95-12433. Williston Basin Interstate Pipeline Co.; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 60, Number 98 (Monday, May 22, 1995)]
    [Notices]
    [Page 27101]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-12433]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP95-289-000]
    
    
    Williston Basin Interstate Pipeline Co.; Notice of Proposed 
    Changes in FERC Gas Tariff
    
    May 16, 1955.
        Take notice that on May 11, 1995 Williston Basin Interstate 
    Pipeline Company (Williston Basin), tendered for filing to become part 
    of its FERC Gas Tariff, Second Revised Volume No. 1 revised tariff 
    sheets.
        Williston Basin states that the revised tariff sheets are being 
    submitted to revise its Rate Schedule ST-1 to implement a two part rate 
    structure, with a one part straight-fixed-variable (SFV) designed 
    reservation rate applicable to the Maximum Daily Delivery Quantity 
    (MDDQ) for service under Rate Schedule ST-1. In addition, Williston 
    Basin states it has revised the Gas Supply Realignment Tariff 
    provisions included as Section 39 of the General Terms and Conditions 
    of its FERC Gas Tariff, Second Revised Volume No. 1, to bill the Rate 
    Schedule ST-1 shipper the GSR cost surcharge applicable to Rate 
    Schedule FT-1 shippers and to remove Subsections 39.3.3.1.2 and 
    39.3.3.2.2 pertaining to the determination and reconciliation of the 
    Rate Schedule ST-1 reservation charge surcharge, respectively.
        Williston Basin has requested that the Commission accept this 
    filing to become effective June 13, 1995.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 385.214). All such 
    motions or protests should be filed on or before May 23, 1995. Protests 
    will be considered by the Commission in determining the appropriate 
    action to be taken, but will not serve to make protestants parties to 
    the proceeding. Any person wishing to become a party to the proceeding 
    must file a motion to intervene. Copies of the filing are on file with 
    the Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-12433 Filed 5-19-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
05/22/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-12433
Pages:
27101-27101 (1 pages)
Docket Numbers:
Docket No. RP95-289-000
PDF File:
95-12433.pdf