01-12722. Drawbridge Operation Regulations; Manitowoc River, WI  

  • Start Preamble

    AGENCY:

    Coast Guard, DOT.

    ACTION:

    Direct final rule; confirmation of effective date.

    Start Printed Page 27868

    SUMMARY:

    On March 6, 2001, we published a direct final rule (66 FR 13433). This direct final rule notified the public of our intent to revise the operating regulations governing the Eighth Street bridge (mile 0.29), Tenth Street bridge (mile 0.43), and the Wisconsin Central (formerly Soo Line) bridge (mile 0.91), on the Manitowoc River. The direct final rule re-established the schedule published in 1983 that was erroneously removed by another rule in 1984. We have not received an adverse comment or notice of intent to submit adverse comment on this rule. Therefore, this rule will go into effect as scheduled.

    DATES:

    The effective date of the direct final rule is confirmed as June 4, 2001.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Scot M. Striffler, Project Manager, Ninth Coast Guard District (obr), at (216) 902-6084.

    Start Signature

    Dated: May 7, 2001.

    James D. Hull,

    Rear Admiral, U.S. Coast Guard, Commander, Ninth Coast Guard District.

    End Signature End Further Info End Preamble

    [FR Doc. 01-12722 Filed 5-18-01; 8:45 am]

    BILLING CODE 4910-15-U

Document Information

Effective Date:
6/4/2001
Published:
05/21/2001
Department:
Coast Guard
Entry Type:
Rule
Action:
Direct final rule; confirmation of effective date.
Document Number:
01-12722
Dates:
The effective date of the direct final rule is confirmed as June 4, 2001.
Pages:
27867-27868 (2 pages)
Docket Numbers:
CGD09-01-001
RINs:
2115-AE47: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/2115-AE47/drawbridge-regulations
PDF File:
01-12722.pdf
CFR: (1)
33 CFR 117