ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5492-2]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared May 4, 1998 Through May 8,
1998 pursuant to the Environmental Review Process (ERP), under Section
309 of the Clean Air Act and Section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 10, 1998 (63
FR 17856).
Draft EISs
ERP No. D-AFS-B61023-NH
Rating EC2, Waterville Valley Ski Resort Project, Development of
Snowmaking Water Impoundments Project, Special-Use-Permits, Dredge and
Fill Permit and COE Section 404 Permit, White Mountain National Forest,
Pemigewasset Ranger District, Town of Waterville Valley, Grafton
County, NH.
Summary: EPA expressed environmental concerns and suggested that
the impact to water quality from alternatives two and four be further
developed in the FEIS. EPA recommended mitigation option two to offset
unavoidable wetland impacts associated with the project.
ERP No. D-COE-K32050-CA
Rating EO2, Oakland Harbor Inner and Outer Deep Navigation (-50
Foot) Improvement Project, Implementation, Feasibility Study, Port of
Oakland, Alameda and San Francisco Counties, CA.
Summary: EPA expressed environmental objections due to potential
air quality impacts, especially emissions of oxides of nitrogen (NOx)
associated with dredging, dredged material transport/disposal and
related construction work. Despite these significant NOx emissions,
there is no indication from the DEIS that NOx mitigation measures
proposed by the Corps would suffice for purposes of making a positive
conformity finding. EPA expressed serious concerns that the EIS may
have unnecessarily constrained the range of reasonable action
alternatives by eliminating a detailed analysis of dredge depths less
than -50 feet. EPA asked the Corps to determine
[[Page 28382]]
if other dredging alternatives that provide less depth overall, less
depth over portions of the project and/or phasing in -50 foot depths at
key areas first may constitute reasonable alternatives for purposes of
NEPA analysis.
ERP No. D-COE-K36124-CA
Rating EC2, Yuba River Basin Investigation Study, Flood Protection,
also portions of the Feather River Basin below Oroville Dam, City of
Maryville, Yuba County, CA.
Summary: EPA expressed environmental concerns over potential
adverse impacts to water quality due to stormwater runoff during
construction activities. EPA also recommended that the Corps conduct
the necessary hazardous, toxic and radioactive waste site
investigations during the current feasibility phase in order to achieve
full public disclosure. EPA also recommended that the FEIS analyze the
indirect/cumulative effects of induced growth in the floodplain.
ERP No. D-COE-K36125-CA
Rating EC2, Hansen Dam Water Conservation and Supply Study, Flood
Protection, Implementation, Los Angeles County, CA.
Summary: EPA expressed environmental concerns that the DEIS did not
specifically analyze an ``end of pipe'' water conservation alternative
as an alternative to increasing water supply, or as a means of
augmenting water conservation, at Hansen Dam. EPA believed that an
actual ``end of pipe'' water conservation alternative may constitute a
reasonable alternative for purposes of the Corps' NEPA analysis. EPA
noted that the three action alternatives analyzed in detail in the DEIS
are not true ``water conservation'' alternatives but are actually
alternatives to ``increase storage capacity'' at Hansen Dam for release
during peak summer use periods. Implementation and/or expansion of
water conservation programs and efforts in the dam's service area
should be an integral element of the project.
ERP No. D-COE-K39047-CA
Rating EO2, Santa Clara River and Major Tributaries Project,
Approval of 404 Permit and 1603 Streambed Alteration Agreement, In
portions of the City of Santa Clarita, Los Angeles County, CA.
Summary: EPA expressed environmental objection because of the
project's potential to adversely impact the physical and biological
qualities of the Santa Clara River System and because the measures to
avoid and/or mitigate such impacts were not fully developed and
presented in the DEIS. EPA also expressed concern that the DEIS did not
address the full scope of the anticipated (development-related) actions
and impacts directly and indirectly associated with the proposed
project.
ERP No. D-FAA-E51045-FL
Rating EC2, Miami International Airport Master Plan Update for the
Proposed New Runway, Funding and COE Section 404 Permit, Miami-Dade
County, FL.
Summary: EPA continued to have environmental concerns; though noise
impacts will be reduced by the year 2000 and 2005, significant noise-
impacts to the adjacent community remain. The need for additional noise
mitigation was stated.
ERP No. D-FRC-L05219-WA
Rating LO, Sullivan Creek Hydroelectric (FERC No. 2225) Project, An
Application for Amendment of License, Public Utility District No. 1,
Sullivan Creek, Pend Oreille County, WA.
Summary: EPA had no objection to the project as proposed. No formal
comment letter was sent to the preparing agency.
ERP No. DS-COE-C32030-00
Rating LO, Arthur Kill Channel-Howland Hook Marine Terminal,
Deepening and Realignment, Limited Reevaluation Report (LRR) Port of
New York and New Jersey, NY and NJ.
Summary: EPA believed that there has not been a significant change
in the environmental conditions of the project area since the issuance
of the FEIS. EPA does not anticipate that the proposed project would
result in significant adverse environmental impacts. Therefore, EPA has
no objection to the project's implementation.
Final EISs
ERP No. F-AFS-L65292-ID
Caribou National Forest, Implementation, Federal Phosphate Leasing
Proposal for the Manning Creek and Dairy Syncline Tracts, Caribou
County, ID.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-USN-C11013-NY
Naval Weapons Industrial Reserve Plant Calverton Disposal and
Reuse, Implementation, Towns of Riverhead and Brookhaven on Long
Island, Suffolk County, NY.
Summary: EPA continued to express environmental concern regarding
wetland avoidance and requested that the Record of Decision include
additional information on contaminant remediation, endangered/
threatened species, historic/cultural resources and environmental
justice.
Dated: May 19, 1998.
Anne Norton Miller,
Deputy Director, Office of Federal Activities.