02-12688. Advisory Committee on Reactor Safeguards; Joint Meeting of the ACRS Subcommittees on Materials and Metallurgy and on Plant Operations; Notice of Meeting
-
Start Preamble
The ACRS Subcommittees on Materials and Metallurgy and on Plant Operations will hold a joint meeting on June 5, 2002, Room T-2B3, 11545 Rockville Pike, Rockville, Maryland.
The entire meeting will be open to public attendance.
The agenda for the subject meeting shall be as follows:
Wednesday, June 5, 2002—8:30 a.m. Until the Conclusion of Business
The Subcommittees will discuss the Root Cause Report and Repair Plan associated with the Davis-Besse vessel head degradation, the status of licensees' response to Bulletin 2001-01, “Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles,” Bulletin 2002-01, “Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity,” and data used to support findings related to the control rod drive mechanism (CRDM) penetration cracking and the reactor pressure vessel (RPV) head degradation. The purpose of this meeting is to gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the full Committee.
Oral statements may be presented by members of the public with the concurrence of the Subcommittee Chairman; written statements will be accepted and made available to the Committee. Electronic recordings will be permitted only during those portions of the meeting that are open to the public, and questions may be asked only by members of the Subcommittees, their consultants, and staff. Persons desiring to make oral statements should notify the Designated Federal Official named below five days prior to the meeting, if possible, so that appropriate arrangements can be made.
During the initial portion of the meeting, the Subcommittees, along with any of their consultants who may be present, may exchange preliminary views regarding matters to be considered during the balance of the meeting.
The Subcommittees will then hear presentations by and hold discussions with representatives of the NRC staff, Electric Power Research Institute (EPRI), Materials Reliability Program (MRP), First Energy Nuclear Operating Company (FENOC), and other interested persons regarding this review.
Further information regarding topics to be discussed, whether the meeting has been canceled or rescheduled, and the Chairman's ruling on requests for the opportunity to present oral statements and the time allotted therefor, can be obtained by contacting the Designated Federal Official, Ms. Maggalean W. Weston (telephone 301-415-3151) between 7:30 a.m. and 5:00 p.m. (EDT). Persons planning to attend this meeting are urged to contact the above named individual one or two working days prior to the meeting to be advised of any potential changes to the agenda that may have occurred.
Start SignatureDated: May 15, 2002.
Sher Bahadur,
Associate Director for Technical Support, ACRS/ACNW.
[FR Doc. 02-12688 Filed 5-20-02; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 05/21/2002
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 02-12688
- Pages:
- 35840-35840 (1 pages)
- PDF File:
- 02-12688.pdf