[Federal Register Volume 60, Number 98 (Monday, May 22, 1995)]
[Notices]
[Pages 27144-27146]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-12470]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-313]
Arkansas Nuclear One, Unit 1; Notice of Consideration of Issuance
of Amendment to Facility Operating License, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
50-313, issued to Entergy Operations Inc. (the licensee), for operation
of Arkansas Nuclear One, Unit 1 (ANO-1) located in Pope County
Arkansas.
The proposed amendment would modify the operability requirements
related to the reactor building (containment) emergency cooling system.
Following failure of one of four reactor building cooling fans, the
licensee reconfigured the reactor building cooling air and water flows
to ensure that the system could cool the reactor building after a
design basis loss of coolant accident. The licensee requested an
exigent Technical Specification (TS) change to include the reconfigured
reactor building cooling system in the TS as an authorized
configuration. NRC granted enforcement discretion on May 12, 1995 to
allow the facility to continue operation while this exigent TS is
processed.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act) and the Commission's regulations.
Pursuant to 10 CFR 50.91(a)(6) for amendments to be granted under
exigent circumstances, the NRC staff must determine that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in 10 CFR 50.92, this means that operation of
the facility in accordance with the proposed amendment would not (1)
Involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
Criterion 1: Involves a significant increase in the probability
or consequences of an accident previously evaluated.
The Reactor Building Emergency Cooling system is not an
initiator of any accident described in the ANO-1 Safety Analysis
Report. The engineering evaluation discussed [[Page 27145]] above
verifies that the green train of the Reactor Building Emergency
Cooling system remains operable and capable of performing its design
function under all postulated accident conditions. Therefore, the
probability or consequences of any previously evaluated accident is
not increased.
Criterion 2: Create the possibility of a new or different kind
of accident from any accident previously evaluated.
The subject request does not create the possibility of a new or
different kind of accident from any previously evaluated since the
green train of the Reactor Building Emergency Cooling system remains
operable and because the reactor building coolers and their
associated surveillances are not related to the creation of
accidents.
Criterion 3: Involve a significant reduction in a margin of
safety.
The subject request does not involve a significant reduction in
a margin of safety since both trains of the Reactor Building
Emergency Cooling system remain operable. The current configuration
represents a reduction in available flow; however, this is not
considered significant since required heat removal capability is
still maintained.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 15 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of the 15-day notice period. However, should circumstances
change during the notice period, such that failure to act in a timely
way would result, for example, in derating or shutdown of the facility,
the Commission may issue the license amendment before the expiration of
the 15-day notice period, provided that its final determination is that
the amendment involves no significant hazards consideration. The final
determination will consider all public and State comments received.
Should the Commission take this action, it will publish in the Federal
Register a notice of issuance. The Commission expects that the need to
take this action will occur very infrequently.
Written comments may be submitted by mail to the Rules Review and
Directives Branch, Division of Freedom of Information and Publications
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555, and should cite the publication date and page
number of this Federal Register notice. Written comments may also be
delivered to Room 6D22, Two White Flint North, 11545 Rockville Pike,
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays.
