97-13442. Williams Natural Gas Company; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 62, Number 99 (Thursday, May 22, 1997)]
    [Notices]
    [Page 28018]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-13442]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. RP97-258-001]
    
    
    Williams Natural Gas Company; Notice of Proposed Changes in FERC 
    Gas Tariff
    
    May 16, 1997.
        Take notice that on May 12, 1997, Williams Natural Gas Company 
    (WNG) filed a request for a stay of the Commission's April 30, 1997 
    order in the above-captioned docket.
        WNG states that on February 24, 1997, it filed tariff sheets to 
    establish a pooling service on its system to be effective May, 1997. 
    This pooling service was intended to meet the standards proposed by the 
    Gas Industry Standards Board (GISB) and adopted by the Commission in 
    Order No. 587. On April 30, 1997, the Commission issued an order 
    requiring substantial modifications to the service proposed by WNG. 
    Those modifications will require significant computer system changes; 
    therefore, WNG states that it is unable to implement the pooling 
    service with all of the changes required by the April 30 order to be 
    effective May 1, 1997.
        WNG states that it believes the order approved April 30 reflects a 
    significant misunderstanding of the mechanics of WNG's pooling proposal 
    and the underlying operational considerations involved. Therefore, WNG 
    respectfully requests that the Commission (1) Stay the effectiveness of 
    the April 30 order pending the results of a technical conference; (2) 
    convene a technical conference to permit WNG to explain fully the 
    operation of its proposed pooling service and the effects of modifying 
    the proposal as set forth in the April 30 order; and (3) modify the 
    order based on the outcome of the technical conference.
        Alternatively, if the Commission determines that WNG must file 
    revised tariff sheets to implement pooling on May 1, WNG requests that 
    it be permitted to implement the pooling program proposed in its filing 
    with those modifications required by the April 30 order which it can 
    implement by May 1. Accordingly, WNG tendered for filing as part of its 
    FERC Gas Tariff, Second Revised Volume No. 1, the revised tariff sheets 
    listed on Appendix A to the filing, to be effective May 1, 1997.
        WNG states that a copy of its filing was served on all participants 
    listed on the service list maintained by the Commission in the docket 
    referenced above and on all of WNG's jurisdictional customers and 
    interested state commissions.
        Any person desiring to protest this filing should file a protest 
    with the Federal Energy Regulatory Commission, 888 First Street, NE, 
    Washington, D.C. 20426, in accordance with Section 385.211 of the 
    Commission's Rules and Regulations. All such protests must be filed as 
    provided in Section 154.210 of the Commission's Regulations. Protests 
    will be considered by the Commission in determining the appropriate 
    action to be taken, but will not serve to make protestants parties to 
    the proceedings. Copies of this filing are on file with the Commission 
    and are available for public inspection in the Public Reference Room.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-13442 Filed 5-21-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
05/22/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-13442
Pages:
28018-28018 (1 pages)
Docket Numbers:
Docket No. RP97-258-001
PDF File:
97-13442.pdf