
        Take notice that on May 4, 1999, in compliance with the 
    Commission's orders approving its market-based rate schedule, 80 FERC 
    para. 61,051 (1997) and Unreported Letter Order in Docket No. ER98-
    4643-000, dated November 10, 1998, Storm Lake Power Partners I LLC, 
    (Storm Lake I), tendered for filing a Notification of Change in Status. 
    The Storm Lake I filing describes the generation facilities of new 
    affiliates of Storm Lake I and concludes that Storm Lake I's 
    affiliation with these facilities does not alter the characteristics 
    that the Commission relied upon in approving the market-based pricing 
    for Storm Lake I.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. Storm Lake Power Partners II, LLC
    
    [Docket No. ER99-2806-000]
    
        Take notice that on May 4, 1999, in compliance with the 
    Commission's order approving its market-based rate schedule, 81 FERC 
    para. 61,058 (1997), Storm Lake Power Partners II, LLC (Storm Lake II), 
    tendered for filing a Notification of Change in Status. The Storm Lake 
    II filing describes the generation facilities of new affiliates of 
    Storm Lake II and concludes that Storm Lake II's affiliation with these 
    facilities does not alter the characteristics that the Commission 
    relied upon in approving the market-based pricing for Storm Lake II.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. Enron Power Marketing, Inc.
    
    [Docket No. ER99-2807-000]
    
        Take notice that on May 4, 1999, in compliance with the 
    Commission's orders approving its market-based rate schedule, 65 FERC 
    para. 61,305 (1993) and 66 FERC para. 61,244 (1994), Enron Power 
    Marketing, Inc. (EPMI), tendered for filing a Notification of Change in 
    Status. The EPMI filing describes the generation facilities of new 
    affiliates of EPMI and concludes that EPMI's affiliation with these 
    facilities does not alter the characteristics that the Commission 
    relied upon in approving the market-based pricing for EPMI.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    24. Enron Energy Services, Inc.
    
    [Docket No. ER99-2808-000]
    
        Take notice that on May 4, 1999, in compliance with the 
    Commission's orders approving its market-based rate schedule, 81 FERC 
    para. 61,267 (1997), and 84 FERC para. 61,214, Enron Energy Services, 
    Inc. (EES), tendered for filing a Notification of Change in Status. The 
    EES filing describes the generation facilities of new affiliates of EES 
    and concludes that EES's affiliation with these facilities does not 
    alter the characteristics that the Commission relied upon in approving 
    the market-based pricing for EES.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    25. Clinton Energy Management Services, Inc.
    
    [Docket No. ER99-2809-000]
    
        Take notice that on May 4, 1999, in compliance with the 
    Commission's order approving its market-based rate schedule, 84 FERC 
    para. 61,214 (1998), Clinton Energy Management Services, Inc. (Clinton 
    Energy), tendered for filing a Notification of Change in Status. The 
    Clinton Energy filing describes the generation facilities of new 
    affiliates of Clinton Energy and concludes that Clinton Energy's 
    affiliation with these facilities does not alter the characteristics 
    that the Commission relied upon in approving the market-based pricing 
    for Clinton Energy.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    26. Lake Benton Power Partners, LLC
    
    [Docket No. ER99-2810-000]
    
        Take notice that on May 4, 1999, in compliance with the 
    Commission's orders approving its market-based rate schedule, 80 FERC 
    para. 61,051 (1997) and Unreported Letter Order in Docket No. ER98-
    4643-000, dated November 10, 1998, Lake Benton Power Partners, LLC, 
    (Lake Benton, LLC) tendered for filing a Notification of Change in 
    Status. The Lake Benton, LLC filing describes the generation facilities 
    of new affiliates of Lake Benton, LLC and concludes that Lake Benton, 
    LLC's affiliation with these facilities does not alter the 
    characteristics that the Commission relied upon in approving the 
    market-based pricing for Lake Benton, LLC.
        Comment date: May 5, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    27. Louisville Gas and Electric Co., Kentucky Utilities Company
    
    [Docket No. ER99-2811-000]
    
        Take notice that on May 4, 1999, Louisville Gas and Electric 
    Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
    Service Agreement for Firm Point-To-Point Transmission Service between 
    LG&E/KU and FirstEnergy Corp., under LG&E/KU's Open Access Transmission 
    Tariff.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    28. Louisville Gas and Electric Co. and Kentucky Utilities Company
    
    [Docket No. ER99-2812-000]
    
        Take notice that on May 4, 1999, Louisville Gas and Electric 
    Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
    Service Agreement for Non-Firm Point-To-Point Transmission Service 
    between LG&E/KU and DukeSolutions, Inc., under LG&E/KU's Open Access 
    Transmission Tariff.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    29. Louisville Gas and Electric Co. and Kentucky Utilities Company
    
    [Docket No. ER99-2813-000]
    
        Take notice that on May 4, 1999, Louisville Gas and Electric 
    Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
    Service Agreement for Firm Point-To-Point Transmission Service between 
    LG&E/KU and DukeSolutions, Inc., under LG&E/KU's Open Access 
    Transmission Tariff.
        Comment date: May 24, 1999, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest such filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 385.214). All such motions 
    or protests should be filed on or before the comment date. Protests 
    will be considered by the Commission in determining the appropriate 
    action to be taken, but will not serve to make
    
    [[Page 27776]]
    
    protestants parties to the proceeding. Any person wishing to become a 
    party must file a motion to intervene. Copies of these filings are on 
    file with the Commission and are available for public inspection. This 
    filing may also be viewed on the Internet at http://www.ferc.fed.us/
    online/rims.htm (call 202-208-2222 for assistance).
    David P. Boergers,
    Secretary.
    [FR Doc. 99-12818 Filed 5-20-99; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
05/21/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-12818
Dates:
May 24, 1999, in accordance with Standard Paragraph E at the end of this notice.
Pages:
27772-27776 (5 pages)