95-12417. American Electric Power Service Corporation, et al., Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 98 (Monday, May 22, 1995)]
    [Notices]
    [Pages 27093-27094]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-12417]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. ER95-713-000, et al.]
    
    
    American Electric Power Service Corporation, et al., Electric 
    Rate and Corporate Regulation Filings
    
    May 12, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. American Electric Power Service Corporation
    
    [Docket No. ER95-713-000]
    
        Take notice that on May 5, 1995, the American Electric Power 
    Service Corporation (AEPSC) amended its filing in the above-referenced 
    Docket to modify the method by which AEPCS will determinate the cost of 
    emission allowances.
        A copy of the filing was served upon the parties affected by the 
    amendment and the affected state regulatory commissions.
        Comment date: May 26, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    2. Southern California Edison Company
    
    [Docket Nos. ER95-830-000 ER95-831-000 ER95-832-000]
    
        Take notice that on April 28, 1995, Southern California Edison 
    Company tendered for filing a supplement to its initial filing in the 
    above three dockets.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: May 26, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    3. New England Power Company
    
    [Docket No. ER95-992-000]
    
        Take notice that on May 1, 1995, New England Power Company, 
    tendered for filing a transmission contract for service to Louis 
    Dreyfus Electric Power Inc.
        Comment date: May 26, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. Florida Power & Light Company
    
    [Docket No. ER95-993-000]
    
        Take notice that on May 1, 1995, Florida Power & Light Company 
    (FPL), tendered for filing proposed Service Agreement with the Reedy 
    Creek Improvement District for transmission service under FPL's 
    Transmission Tariff Nos. 2 and 3.
        FPL requests that the proposed Service Agreements be permitted to 
    become effective on April 1, 1995, or as soon thereafter as 
    practicable.
        FPL states that this filing is in accordance with Part 35 of the 
    Commission's Regulations.
        Comment date: May 26, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    5. Florida Power & Light Company
    
    [Docket No. ER95-994-000]
    
        Take notice that on May 1, 1995, Florida Power & Light Company 
    (FPL), tendered for filing proposed Service Agreements with the City of 
    Lake Worth for transmission service under FPL's Transmission Tariff 
    Nos. 2 and 3.
        FPL requests that the proposed Service Agreements be permitted to 
    become effective on May 1, 1995, or as soon thereafter as practicable.
        FPL states that this filing is in accordance with Part 35 of the 
    Commission's Regulations.
        Comment date: May 26, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Florida Power & Light Company
    
    [Docket No. ER95-995-000]
    
        Take notice that on May 1, 1995, Florida Power & Light Company 
    (FPL), tendered for filing proposed Service Agreements with the 
    Jacksonville Electric Authority for transmission service under FPL's 
    Transmission Tariff Nos. 2 and 3.
        FPL requests that the proposed Service Agreements be permitted to 
    become effective on April 4, 1995, or as soon thereafter as 
    practicable.
        FPL states that this filing is in accordance with Part 35 of the 
    Commission's Regulations.
        Comment date: May 26, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. Southern California Edison Company
    
    [Docket No. ER95-999-000]
    
        Take notice that on May 1, 1995, Southern California Edison Company 
    (Edison), tendered for filing the following Supplemental Agreement 
    (Supplemental Agreement) to the 1990 Integrated Operations Agreement 
    (IOA) with the City of Riverside (Riverside), FERC Rate Schedule No. 
    250, and associated Firm Transmission Service Agreement
    
    Supplemental Agreement Between Southern California Edison Company and 
    City of Riverside for the Integration of The Washington Water Power--
    Riverside Power Sale Agreement
    
    Edison-Riverside, Washington Water Power, Firm Transmission Service 
    Agreement
    
    The Supplemental Agreement and FTS Agreement set forth the terms and 
    conditions by which Edison will integrate Riverside's Washington Water 
    Power resource and provide bi-directional firm transmission service.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: May 26, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be [[Page 27094]] taken, but will not serve to 
    make protestants parties to the proceeding. Any person wishing to 
    become a party must file a motion to intervene. Copies of this filing 
    are on file with the Commission and are available for public 
    inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-12417 Filed 5-19-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
05/22/1995
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
95-12417
Dates:
May 26, 1995, in accordance with Standard Paragraph E at the end of this notice.
Pages:
27093-27094 (2 pages)
Docket Numbers:
Docket No. ER95-713-000, et al.
PDF File:
95-12417.pdf