[Federal Register Volume 62, Number 99 (Thursday, May 22, 1997)]
[Notices]
[Pages 28018-28020]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-13433]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG95-87-000, et al.]
Entergy Power Marketing Corp., et al.; Electric Rate and
Corporate Regulation Filings
May 15, 1997.
Take notice that the following filings have been made with the
Commission:
1. Entergy Power Marketing Corp.
[Docket No. EG95-87-000]
Take notice that on May 6, 1997, pursuant to Section 365.7 of the
Commission's regulations, 18 CFR 365.7, Entergy Power Marketing Corp.
filed notification that it surrenders its status as an exempt wholesale
generator under section 32(a)(1) of the Public Utility Holding Company
Act of 1935, as amended.
2. TermoEmcali I. S.C.A. E.S.P.
[Docket No. EG97-44-000]
On May 9, 1997, TermoEmcali I. S.C.A. E.S.P. (TermoEmcali), with
its address c/o International Generating Company, Inc., One Bowdoin
Square, Boston, MA 02114, filed with the Federal Energy Regulatory
Commission (FERC or the Commission) an amended application for
determination of exempt wholesale generator status pursuant to part 365
of the Commission's regulations.
TermoEmcali is a Colombian company that will be engaged directly
and exclusively in the business of owning or operating, or both owning
and operating, all or part of one or more eligible facilities to be
located in Colombia. The eligible facilities will consist of an
approximately 233 MW gas fired electric generation plant and related
interconnection facilities. The output of the eligible facilities will
be sold at wholesale.
Comment date: May 30, 1997, in accordance with Standard Paragraph E
at the end of this notice. The commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
[[Page 28019]]
3. JMC Cauca Valley, Inc.
[Docket No. EG97-45-000]
On May 9, 1997, JMC Cauca Valley, Inc. (JMCV) with its address c/o
International Generating Company, Inc., One Bowdoin Square, Boston, MA
02114, filed with the Federal Energy Regulatory Commission (FERC or the
Commission) an amended application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
regulations.
JMCV is a Cayman Islands company that will be engaged directly and
exclusively in the business of owning or operating, or both owning and
operating, all or part of one or more eligible facilities to be located
in Colombia. The eligible facilities will consist of an approximately
233 MW gas fired electric generation plant and related interconnection
facilities. The output of the eligible facilities will be sold at
wholesale.
Comment date: May 30, 1997, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
4. PacificCorp
[Docket No. ER97-2093-000]
Take notice that on May 2, 1997, PacificCorp tendered for filing an
amendment in the above-referenced docket.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
5. Southwestern Public Service Company
[Docket No. ER97-2101-000]
Take notice that on May 1, 1997, Southwestern Public Service
Company tendered for filing an amendment in the above-referenced
docket.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
6. Cinergy Service, Inc.
[Docket No. ER97-2333-000]
Take notice that on May 2, 1997, Cinergy Services, Inc. tendered
for filing a Notice of Withdrawal in the above-referenced docket.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
7. Quark Power L.L.C.
[Docket No. ER97-2374-000]
Take notice that on April 21, 1997, Quark Power L.L.C. tendered for
filing an amendment in the above-referenced docket.
Comment date: May 30, 1997, in accordance with Standard Paragraph E
at the end of this notice.
8. Southern California Edison Company
[Docket No. ER97-2655-000]
Take notice that on April 23, 1997, Southern California Edison
Company (Edison) tendered for filing a Service Agreement (Service
Agreement) with the Bonneville Power Administration for firm Point-to-
Point Transmission Service under Edison's Open Access Transmission
Tariff (Tariff) filed in compliance with FERC Order No. 888, and a
Notice of Cancellation of Service agreement No. 75 under FERC Electric
Tariff, Original volume No. 4.