Copies of written comments received may be examined at the NRC Public
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
By June 21, 1995, the licensee may file a request for a hearing
with respect to issuance of the amendment to the subject facility
operating license and any person whose interest may be affected by this
proceeding and who wishes to participate as a party in the proceeding
must file a written request for a hearing and a petition for leave to
intervene. Requests for a hearing and a petition for leave to intervene
shall be filed in accordance with the Commission's ``Rules of Practice
for Domestic Licensing Proceedings'' in 10 CFR part 2. Interest persons
should consult a current copy of 10 CFR 2.714 which is available at the
Commission's Public Document Room, the Gelman Building, 2120 L Street,
NW., Washington, DC, and at the local public document room located at
the Tomlinson Library, Arkansas Tech University, Russellville, Arkansas
72801. If a request for a hearing or petition for leave to intervene is
filed by the above date, the Commission or an Atomic Safety and
Licensing Board, designated by the Commission or by the Chairman of the
Atomic Safety and Licensing Board Panel, will rule on the request and/
or petition; and the Secretary or the designated Atomic Safety and
Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following factors: (1) The nature of the petitioner's right under the
Act to be made a party to the proceeding; (2) the nature and extent of
the petitioner's property, financial, or other interest in the
proceeding; and (3) the possible effect of any order which may be
entered in the proceeding on the petitioner's interest. The petition
should also identify the specific aspect(s) of the subject matter of
the proceeding as to which petitioner wishes to intervene. Any person
who has filed a petition for leave to intervene or who has been
admitted as a party may amend the petition without requesting leave of
the Board up to 15 days prior to the first prehearing conference
scheduled in the proceeding, but such an amended petition must satisfy
the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference
scheduled in the proceeding, a petitioner shall file a supplement to
the petition to intervene which must include a list of the contentions
which are sought to be litigated in the matter. Each contention must
consist of a specific statement of the issue of law or fact to be
raised or controverted. In addition, the petitioner shall provide a
brief explanation of the bases of the contention and a concise
statement of the alleged facts or expert opinion which support the
contention and on which the petitioner intends to rely in proving the
contention at the hearing. The petitioner must also provide references
to those specific sources and documents of which the petitioner is
aware and on which the petitioner intends to rely to establish those
facts or expert opinion. Petitioner must provide sufficient information
to show that a genuine dispute exists with the applicant on a material
issue of law or fact. Contentions shall be limited to matters within
the scope of the amendment under consideration. The contention must be
one which, if proven, would entitle the petitioner to relief. A
petitioner who fails to file such a supplement which satisfies these
requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing, including the opportunity to present evidence and cross-
examine witnesses.
If the amendment is issued before the expiration of the 30-day
hearing period, the Commission will make a final determination on the
issue of no significant hazards consideration. If a hearing is
requested, the final determination will serve to decide when the
hearing is held.
If the final determination is that the amendment request involves
no significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a [[Page 27146]] hearing. Any hearing held would take place
after issuance of the amendment.
If the final determination is that the amendment request involves a
significant hazards consideration, any hearing held would take place
before the issuance of any amendment.
A request for a hearing or a petition for leave to intervene must
be filed with the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555, Attention: Docketing and Services
Branch, or may be delivered to the Commission's Public Document Room,
the Gelman Building, 2120 L Street, NW., Washington, DC, by the above
date. Where petitions are filed during the last 10 days of the notice
period, it is requested that the petitioner promptly so inform the
Commission by a toll-free telephone call to Western Union at 1-(800)
248-5100 (in Missouri 1-(800) 342-6700). The Western Union operator
should be given Datagram Identification Number N1023 and the following
message addressed to [APPROPRIATE PD]: petitioner's name and telephone
number, date petition was mailed, plant name, and publication date and
page number of this Federal Register notice. A copy of the petition
should also be sent to the Office of the General Counsel, U.S. Nuclear
Regulatory Commission, Washington, DC 20555, and to Nicholas S.
Reynolds, Esquire, Winston and Strawn, 1400 L Street, N.W., Washington,
D.C. 20005-3502, attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended
petitions, supplemental petitions and/or requests for hearing will not
be entertained absent a determination by the Commission, the presiding
officer or the presiding Atomic Safety and Licensing Board that the
petition and/or request should be granted based upon a balancing of the
factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
For further details with respect to this action, see the
application for amendment dated May 15, 1995, which is available for
public inspection at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room, located at the Tomlinson Library, Arkansas Tech
University, Russellville, Arkansas 72801.
Dated at Rockville, Maryland, this 16th day of May 1995.
For the Nuclear Regulatory Commission.
George Kalman,
Senior Project Manager, Project Directorate IV-1, Division of Reactor
Projects--III/IV Office of Nuclear Reactor Regulation.
[FR Doc. 95-12470 Filed 5-19-95; 8:45 am]
BILLING CODE 7590-01-M