Edison filed the executed Service Agreement with the Commission in
compliance with applicable Commission regulations. Edison also
submitted a revised Sheet No. 152 (Attachment E) to the Tariff, which
is an updated lists of all current subscribers. Edison requests waiver
of the Commission's notice requirements to permit an effective date of
April 24, 1997 for Attachment E, and to allow the Service Agreement to
become effective and terminate according to its terms.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
9. San Diego Gas & Electric Company
[Docket No. ER97-2730-000]
Take notice that on April 28, 1997, San Diego Gas & Electric
Company (SDG&E) tendered for filing and acceptance, pursuant to,
Service Agreements (Service Agreements) with the following entities for
Point-To-Point Transmission Service under SDG&E's Open Access
Transmission Tariff (Tariff) filed in compliance with FERC No. 888:
1. Cenerprise, Inc.
2. Cinergy Services, Inc.
3. Delhi Energy Services, Inc.
4. Electric Clearinghouse, Inc.
5. Equitable Power Services Company
6. Idaho Power Company
7. Intercoast Power Marketing
8. LG&E Power Marketing
SDG&E filed the executed Service Agreements with the Commission in
compliance with applicable Commission regulations. SDG&E also provided
Sheet No. 114 (Attachment E) to the Tariff, which is a list of current
subscribers. SDG&E requests waiver of the Commission's notice
requirement to permit an effective date of April 1, 1997 for Attachment
E, and allow the Service Agreements to become effective according to
their terms.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
10. Illinois Power Company
[Docket No. ER97-2793-000]
Take notice that on May 1, 1997, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm transmission agreements under which Archer Daniels Midland
Company will take transmission service pursuant to its open access
transmission tariff. The agreements are based on the Form of Service
Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 26, 1997.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
11. Illinois Power Company
[Docket No. ER97-2794-000]
Take notice that on May 1, 1997, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm and non-firm transmission agreements under which CMS
Marketing, Services and Trading Company will take transmission service
pursuant to its open access transmission tariff. The agreements are
based on the Form of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of May 1, 1997.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
12. Illinois Power Company
[Docket No. ER97-2795-000]
Take notice that on May 1, 1997, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm and non-firm transmission agreements under which Carolina
Power & Light Company will take transmission service pursuant to its
open access transmission tariff. The agreements are based on the Form
of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of April 11, 1997.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
[[Page 28020]]
13. Illinois Power Company
[Docket No. ER97-2796-000]
Take notice that on May 1, 1997, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing a Power Sales Tariff, Service Agreement under which Wisconsin
Public Power Company will take service under Illinois Power Company's
Power Sales Tariff. The agreements are based on the Form of Service
Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of May 1, 1997.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
14. PacifiCorp
[Docket No. ER97-2801-000]
Take notice that PacifiCorp, on May 1, 1997, tendered for filing in
accordance with 18 CFR Part 35 of the Commission's Rules and
Regulations, a proposed PacifiCorp FERC Electric Tariff, Original
Volume No. 12 (Tariff).
PacifiCorp requests that the Commission accept the Tariff for
filing and assign an effective date of July 1, 1997.
Copies of this filing were supplied to the Public Utility
Commission of Oregon and the Washington Utilities and Transportation
Commission.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
15. Illinova Power Marketing, Inc.
[Docket No. ER97-2833-000]
Take notice that on May 2, 1997, Illinova Energy Partners, Inc.
tendered for filing a Notice of Succession stating that Illinova Power
Marketing, Inc. has changed its name to Illinova Energy Partners, Inc.,
and is adopting Illinova Power Marketing, Inc.'s tariff currently on
file with the Commission, under FERC Rate Schedule No. 1 of Illinova
Power Marketing and Tariff No. 1.
Comment date: May 29, 1997, in accordance with Standard Paragraph E
at the end of this notice.
16. Union Electric Company
[Docket No. ER97-30-000]
Take notice that on April 27, 1997, Union Electric Company filed an
application, under Sec. 204 of the Federal Power Act, seeking
authorization to issue short-term, unsecured promissory notes, from
time to time, in an aggregate principal amount of not more than $600
million outstanding at any one time.
Comment date: June 12, 1997, in accordance with Standard Paragraph
E at the end of this notice.
17. Cities of Anaheim, Azusa, Banning, Colton, and Riverside,
California
[Docket No. OA97-582-000]
Take notice that on April 29, 1997, the Cities of Anaheim, Azusa,
Banning, Colton, and Riverside, California tendered for filing a
Petition for Partial Waiver of the Requirements of Orders No. 888 and
889.
Comment date: May 30, 1997, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or
protests should be filed on or before the comment date. Protests will
be considered by the Commission in determining the appropriate action
to be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of this filing are on file with the Commission and
are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-13433 Filed 5-21-97; 8:45 am]
BILLING CODE 6717-01-P